KitLog pro

Powered By Kitlog Pro v2.0

Terrences Web Site
Work Logs Found: 52
Category Work Time: 149 Hours
 Date
Hours
Work Log Summary

Details

 12-14-2007
1.00
Hang Rudder, Stabilizer, & Elevator from the ceili
Details
     

 12-13-2007
3.00
Button up the elevator
Details
       

 12-11-2007
0.00
KitLog Pro Bug Work Around
Details

 12-11-2007
6.00
Attach connectors to the servo & begin install in
Details
       

 12-07-2007
4.00
Complete riveting bottom of elevator, work on wiri
Details
     

 12-06-2007
3.00
Reassemble elevator & rivet bottom side
Details

 12-05-2007
4.00
Disassemble, deburr, & prime elevator
Details

 12-04-2007
4.00
Install servo and check operation
Details
       

 12-02-2007
4.00
Assemble elevator, and drill holes to final diamet
Details

 11-29-2007
3.00
Install elevator trim tab hinge
Details

 11-22-2007
3.00
Drill and cleco elevator cut out channel to elevat
Details
       

 11-14-2007
6.00
Attach elevator horns to elevator
Details
       

 11-13-2007
5.00
Drill hinge & skin, begin horn installation
Details
       

 11-11-2007
6.00
Drill and cleco the FTTs to the stab
Details
       

 11-10-2007
2.00
Attach extrusions to end ribs, check level
Details

 11-09-2007
4.00
Drill & cleco hinge to elevator
Details

 11-01-2007
2.00
Initiate FTT attachment to stab
Details
       

 11-01-2007
2.00
Consult w/ ZAC on stab/elevator building sequence
Details

 10-28-2007
4.00
Re-assembled stab and riveted
Details
     

 10-27-2007
1.00
Deburr, clean, and prime stab. top skin & Skeleton
Details

 10-25-2007
2.00
Drill the trailing edge of the stab & elevator hin
Details
     

 08-26-2007
3.00
Drill stabilizer top skin for front spar & ribs, i
Details
       

 08-24-2007
4.00
Press stab top skin into place, check for twist
Details
       

 08-22-2007
4.00
Rivet stabilizer bottom skin
Details
       

 08-21-2007
1.00
Deburr & scour the stab skin
Details
     

 08-20-2007
3.00
Drill and cleco stab skin to rear spar-3
Details
       

 08-18-2007
2.00
Drill and cleco stab skin to rear spar-2
Details
       

 08-06-2007
2.00
Drill and cleco stab skin to rear spar-1
Details

 08-04-2007
1.50
Deburr the stabilizer skin and attach to skeleton
Details
     

 08-04-2007
2.50
Clamp the skeleton to the work bench
Details
       

 07-22-2007
2.00
Clean stab parts and prime joint areas
Details

 07-21-2007
2.00
Drill out skeleton holes, disassemble, deburr
Details

 07-20-2007
3.00
Drill cleco rear spar to stabilizer ribs
Details
       

 07-18-2007
2.00
Re-drill & Cleco elevator skin
Details
       

 07-18-2007
2.00
Make new rear spar attachment, drill & cleco
Details

 07-18-2007
3.00
Drill & cleco the stabilizer ribs to the front spa
Details
       

 07-17-2007
2.00
Try to eliminate twist in elevator
Details
       

 07-16-2007
2.00
Drill &Cleco the elevator skin to the skeleton
Details
       

 07-11-2007
3.00
Assemble center ribs of elevator
Details
     

 07-09-2007
4.00
Stab rear spar doubler and attachment
Details
       

 07-08-2007
5.00
Drill & clecoe stabilizer front spar
Details
       

 07-02-2007
3.00
Rivet rudder skin to skeleton
Details
       

 07-02-2007
2.00
Assemble rudder skeleton
Details
       

 07-01-2007
3.00
ScotchBrite-again, wash, prime joint areas
Details
       

 07-01-2007
3.00
ScotchBrite the joint areas. Prepare and prime.
     

 06-29-2007
2.00
Unclecoe rudder; Trim nose skin, ScotchBrite joint
Details

 06-24-2007
3.00
Drill holes in rudder nose skin
Details
       

 06-06-2007
3.00
Insert nose skin for drilling
Details
       

 02-28-2007
2.33
Drill and cleco aft rudder skin
Details
       

 02-27-2007
1.50
Drill and cleco top rib, fit aft skin
Details
       

 02-25-2007
1.00
Drill & Cleco nose rib

 02-24-2007
3.00
Rudder spar doubler + 2 ribs
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.