Powered By Kitlog Pro v2.0
Buds Web Site
RV-12
Empennage
Work Logs Found:
47
Category Work Time:
130 Hours
Date
Hours
Work Log Summary
Details
08-24-2010
0.20
Bend Tabs
Details
08-23-2010
4.00
Remove empennage assemblies from Tailcone
Details
08-17-2010
5.00
Odds and Ends
Details
07-24-2010
1.20
Riveted nutplates to tailcone
Details
07-23-2010
2.00
Nutplates clecoed to the tailcone assembly
Details
07-21-2010
3.00
Preparing the attatchments of the tail cone to the
Details
07-12-2010
1.50
Continuing with fairing after attaching Stabilator
Details
07-08-2010
3.00
Working with the tail cone fairing.
Details
07-04-2010
3.00
Re-attaching the stabilator to the tail cone
Details
06-17-2010
5.00
Tail cone fairing continued...
Details
06-15-2010
5.00
More tail cone fairing
Details
06-12-2010
3.00
Tail cone fairing fabrication
Details
05-25-2010
2.50
Fabrication of tailcone fairing
Details
05-10-2010
3.00
V-Stab Fairing match drilled and clecoed
Details
05-07-2010
2.50
Fitting the V-Stab close to the aft part of the ru
Details
05-05-2010
2.00
removing extraneous polyester from rudder tip fari
Details
05-03-2010
2.50
Continuing torture of removing assemblies
04-30-2010
3.00
Masking,3/4 drilling of fiberglass tail cone fair
Details
04-29-2010
1.00
Re attaching the V-stab to the tailcone
Details
04-28-2010
2.00
fitting fairings for V-stab and Rudder
Details
04-23-2010
2.00
Working with fiberglass
Details
04-19-2010
4.00
Re do and Re-re do
Details
04-17-2010
4.00
Screwing skins and tightening bolts
Details
04-07-2010
2.00
Testing the AST Assembly Travel
Details
04-03-2010
4.00
Trim/Servo Assembly Installation
Details
03-20-2010
1.00
Parts fabrication
Details
03-20-2010
1.00
Deburring, placing and sanding gromets
Details
03-18-2010
4.00
Stabilator Counterbalance and Attachment
Details
03-18-2010
1.50
Anti-servo assembly attached and wired
Details
03-15-2010
4.00
Installation of V-Stab and Rudder.
Details
03-15-2010
0.00
Fun with the computer
Details
12-10-2009
6.00
Riveting continues
Details
12-04-2009
2.00
Rivets, rivets, everywhere and Coleridge not aroun
Details
12-03-2009
6.50
Clecoing and Riveting skins
Details
11-30-2009
3.00
placing, clecoing, riveting; 1279, and 1280 skins
Details
11-29-2009
1.00
Using a Cushion Clamp to route the WH-P30
Details
11-20-2009
2.00
Chaffing resolution
Details
11-16-2009
2.30
The Static Air System
Details
11-13-2009
3.00
wiring and stringing
Details
11-11-2009
2.00
Pneumatic Riveting
Details
11-11-2009
3.50
Frames (like scrawning bulkheads) & Skins
Details
11-09-2009
3.00
Stabilator Hinge Washers assembly
Details
11-05-2009
4.60
Finishing the F-1211 Assembly
Details
11-03-2009
2.30
Initial preps of eventual F-1211 Assembly
Details
11-02-2009
2.50
Fabrication and Bulkhead doubler prep
Details
10-31-2009
3.00
Fuselage Frames
Details
10-30-2009
1.00
Hard Drive fatal crash
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
131
834
Empennage
47
260
Flaperon
1
3
Fuselage
52
309
Garage Preparation
2
29
inventory
1
3
Miscellaneous
1
11
Wings
27
219
Mary B Home
Copyright © 2001-2025 Matronics. All Rights Reserved.