Date
|
Hours
|
Work Log Summary
|
Details
|
12-14-2007
|
1.00
|
Hang Rudder, Stabilizer, & Elevator from the ceili
|
Details
|
|
|
12-13-2007
|
3.00
|
Button up the elevator
|
Details
|
|
|
12-11-2007
|
0.00
|
KitLog Pro Bug Work Around
|
Details
|
|
|
12-11-2007
|
6.00
|
Attach connectors to the servo & begin install in
|
Details
|
|
|
12-07-2007
|
4.00
|
Complete riveting bottom of elevator, work on wiri
|
Details
|
|
|
12-06-2007
|
3.00
|
Reassemble elevator & rivet bottom side
|
Details
|
|
|
12-05-2007
|
4.00
|
Disassemble, deburr, & prime elevator
|
Details
|
|
|
12-04-2007
|
4.00
|
Install servo and check operation
|
Details
|
|
|
12-02-2007
|
4.00
|
Assemble elevator, and drill holes to final diamet
|
Details
|
|
|
11-29-2007
|
3.00
|
Install elevator trim tab hinge
|
Details
|
|
|
11-22-2007
|
3.00
|
Drill and cleco elevator cut out channel to elevat
|
Details
|
|
|
11-14-2007
|
6.00
|
Attach elevator horns to elevator
|
Details
|
|
|
11-13-2007
|
5.00
|
Drill hinge & skin, begin horn installation
|
Details
|
|
|
11-11-2007
|
6.00
|
Drill and cleco the FTTs to the stab
|
Details
|
|
|
11-10-2007
|
2.00
|
Attach extrusions to end ribs, check level
|
Details
|
|
|
11-09-2007
|
4.00
|
Drill & cleco hinge to elevator
|
Details
|
|
|
11-01-2007
|
2.00
|
Initiate FTT attachment to stab
|
Details
|
|
|
11-01-2007
|
2.00
|
Consult w/ ZAC on stab/elevator building sequence
|
Details
|
|
|
10-28-2007
|
4.00
|
Re-assembled stab and riveted
|
Details
|
|
|
10-27-2007
|
1.00
|
Deburr, clean, and prime stab. top skin & Skeleton
|
Details
|
|
|
10-25-2007
|
2.00
|
Drill the trailing edge of the stab & elevator hin
|
Details
|
|
|
08-26-2007
|
3.00
|
Drill stabilizer top skin for front spar & ribs, i
|
Details
|
|
|
08-24-2007
|
4.00
|
Press stab top skin into place, check for twist
|
Details
|
|
|
08-22-2007
|
4.00
|
Rivet stabilizer bottom skin
|
Details
|
|
|
08-21-2007
|
1.00
|
Deburr & scour the stab skin
|
Details
|
|
|
08-20-2007
|
3.00
|
Drill and cleco stab skin to rear spar-3
|
Details
|
|
|
08-18-2007
|
2.00
|
Drill and cleco stab skin to rear spar-2
|
Details
|
|
|
08-06-2007
|
2.00
|
Drill and cleco stab skin to rear spar-1
|
Details
|
|
|
08-04-2007
|
1.50
|
Deburr the stabilizer skin and attach to skeleton
|
Details
|
|
|
08-04-2007
|
2.50
|
Clamp the skeleton to the work bench
|
Details
|
|
|
07-22-2007
|
2.00
|
Clean stab parts and prime joint areas
|
Details
|
|
|
07-21-2007
|
2.00
|
Drill out skeleton holes, disassemble, deburr
|
Details
|
|
|
07-20-2007
|
3.00
|
Drill cleco rear spar to stabilizer ribs
|
Details
|
|
|
07-18-2007
|
2.00
|
Re-drill & Cleco elevator skin
|
Details
|
|
|
07-18-2007
|
2.00
|
Make new rear spar attachment, drill & cleco
|
Details
|
|
|
07-18-2007
|
3.00
|
Drill & cleco the stabilizer ribs to the front spa
|
Details
|
|
|
07-17-2007
|
2.00
|
Try to eliminate twist in elevator
|
Details
|
|
|
07-16-2007
|
2.00
|
Drill &Cleco the elevator skin to the skeleton
|
Details
|
|
|
07-11-2007
|
3.00
|
Assemble center ribs of elevator
|
Details
|
|
|
07-09-2007
|
4.00
|
Stab rear spar doubler and attachment
|
Details
|
|
|
07-08-2007
|
5.00
|
Drill & clecoe stabilizer front spar
|
Details
|
|
|
07-02-2007
|
3.00
|
Rivet rudder skin to skeleton
|
Details
|
|
|
07-02-2007
|
2.00
|
Assemble rudder skeleton
|
Details
|
|
|
07-01-2007
|
3.00
|
ScotchBrite-again, wash, prime joint areas
|
Details
|
|
|
07-01-2007
|
3.00
|
ScotchBrite the joint areas. Prepare and prime.
|
|
|
|
06-29-2007
|
2.00
|
Unclecoe rudder; Trim nose skin, ScotchBrite joint
|
Details
|
|
|
06-24-2007
|
3.00
|
Drill holes in rudder nose skin
|
Details
|
|
|
06-06-2007
|
3.00
|
Insert nose skin for drilling
|
Details
|
|
|
02-28-2007
|
2.33
|
Drill and cleco aft rudder skin
|
Details
|
|
|
02-27-2007
|
1.50
|
Drill and cleco top rib, fit aft skin
|
Details
|
|
|
02-25-2007
|
1.00
|
Drill & Cleco nose rib
|
|
|
|
02-24-2007
|
3.00
|
Rudder spar doubler + 2 ribs
|
Details
|
|