Cleve's Web Site
Work Logs Found: 87
Category Work Time: 283 Hours
 Date
Hours
Work Log Summary

Details

 12-03-2007
3.50
Nose gear tube changed- Starter & solenoid rewired
Details
       

 12-01-2007
4.00
Wiring & plumbing completed - Engine pre-oiled
Details
       

 11-30-2007
3.50
All probes wired-prop safety wired
Details
       

 11-28-2007
4.00
Engine wiring-painted outside of cowl
Details
       

 11-27-2007
3.50
Cowl pins, cowl epoxied, left wing root fairing
Details
       

 11-23-2007
3.00
Installed oil door on cowl
Details
       

 11-22-2007
3.50
Installed man pressure, throttle & mixture cables
Details
       

 11-21-2007
4.00
Spinner finished-Starter wiring completed
Details
       

 11-20-2007
3.50
Worked on spinner & starter wiring
Details
       

 11-19-2007
4.00
Beginning spinner installation
Details
       

 11-17-2007
4.00
Plumbed fuel & oil-Wired alternator/starter
Details
       

 11-16-2007
3.00
Spinner installation begun
Details
       

 11-15-2007
3.00
Fuel & oil press. wired;Seat belts installed
Details
       

 11-14-2007
3.00
Carb heat muff & man pressure installed
Details
       

 11-13-2007
4.00
Hung exhaust & carb heat cable-Wired both mags
Details
       

 11-12-2007
4.00
Nut plates- hinge pins on cowl
Details

 11-09-2007
3.50
Hanging tail pipes-Installing cowl with hinges
Details
       

 11-08-2007
4.00
Cowl hinges, air box seals installed-Air scoop epo
Details
       

 11-07-2007
3.00
Fit cowl to air box/Fit side hinges
Details

 11-05-2007
4.00
Sanded air scoop, laid micro & fiber glass
Details
       

 11-02-2007
2.50
Air scoop fiberglassed-air box sealed
Details
     

 11-01-2007
3.50
Air box riveted-Foam ramp cut to shape
Details
       

 10-31-2007
3.00
Carb heat door, lever, & intake-Foam sealed in pla
Details
       

 10-30-2007
3.00
Foam fit to air intake-Manifold pressure installat
Details
       

 10-29-2007
1.00
Worked on air filter seal
Details

 10-26-2007
2.50
Air gasket remade using pro-seal-Mag blast tubes
Details
       

 10-25-2007
3.00
Cut & fit carb heat inlet & door
Details
       

 10-24-2007
3.50
Air box fit, drilled, & carb heat door fabricated
Details
       

 10-23-2007
4.00
Nut plates on top plate-Top plate fluted & bent
Details
       

 10-22-2007
3.50
Started work on filtered air box
Details

 10-19-2007
4.00
All air seals finished-Air filter removed from pla
Details
       

 10-18-2007
2.50
Worked on air seals on right nose
Details

 10-16-2007
3.00
Started on air box-glassed the gaps in inlet ramps
Details
       

 10-15-2007
2.50
Inlet ramps glassed in top cowl
Details

 10-12-2007
3.00
Front seals under construction
Details
       

 10-11-2007
3.00
Air seals on sides worked on
Details
       

 10-10-2007
3.50
Begun attaching air seals, some metal work
Details
     

 10-09-2007
3.50
More baffle work
Details
     

 10-08-2007
3.00
Baffles & more baffles
Details

 10-05-2007
3.50
Rear baffles riveted to side baffles
Details
       

 10-04-2007
4.00
Left side-floor-front baffles completed & mounted
Details
       

 10-03-2007
3.50
Left frnt, side and floor baffles assembled & rive
Details
     

 10-02-2007
3.00
Oil cooler mounting
Details
       

 10-01-2007
3.50
Oil cooler mounting begun
Details
       

 09-28-2007
3.50
Cowl nose filling-Fuel pump overflow-Baffle floor
Details
       

 09-27-2007
3.50
Air exit bracket - oil cooler brace worked on
Details
       

 09-26-2007
4.00
Exit air bracket - cabin heat muff
Details
       

 09-25-2007
4.00
Exit air atach brackets fabricated
Details
     

 09-21-2007
3.50
Side covers 904 bulkhead-Camlocks installed
Details
       

 09-20-2007
3.50
Installed cam lock receivers-Oil cooler brace dril
Details
       

 09-19-2007
3.00
Finished wind screen-Installed some cowl hinges
Details
     

 09-18-2007
3.00
Air inlet ramp installation/wind screen fairing wo
Details
       

 09-17-2007
4.00
Baffles trimmed last time?-Oil cooler brace-EIS pr
Details
       

 09-14-2007
3.00
Wind screen fairing-Fnt. bulkhead trimming
Details
       

 09-13-2007
3.50
Forward bulkhead fit to both floors
Details
       

 09-12-2007
3.50
Worked on Rt baffle floor/ wind screen
Details
       

 09-11-2007
3.00
More baffle work- Angles on Rt. & Lt. floors
Details
     

 09-10-2007
3.50
Baffle floors and forward side fitting
Details
       

 09-07-2007
3.00
Struggled with left & right baffle floors
Details
     

 09-06-2007
3.00
More baffle work
Details
       

 09-05-2007
3.00
Baffle-cowl clearance set on 5 of 6 baffles
Details
       

 09-04-2007
3.00
Worked on rear side and aft baffles
Details
     

 09-03-2007
4.00
Worked on left side and rear baffles
Details
       

 08-31-2007
3.00
Cutting baffles to fit
Details
       

 08-30-2007
3.50
1st go at baffles- Baffling!!!!
Details
       

 08-29-2007
3.00
Drilled all the hinges & camlock hinge strip
Details
     

 08-28-2007
3.00
Drilled side hinges and more fitting of cowl
Details
       

 08-27-2007
3.00
Cowling filed to fit and anchored to the lower hin
Details
     

 08-24-2007
3.00
More fitting on cowl
Details

 08-23-2007
3.50
Fitting cowl continues
Details
       

 08-22-2007
3.00
Fitting of cowls continues
Details
       

 08-21-2007
3.00
Top cowl cut to length-working on lower cowl
Details
       

 08-16-2007
3.00
Mounted prop, Fit cowl, Rolled N417CT for 1st time
Details
       

 08-15-2007
3.50
Fit spinner- Mounted prop, back plate, & extension
Details
       

 08-14-2007
2.50
Marked spinner for cutting-Filed wind screen fairi
Details
       

 08-10-2007
2.50
Installed electric primer-#1 piston TDC
Details

 08-09-2007
2.50
Worked on mounting strips for Cowl Camlocks
Details
     

 08-08-2007
3.00
Backing plate-spacer assembly/Camlock mount strip
Details
       

 08-07-2007
3.00
Fuel lines-exhaust hangers
Details
       

 08-06-2007
3.00
Filled wind screen fairing-Cut flange lower cowl
Details
       

 08-01-2007
3.00
Wind screen-canopy fairing/Elec primer/tach cable
Details
       

 05-26-2007
3.00
Alternator, exhaust pipes, & carb installed
Details
     

 05-23-2007
3.00
Engine hung!!!!
Details
     

 04-08-2007
1.00
Battery mounted- Panel now on battery master
Details
       

 03-09-2007
4.00
Gascolator & doubler, fuel line, wing gap seal
Details
       

 03-08-2007
3.50
Installed relays, battery box & gascolator doubler
Details
       

 03-07-2007
3.00
Worked on battery box & relays
Details
     