KitLog pro

Powered By Kitlog Pro v2.0

Schroeders Sportsman
Work Logs Found: 47
Category Work Time: 82 Hours
 Date
Hours
Work Log Summary

Details

 12-16-2009
1.60
Rivet the upper trailing edg
Details
       

 05-06-2009
0.80
Trim Tab
Details
       

 05-02-2009
2.10
Fuel system and horizontal stab
Details
       

 04-06-2009
0.60
Drilled Horizontal Stabilizer
Details
     

 04-05-2009
3.40
HStab Hinge and Elevator
Details
       

 04-01-2009
0.70
Cut Hinges Elevator
Details
       

 03-29-2009
5.80
Horizontal Stabilizer
Details
       

 03-28-2009
4.50
Horizontal Stabilizer
Details
       

 03-27-2009
0.80
Reinstall Attach Bracket
Details
       

 03-22-2009
0.80
Rear spar
Details
       

 02-27-2009
0.50
New Parts
Details
     

 02-17-2009
0.70
Squaring Stab
Details
       

 02-15-2009
1.20
Horizontal Stab
Details
     

 07-15-2007
1.25
Trim the Trailing edges of the Upper skins
Details
       

 07-12-2007
0.75
Tape the lightening holes
Details
       

 07-11-2007
0.75
Rivet the lower trailing edge
Details
       

 07-11-2007
0.50
Rivet aft spar
Details
       

 04-07-2007
3.00
Rivet the left skin
Details
       

 04-01-2007
3.00
Rivet upper right skin
Details
     

 04-01-2007
4.00
Rivet the lower surface right skin
Details
     

 04-01-2007
1.00
Rivet right nose ribs
Details
       

 03-15-2007
2.00
Rivet the ribs to the forward spar 2
Details
     

 03-15-2007
1.00
Rivet Ribs to the forward spar 1
Details
       

 02-20-2007
2.00
Check attach bracket clearance with skin
Details

 01-31-2007
0.50
Rivet the replacement flanges for ribs A & B
Details

 01-31-2007
1.00
Rivet spar web doublers
Details

 01-31-2007
0.50
Install alignment pins
Details
     

 01-29-2007
1.00
Rivet Attach Bracket to the aft spar
Details
     

 01-28-2007
8.00
Dimple and countersink
Details
       

 01-28-2007
2.50
Corrosion Proof the interior
Details
       

 01-22-2007
1.00
Position and drill the spar caps
Details

 01-22-2007
0.50
Position and drill the aft attach bracket
Details
     

 01-21-2007
3.00
Disassemble and deburr
Details

 01-21-2007
1.00
Chamfer edge of forward spar caps
Details

 01-21-2007
1.00
Align and drill nose ribs
Details
       

 01-20-2007
4.00
Drill rib and spar rivet holes
Details
       

 01-13-2007
1.00
Position left skin
Details
     

 01-12-2007
2.00
Realign and drill lower right skin
Details
       

 01-12-2007
0.50
Align and drill the right side nose ribs
Details
     

 12-03-2006
4.00
Position the right skin
Details
       

 12-03-2006
0.50
Drill upper and aft spar rivet holes
Details

 12-03-2006
1.00
Drill the upper right skin
Details
     

 11-11-2006
3.25
Modify the center main ribs
Details
       

 11-04-2006
0.50
Position and drill forward spar web doublers
Details
     

 11-01-2006
1.00
Cleco main ribs to aft spar and drill
Details
     

 10-30-2006
1.00
Cleco main and nose ribs and drill
Details
     

 10-23-2006
0.50
Mark Rivet lines ribs and spar
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.