Powered By Kitlog Pro v2.0
JIM'S WEB SITE
RV 8
Empennage
Work Logs Found:
19
Category Work Time:
219 Hours
Date
Hours
Work Log Summary
Details
02-23-2006
12.00
Completed elevator @ rudder control
Details
02-17-2006
8.00
Drilled Elevator horns,Brakes,Tailwheel
Details
02-10-2006
5.00
Installed elevator control system
Details
02-02-2006
12.00
Riveted of 810 BLKD and F-681
Details
01-30-2006
5.00
Bolting Horozontal Stab in Place
Details
01-26-2006
12.00
Empennage Installation
Details
01-17-2006
6.00
Drilled remaining holes of the Vertical
Details
01-16-2006
4.00
Drilling of the Vertical Stablizer
Details
01-15-2006
3.00
Installing Vertical Stablizer
Details
01-10-2006
10.00
Rivet F-819 aft deck
Details
01-02-2006
3.00
Made the F-866 Rudder stops
Details
12-28-2005
4.00
Made F-812 elevator angle
Details
12-26-2005
10.00
Reinstalled the F811 Al bars
Details
12-05-2005
5.00
Remove 2 811b bars
Details
11-30-2005
10.00
Installing Horozontal Stablizer
Details
11-17-2005
4.00
Drilling the stablizer
Details
11-16-2005
2.00
Continued stsb preperation for level&dri
Details
11-15-2005
4.00
Leveling stablizer and aircraft
Details
08-28-2002
100.00
Details
SITE NAVIGATION
Contact Builder
RV 8 Home
Category
# Logs
# Hours
All
65
632
Avionics
2
13
Canopy
4
45
Cowl
2
4
Empennage
19
219
Engine
2
20
Firewall Forward Instal.
3
27
Forward baggage comparmen
2
11
Fuselage
8
48
Miscellaneous
5
22
None
1
5
Paint Booth
6
27
Painting
7
50
Propeller
1
14
Shipping Preperation
1
9
Wings
2
118
Copyright © 2001-2024 Matronics. All Rights Reserved.