KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
Work Logs Found: 18
Category Work Time: 0 Hours
 Date
Hours
Work Log Summary

Details

 09-28-2014
0.00
Built a yard shed
Details
     

 05-05-2013
0.00
Rearranged shop
Details
       

 12-05-2012
0.00
Salvaged drawing cabinets from work for the shop.
Details
       

 11-05-2012
0.00
Put retractable gear on work bench
Details
       

 05-20-2012
0.00
Rearranged shop for fuselage assembly.
Details
       

 01-16-2012
0.00
Organized tools on peg board
Details
       

 10-06-2011
0.00
Moved back into the shop
Details
       

 10-03-2011
0.00
Applied a second coat to some of the floor
Details
       

 10-02-2011
0.00
Epoxy coated the shop floor today
Details
       

 10-01-2011
0.00
Prepped shop floor for epoxy coating
Details
       

 04-22-2011
0.00
Installed screen for 16' x 7' garage door.
Details
     

 06-25-2007
0.00
Cleaned and rearranged the shop.
Details
       

 06-20-2007
0.00
Finished building the work table.
Details
       

 06-19-2007
0.00
Started building a 3' X 8' Work Table
Details
       

 06-11-2007
0.00
Finished Major Portion of Shed
Details
       

 05-01-2007
0.00
Put some siding on the shed.
Details
       

 04-22-2007
0.00
Framed walls and hung plywood sheeting for storage
Details
       

 04-15-2007
0.00
Laid out sill and hung storage area ceiling
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.