KitLog pro

Powered By Kitlog Pro v2.0

N114FM - Vision #243
Work Logs Found: 59
Category Work Time: 108 Hours
 Date
Hours
Work Log Summary

Details

 09-30-2006
1.50
Sanded Last Tip, Hinges Cut, & Prep'd For Fold-A-P
Details

 09-27-2006
1.50
Sanded Micro-Filled Tip
Details

 09-23-2006
0.70
Filled One Tip with Micro
Details
       

 09-19-2006
1.50
Cut Bottom Stab Flange
Details
       

 09-14-2006
2.00
Tips and Bottom Flange
Details

 09-09-2006
3.50
Trimmed Topside Flange
Details

 09-06-2006
1.30
Sanded Bottom Side UNI
Details
       

 09-03-2006
0.70
Sanded Overlap of Bottom UNI Application
Details

 09-03-2006
2.00
Applied UNI to Bottom Side
Details

 09-02-2006
1.50
UNI to Top Side
Details

 08-31-2006
1.50
Sanded Top Side BID
Details

 08-30-2006
2.00
BID Applied to Top Side
Details

 08-27-2006
1.00
Sanded Bottom Side Overlap
Details

 08-26-2006
2.00
Sanded Top Uni
Details

 08-26-2006
2.50
Applied BID to Bottom Side
Details

 08-25-2006
3.50
Sanded Bottom & Applied Uni to Top
Details

 08-20-2006
2.00
Sanded, Prepped, and Applied Uni to Bottom Skin
Details

 08-19-2006
0.70
Prep Sanded and Cut Uni Cloth
Details

 08-19-2006
1.00
Applied one layer of Uni to leading edge
Details

 08-18-2006
1.50
Sanding & Filling
Details

 08-17-2006
2.00
Sanding & Filling
Details

 08-16-2006
1.00
Sanded & Filled
Details

 08-11-2006
3.00
Sanding & Filling Top & Bottom
Details

 08-11-2006
2.50
Sanding & Filling
Details

 08-06-2006
1.50
Sanded & Filled Again
Details

 08-05-2006
0.50
Sanding
Details

 08-05-2006
2.00
Finished Sanding & Filled More Low Spots
Details

 07-30-2006
0.50
Filled Top Side
Details

 07-29-2006
1.50
Sanding
Details

 07-29-2006
1.00
Filled Bottom Side
Details

 07-22-2006
2.50
Leading Edge Sanding & Micro
Details

 07-19-2006
1.50
Leading Edge Sanding
Details

 07-08-2006
3.00
Sanding and filling & leveling
Details

 07-01-2006
3.50
Finishing Work
Details

 06-24-2006
4.20
Sanded Left & Right Halves of Bottom
Details

 06-17-2006
2.50
Bottom Side Sanding and Micro Work
Details

 06-10-2006
2.50
Sanded Left Side
Details

 06-03-2006
2.00
Sanded Left Side (Bottom)
Details

 04-29-2006
2.00
Bottom Airfoil
Details

 02-18-2006
1.50
Sanding & Contemplating...
Details

 02-17-2006
1.70
Finishing Work - Top
Details

 02-16-2006
3.00
Tip Sections Removed
Details

 02-15-2006
2.50
Removed Leading Edges
Details

 02-10-2006
0.30
Sanded leading edge - Bottom Stab
Details

 02-07-2006
2.00
Bottom of Stab
Details

 02-04-2006
4.00
Sanding Top/Bottom of Stab
Details

 02-04-2006
2.50
Sanding & Micro'd (Again)
Details

 02-03-2006
1.30
Micro'd Top Side
Details

 02-03-2006
1.50
Micro'd Bottom Side
Details

 02-02-2006
1.50
Topside Prep of Stab
Details

 02-01-2006
1.00
Prep for Glass
Details

 01-31-2006
3.00
Sanding, Flaring & Trimming
Details

 01-30-2006
1.00
Removed formers for hinge flanges
Details

 01-29-2006
3.50
Remaining 2-BID Applied to Stab
Details

 01-28-2006
4.50
Flange for Elevator Hinges
Details

 01-05-2006
0.00
Last of the H-Stab Pics
Details
       

 01-04-2006
0.00
Even More Stab Pics
       

 01-03-2006
0.00
More Stab Pictures!
       

 01-02-2006
0.00
More Stab Pictures Found
       










Copyright © 2001-2024 Matronics. All Rights Reserved.