Powered By Kitlog Pro v2.0
Barracuda
Barracuda
Landing Gear
Work Logs Found:
44
Category Work Time:
158 Hours
Date
Hours
Work Log Summary
Details
05-20-2009
8.00
main door interferance
Details
04-23-2009
0.00
Hydruilic position indicator sheme overview 2
Details
02-25-2009
4.00
303-4 hyd hoses
Details
02-24-2009
5.00
tubes , wheels and brakes
Details
02-13-2009
8.00
hydrulic lines wheel well
Details
02-11-2009
3.00
hydrulic lines
Details
02-10-2009
3.00
hydrulic lines
Details
02-07-2009
1.00
over center spring
Details
01-31-2009
4.00
final install main langing gear
Details
01-30-2009
4.00
side brace pivot
Details
01-29-2009
2.00
make plates for pivot washers
Details
01-11-2009
6.00
install mains on center section
Details
01-10-2009
6.00
assemble main landing gear
Details
01-08-2009
2.00
clean assemble lower leg
Details
01-07-2009
3.00
gear prep for assembly
Details
01-06-2009
3.00
clean up main gear
Details
01-05-2009
8.00
prep and paint
Details
01-03-2009
4.00
powder coating
Details
01-02-2009
4.00
powder coat main gear
Details
01-01-2009
3.00
Prep for powder coat
Details
12-30-2008
1.00
grease zerts
Details
12-30-2008
3.00
Dissasemble for paint
Details
10-08-2008
5.00
secondary door hard points
Details
08-29-2008
2.00
secondary gear door hydrulic cylinder
Details
06-10-2008
3.00
seting side stay brackets
Details
06-10-2008
20.00
locate fit fabricate
Details
06-10-2008
2.00
landing gear stops Mains
Details
06-10-2008
0.00
landing gear notes
Details
06-10-2008
0.00
hardware issues landing gear
Details
05-18-2008
2.00
finish out LG Brackets
Details
05-15-2008
3.00
Main over center link
Details
05-12-2008
2.00
landing gear mounts
Details
05-11-2008
2.00
assemble gear
Details
06-01-2007
0.00
update
Details
05-18-2007
3.00
finish brace - jiged for tig
Details
05-09-2007
2.00
Press fork to lower leg
Details
05-08-2007
1.00
prep fork for press fit
Details
05-06-2007
5.00
steering antler
Details
04-25-2007
1.50
Brace assembly
Details
04-18-2007
2.00
fabricat Brace assembly
Details
04-17-2007
4.00
Nose gear assembly
Details
04-14-2007
6.00
MLG
Details
04-08-2007
6.00
Main Landing Gear
Details
04-07-2007
2.00
main landing gear fabrication
Details
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
626
1856
Ailerons
39
114
Center section
138
477
Empennage
81
242
Fuselage
184
529
Hardware
6
12
Landing Gear
44
158
Metal Block 1
15
15
Metal Block 1 - open
2
Metal Block 2
12
13
Metal Block 2 open i
4
Metal Block 3
5
13
Miscellaneous
9
1
Tech councilor / ins
4
10
wing outer panels
83
272