Powered By Kitlog Pro v2.0
Peters RV-7 Web Site
RV-7
Engine
Work Logs Found:
27
Category Work Time:
80 Hours
Date
Hours
Work Log Summary
Details
05-19-2008
4.00
Baffle seals/Emp fairing
05-17-2008
4.00
Fitting the baffle seals
Details
05-17-2008
4.00
Fitting the baffle seals
Details
03-22-2008
1.00
Re- fitting airbox
Details
03-22-2008
4.00
Engine plumbing
Details
03-22-2008
4.00
Engine plumbing
03-21-2008
1.00
Engine
03-20-2008
6.00
Engine wiring and plumbing
Details
03-19-2008
4.00
HT lead baffle pass throughs
Details
03-17-2008
1.00
Oil quick drain valve
Details
03-11-2008
2.00
Engine
Details
03-10-2008
2.00
EGT probe wiring /Exhaust hangers
Details
03-06-2008
2.00
Oil cooler/baffles
Details
03-05-2008
2.00
Fitting and tieing the baffles
Details
03-04-2008
8.00
Baffle ties
Details
03-03-2008
4.00
EGT probes and baffle tie doublers
Details
02-18-2008
2.00
Throttle bracket
Details
02-17-2008
6.00
Throttle and mixture brackets
Details
02-16-2008
4.00
Re-fitting the engine and gear
05-07-2007
2.00
Plumbing the engine
05-07-2007
2.00
Plumbing the engine
05-07-2007
4.00
Exhaust fitting
Details
05-07-2007
2.00
Alternator fitting
05-06-2007
1.00
Fuel pipes
05-05-2007
2.00
Fitting the engine
Details
05-05-2007
1.00
Engine arrives
05-04-2007
1.00
The Engine arrives
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
389
1553
Avionics
7
17
Controls
15
36
Cowl
7
21
Empennage
22
182
Engine
27
80
Firewall Forward
43
109
Fuselage
93
408
Gear
14
42
Interior
1
4
Miscellaneous
22
67
None
1
1
Panel
12
37
Prop
3
4
Systems
17
53
Wings
85
384
Wiring
20
108
Copyright © 2001-2024 Matronics. All Rights Reserved.