Powered By Kitlog Pro v2.0
Bill's Glasair Odyssey
Glasair 1 RG
Landing Gear
Work Logs Found:
47
Category Work Time:
96 Hours
Date
Hours
Work Log Summary
Details
01-10-2009
1.75
Removed landing gear, hydraulic tubing, and hardwa
Details
01-04-2009
3.00
LH Landing Gear Trunion Mount, Nutplate Retainer B
Details
01-03-2009
3.00
LH Gear Trunion Mount Rework
Details
01-02-2009
3.00
LH trunion mount plate rework
Details
01-01-2009
2.00
Gear Door #1 Fabrication
Details
12-30-2008
2.00
Gear Door #1 Fabrication
Details
12-30-2008
2.00
Gear Door #1 Fabrication
Details
12-29-2008
2.50
Gear Door #1 (RH) and Pitot Tube Mount
Details
12-29-2008
2.50
Gear Door #1
Details
12-28-2008
3.25
Gear Door #1 Fabrication
Details
12-14-2008
2.75
Mill Fiber Nutplate Plates In Position
Details
12-07-2008
1.50
Half Fork Gear Door Mounting Holes
Details
11-26-2008
3.50
Landing Gear Alignment and Wing Skin Fitting
Details
11-26-2008
2.00
Fit Landing Gear Scissors, Brake Calipers
Details
11-25-2008
6.00
Reassembled Main Gear, Resealed Actuator
Details
11-20-2008
1.50
Landing Gear Reassembly
Details
11-19-2008
1.00
Primed Inside Landing Gear oleo strut - bottom onl
Details
11-18-2008
1.00
Corrosion Proofing Lower Landing Gear Struts
Details
06-19-2008
1.00
RH Main Gear Leg disassembly
Details
06-18-2008
1.50
LH Gear and Nose Gear Disassembly
Details
06-10-2008
2.00
Installed LH Gear side brace brackets
Details
06-07-2008
4.00
Powder coated parts, riveted nutplates
Details
06-06-2008
1.30
Sandblasted LH gear spacers and nutplate holders
Details
06-05-2008
0.50
Sandblasted Side Brace Brackets
Details
06-03-2008
1.50
LH Main Gear Removal and Parts Prep
Details
05-31-2008
0.60
Nose Wheel Cosmetics
Details
05-30-2008
0.60
Nose Wheel Cosmetics
Details
05-27-2008
1.00
RH Gear Side Brace and Nutplate plate installation
Details
05-26-2008
0.75
Machined Scissor installation
Details
05-25-2008
8.00
Powdercoating, Riveting Nutplates
Details
05-24-2008
5.50
RH Main Gear Removal - Parts Prep
Details
05-23-2008
1.50
Finished Bulkhead brackets and backing plates
Details
05-21-2008
1.00
Hydraulic and Brake Bulkhead Fitting Brackets
Details
05-16-2008
1.00
Hydraulic Bulkhead Fittings Union Backplates
Details
05-12-2008
1.50
Hydraulic line installation
Details
05-11-2008
1.00
Hydraulic Tube Installation
Details
05-10-2008
4.00
Hydraulic Tubing Installation
Details
04-28-2008
0.75
Drilled path throughs for hydraulic bulkheads in r
Details
04-26-2008
2.00
Bulkhead Recesses - Layups
Details
04-25-2008
0.50
Gear Hydrualic Bulkhead Fittings - Qcell Foam
Details
04-23-2008
2.00
Main Gear Hydraulic Line - Blkhd Fitting Provision
Details
04-22-2008
2.00
Main Gear Hydraulic Line - Blkhd Fitting Provision
Details
08-27-2007
1.75
Trimmed Lay-Up - Layed-up Another 2 Ply
Details
08-04-2007
1.00
Nose Gear Updates
Details
07-21-2007
2.50
Nose Gear Fork Modification
Details
05-29-2007
0.50
Gear Door #3 Wear Blocks
Details
04-17-2007
0.25
Drag Brace - Bushing Installation
Details
SITE NAVIGATION
Contact Builder
Eagle II Home
Glasair 1 RG Home
Category
# Logs
# Hours
All
430
869
Ailerons and Flaps
71
134
Avionics
1
2
Controls - Hardware
31
44
Engine
7
7
Finishing
4
8
Fuselage
2
4
Jig Fabrication
13
38
Kit Pick Up
10
Landing Gear
47
96
Layups - Misc
11
11
Metal Fab-Alum
14
28
Metal Fab-Sheet Met
14
26
Metal Fab-Steel
7
12
Miscellaneous
10
16
Molds
4
4
Rudder Pedals
1
0
Shop Prep
7
18
Shop Supplies
1
1
Wings
175
420
Copyright © 2001-2025 Matronics. All Rights Reserved.