Powered By Kitlog Pro v2.0
Pete's Bearhawk Web Site
Bearhawk
Flaps
Work Logs Found:
85
Category Work Time:
111 Hours
Date
Hours
Work Log Summary
Details
12-24-2008
1.50
Finished riveting the right aileron
Details
12-10-2008
1.00
assembled and blind riveted the left aileron.
Details
12-09-2008
1.00
Finished riveting the right aileron.
Details
12-07-2008
1.00
Flush riveted aileron nose skin.
Details
12-02-2008
1.00
Assembled the right aileron.
Details
11-28-2008
2.00
filled aileron counter balance tubes.
Details
11-14-2008
0.50
Finshed riveting the ribs to the righ aileron spar
Details
11-12-2008
1.00
Began assembling the right aileron.
Details
11-08-2008
2.50
began assembling the left aileron.
Details
11-05-2008
1.00
Finished riveting the right flap.
Details
11-03-2008
1.00
Riveted the bottom of the right flap.
Details
11-02-2008
0.50
blind riveted the nose ribs to the skin.
Details
10-29-2008
0.50
finished assembling the right flap.
Details
10-27-2008
1.00
riveted ribs onto right flap.
Details
10-21-2008
1.50
Finished riveting the left flap.
Details
10-20-2008
1.00
More riveting on the left flap
Details
10-13-2008
1.00
More riveting of the left flap.
Details
10-12-2008
0.50
Riveting left flap
Details
10-10-2008
1.00
Riveting nose skin.
Details
10-09-2008
1.50
reassembled the left flap
Details
09-29-2008
1.00
Drilled more holes in the left flap.
Details
09-03-2008
1.00
More riveting of the rear flap ribs.
Details
09-02-2008
1.50
Riveted the remainder of the flap attach angles
Details
08-27-2008
2.00
Riveting flap rib attach angles
Details
08-22-2008
1.50
Riveted attach angles...
Details
08-21-2008
0.50
Filed the flap hinge holes.
Details
08-18-2008
1.00
Cut out hinge holes on flap nose skin.
Details
08-14-2008
1.50
Finished redrilling the left flap nose skin.
Details
08-13-2008
1.00
Fit and drilled the new doubler plates.
Details
08-12-2008
0.50
Redrilled the left flap attach angles
Details
08-11-2008
1.00
(re)formed the flap hinge doublers.
Details
08-09-2008
2.50
Prepped and primed the control surfaces
Details
08-08-2008
1.00
prepped ailerons for priming
Details
08-07-2008
1.00
Finished dimpling aileron skins and spars
Details
08-06-2008
1.00
Began dimpling the ailerons.
Details
08-05-2008
1.00
finished deburring the right aileron
Details
07-21-2008
0.50
More Deburring/Disassembly or right aileron
Details
07-18-2008
1.00
More deburring the ailerons.
Details
07-16-2008
1.00
More deburring of the left aileron
Details
07-15-2008
1.00
began deburring the ailerons
Details
07-14-2008
1.00
Back on it! cut out aileron hinge holes in nose s
Details
04-30-2008
1.00
Finished drilling the aileron skins.
Details
04-22-2008
1.00
worked on the left aileron.
Details
04-21-2008
2.00
Work on the aileron gussetts was performed.
Details
04-14-2008
1.00
Cut out aileron gussetts.
Details
04-09-2008
1.50
Worked on aileron nose skins
Details
04-07-2008
1.00
Finished drilling the aileron nose skin(s)
Details
03-31-2008
1.00
resumed work on the ailerons
Details
03-15-2008
2.50
Worked on the aileron nose skins.
Details
03-09-2008
1.50
Finished bending skins and marked for first holes.
Details
02-27-2008
1.00
Worked on Brake
Details
02-26-2008
1.50
Finished drilling rear aileron ribs.
Details
02-25-2008
1.00
drilled left aileron rear ribs.
Details
02-17-2008
1.00
prepped ribs for mounting.
Details
02-10-2008
2.00
Drilled the hinge doubler plates and rear attach a
Details
02-02-2008
2.00
Drilled all the nose ribs to the aileron spars.
Details
01-23-2008
1.50
Began drilling nose rib attach angles to spar.
Details
01-22-2008
1.00
Started marking hinge locations.
Details
01-19-2008
1.50
Finished dimpling the flap skins/spars.
Details
01-15-2008
1.50
Deburring and Dimpling.
Details
01-14-2008
1.50
Deburred almost all holes in the right flap.
Details
01-08-2008
1.50
Disassembled and cut holes for flap hinges.
Details
01-07-2008
2.00
Finished drilling the right flap.
Details
01-05-2008
2.00
Finished drilling the #40 holes in the top of the
Details
01-02-2008
1.00
Drilled more holes in the right flap nose skin.
Details
01-01-2008
2.00
Drilled Right flap nose skin
Details
12-29-2007
1.50
assembled the right flap skeleton and drilled 1st
Details
10-02-2007
1.00
Finished deburring the left flap.
Details
10-01-2007
1.00
Began deburring the left flap parts.
Details
09-25-2007
1.00
Cut out hinge area and disassembled "right" flap.
Details
09-24-2007
1.00
Finished drilling the right flap.
Details
09-20-2007
0.50
Began drilling the underside of the right flap.
Details
09-19-2007
1.50
Fit and drilled gussetts to top of right flap.
Details
09-18-2007
1.50
Recut Gussets...... :-(
Details
09-17-2007
0.50
Cut out flap gussetts.
Details
09-12-2007
2.00
Drilled more on the righ flap nose skin
Details
09-11-2007
1.50
Began drilling the right flap nose skin.
Details
09-10-2007
1.00
Bent flap nose skin, aileron spar and training edg
Details
09-06-2007
1.50
Deburred and reassembled the flap skeleton.
Details
09-05-2007
1.00
Finished drilling the flap ribs to the spar.
Details
09-04-2007
1.50
Drilled and fitted the left flap ribs.
Details
08-30-2007
4.00
Finished drilling nose ribs and hinge doublers.
Details
08-29-2007
4.00
Began fitting nose ribs to the flap spars.
Details
08-21-2007
1.50
Cut aileron and flap nose skins.
Details
08-14-2007
1.50
Began prepping for the flap assembly.
Details
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
677
1060
Flaps
85
111
Flaps&Ailerons
85
111
Fuselage
12
46
Miscellaneous
1
Painting
1
2
Ribs
117
195
Shop Arranging
3
Spars
133
192
Tools
11
20
Welding
1
Wing Assembly
55
85
Wing Skinning
173
298
Copyright © 2001-2024 Matronics. All Rights Reserved.