KitLog pro

Powered By Kitlog Pro v2.0

JIM'S WEB SITE
Work Logs Found: 19
Category Work Time: 219 Hours
 Date
Hours
Work Log Summary

Details

 02-23-2006
12.00
Completed elevator @ rudder control
Details

 02-17-2006
8.00
Drilled Elevator horns,Brakes,Tailwheel
Details

 02-10-2006
5.00
Installed elevator control system
Details

 02-02-2006
12.00
Riveted of 810 BLKD and F-681
Details

 01-30-2006
5.00
Bolting Horozontal Stab in Place
Details

 01-26-2006
12.00
Empennage Installation
Details

 01-17-2006
6.00
Drilled remaining holes of the Vertical
Details

 01-16-2006
4.00
Drilling of the Vertical Stablizer
Details

 01-15-2006
3.00
Installing Vertical Stablizer
Details

 01-10-2006
10.00
Rivet F-819 aft deck
Details

 01-02-2006
3.00
Made the F-866 Rudder stops
Details

 12-28-2005
4.00
Made F-812 elevator angle
Details

 12-26-2005
10.00
Reinstalled the F811 Al bars
Details

 12-05-2005
5.00
Remove 2 811b bars
Details

 11-30-2005
10.00
Installing Horozontal Stablizer
Details

 11-17-2005
4.00
Drilling the stablizer
Details

 11-16-2005
2.00
Continued stsb preperation for level&dri
Details

 11-15-2005
4.00
Leveling stablizer and aircraft
Details

 08-28-2002
100.00

Details










Copyright © 2001-2024 Matronics. All Rights Reserved.