Powered By Kitlog Pro v2.0
SEAN'S WEB SITE
RV9A
Empennage
Work Logs Found:
50
Category Work Time:
117 Hours
Date
Hours
Work Log Summary
Details
10-27-2007
3.00
Left Elevator Trailing Edge
Details
10-06-2007
4.00
Riveted Rt. Elevator Spar and Ribs
09-29-2007
5.00
Riveted Skin to Spar and Stiffeners
Details
09-02-2007
5.50
Dimpled Left Elevator Skin, Built Skeleton
Details
09-01-2007
3.00
Dimpled, Deburred and Prepped left Elevator
Details
08-25-2007
4.00
Fabricated Stiffeners
Details
05-20-2007
2.00
Prepped Right Elevator Trailing Edge
Details
05-19-2007
2.50
Riveted Rt. Elevator Spar and Ribs
Details
05-18-2007
1.00
Back Riveted Stiffeners to Lower Skin
Details
05-16-2007
2.00
Final Assembled Counterbalance Arm Assembly
Details
05-16-2007
0.50
Drilled Out and Replaced Rivet
Details
05-15-2007
1.50
Riveted Right Elevator Spar to Skin
Details
05-12-2007
2.00
Riveted Skeleton and Stiffeners
Details
05-10-2007
1.00
Primed Skeletal Structure of Right Elevator
Details
05-10-2007
3.00
Dimpled Right Elevator Skin
Details
05-09-2007
3.50
Dimpled, Deburred and Prepped Right Elevator
Details
05-07-2007
1.50
Match Drilled Counterbalance Arm Assembly
Details
05-06-2007
1.00
Clecoed Counterbalance Arm Assembly
Details
05-05-2007
1.00
Fluted Tip Ribs
Details
05-02-2007
3.50
Grind and Shape Stiffeners
Details
05-01-2007
1.50
Cut Stiffeners for Right Elevator
Details
04-30-2007
2.25
Finish Rudder and Prep Right Elevator
Details
04-25-2007
1.75
Formed Leading Edge of the Rudder
Details
04-24-2007
2.00
Rudder Trailing Edge
Details
04-23-2007
1.00
Riveted Rudder Horn Brace
Details
04-22-2007
2.00
Applied Sealant to Rudder Trailing Edge
Details
04-21-2007
0.50
Removed Trailing Edge Clecoes and Strip
Details
04-21-2007
0.50
Removed Trailing Edge Clecoes and Strip
Details
04-20-2007
1.00
Rivet Rudder Horn Brace and Bottom Rib
Details
04-17-2007
1.50
Replaced Rudder Horn Brace
Details
03-24-2007
2.25
Riveted Rudder Assembly
Details
03-23-2007
2.00
Clecoed Rudder Skins to Rudder Skeleton
Details
03-18-2007
1.50
Assembled Rudder Counterbalance
Details
03-16-2007
1.00
Prepared Conterbalance Weight and Rib
Details
03-16-2007
2.00
Dimpled Rudder Skins
Details
03-14-2007
2.00
Rudder Spar, Bottom Rib and Rudder Horn Assembly
Details
03-04-2007
3.25
Deburring and Dimpling Rudder Components
Details
03-03-2007
7.00
Prepped Rudder Skeleton
Details
02-18-2007
2.75
Back Riveted Stiffeners to Rudder Skins
Details
02-17-2007
4.50
Cut and Formed Rudder Stiffeners
Details
02-10-2007
4.75
Complete Vertical Stabilizer.
Details
02-07-2007
1.50
Vertical Stabilizer Skin Preperation
Details
02-03-2007
1.75
Vertical Stabilizer Rear Spar Assembly
Details
01-25-2007
2.75
Vertical Stabilizer Dimpling
Details
01-21-2007
2.25
Vertical Stabilizer Deburr, Drill and Countersink
Details
01-20-2007
4.50
Clecoed and Final Drilled Vertical Stab Assembly
Details
01-19-2007
0.75
Prepared Vertical Stabilizer
Details
11-28-2006
2.75
Riveted Left Horizontal Stab Skin to Ribs and Spar
Details
10-26-2006
2.00
Unpacked and inventoried empennage kit.
Details
10-24-2006
1.50
Picked up empannage kit
Details
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
54
141
Empennage
50
117
Miscellaneous
2
18
Wings
1
2
Workshop Set-up
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.