KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
Work Logs Found: 353
Category Work Time: 570 Hours
 Date
Hours
Work Log Summary

Details

 05-22-2014
0.50
Sealant added to Brake Line and Fuel Pump Vent
Details
     

 05-22-2014
1.00
Riveted Nutplates to Front Plenum Brackets
Details
       

 05-22-2014
2.00
Modified Doublers for Nutplates on Plenum
Details
     

 05-22-2014
2.00
Glassed Corner of Plenum
Details
       

 05-21-2014
4.00
Riveted Nutplates to Plenum
Details
       

 05-21-2014
1.00
Made Aluminum Tube for Fuel Pump Vent Line
Details
       

 05-21-2014
0.50
Installed Heat Shields on Exhaust Pipes
Details

 05-10-2014
4.00
Worked on Plenum
Details

 05-09-2014
1.50
Made a Cable-End Fastener for Oil Cooler Cable
Details
       

 05-08-2014
4.00
Removed Cowling/Worked on Moving Wires
Details

 05-07-2014
7.00
Moved Wires/Adjusted Plenum Flange/Visitor
Details
       

 05-07-2014
1.00
Looked over Engine Compartment
Details

 05-07-2014
2.00
Helped with Plenum
Details

 05-06-2014
3.50
Tech Counselor Visit
Details
       

 05-06-2014
6.50
Firewall Forward Adjustments
Details
       

 04-09-2014
0.50
Had Firesleeve Applied to Fuel Line
Details
       

 04-08-2014
1.00
Removed and Flared Fuel Line-Firewall-Gascolator
Details
     

 11-27-2012
0.50
Changed Out Hobbs Meter Pressure Switch
Details
       

 10-20-2012
3.00
Changed Hobbs Switch Wire to Ground
Details
     

 10-19-2012
2.50
Made Power Wire for Hobbs Pressure Switch
Details
       

 10-18-2012
2.00
Reinstalled In-Line Fuse Holder/Oil Press Wire
Details
       

 10-13-2012
2.50
Finished Low Oil Press Lt Wire/Lighting Inverter
Details
       

 10-06-2012
0.50
Ran Wire Thru Firewall for Low Oil Pressure Light
Details
     

 10-06-2012
0.50
Assisted with Installing Oil Lines
Details
     

 10-05-2012
1.50
Tightened Fitting on Manifold Transducer
Details
       

 10-05-2012
1.00
Made the Other Two Fittings/Added Tee Fitting
Details
       

 10-05-2012
1.00
Finally! Got Fittings Installed on Oil Lines
Details
       

 09-28-2012
0.50
Began to Run Wire for Hobbs Oil Pressure Switch
Details
     

 09-28-2012
1.50
Attempted to Install Fitting on Oil Hose
Details
       

 09-27-2012
2.00
Removed Oil Pressure Hose/Making New Hoses
Details
       

 09-27-2012
0.50
Pulled Elec Ignition SloBlo Fuse Wire Off
Details
     

 09-22-2012
0.30
Rerouting of the Oil Line for Hobbs Meter Switch
Details
     

 09-21-2012
0.20
Temporarily Installed Hobbs Meter Pressure Switch
Details
     

 02-19-2012
0.30
Applied Heat to Carb Heat Inlet for B-Nut Clearanc
Details
     

 02-19-2012
3.00
Added Arm to Carb Heat Control
Details
       

 02-18-2012
2.50
Ram Air Door Control/Carb Heat Cable
Details
       

 02-18-2012
0.50
Assisted w/Tightening Carb Heat Bulkhead Fitting
Details

 02-13-2012
3.50
Added Carb Heat Cable Clamp/New Door Control
Details
       

 02-12-2012
2.00
Heated Plenum/Added Air Filter Bracket
Details
       

 02-10-2012
2.50
Applied Heat to Plenum to Improve Clearance
Details
       

 02-09-2012
2.00
Reinstalled Cowl/Sanded Plenum
Details
       

 02-09-2012
0.50
Firewall Forward Evaluation
Details

 02-08-2012
2.50
Shortened Attach Tubes/Made Brackets
Details
       

 02-08-2012
2.50
Exhaust Tube Hangars Installed on Air Filter
Details
       

 02-08-2012
2.50
Completed Carb Heat Inlet Bracket/Air Filter
Details
       

 02-07-2012
0.50
Received Vetterman Attach Brackets for Air Filter
Details
     

 02-07-2012
0.50
Picked up Polished Cowl Inlet Rings at Buffex
Details
       

 02-07-2012
2.00
Carb Heat Control Cable/Ram Air Door Control
Details
       

 02-07-2012
2.50
Carb Heat Cable Bracket on Throttle Bracket
Details
       

 02-01-2012
1.00
Laid Oil Door Cutout on Cowl/Rotated Clamps
Details
       

 01-31-2012
0.10
Laid Carb Heat Cable in Line to Ram Air Door
Details
       

 01-31-2012
2.00
Installed Air Filter Housing
Details
       

 01-30-2012
3.00
Installed Carb Air Inlet and Safetied
Details
       

 01-25-2012
1.00
Removed and Marked the Carb Inlet for Trimming
Details
     

 01-23-2012
1.00
Reinstalled Nutplates/Completed Carb Heat Inlet
Details
       

 01-23-2012
1.00
Lower Cowl in Place/Air Filter Housing in Cowl
Details
       

 01-23-2012
1.00
Cut Slit in Right Front Baffle/Bent Down Ramps
Details
     

 01-23-2012
1.00
Carb Heat Inlet/Sanded Cowl Ring/Filter in Cowl
Details
       

 01-23-2012
1.00
Applied Flox to Carb Heat Inlet Holes
Details
       

 01-22-2012
0.50
Photo-Carb Heat Inlet/Air Inlet on Cowling
Details
       

 01-22-2012
2.00
Drilled out Nutplates on Carb Heat Inlet
Details
       

 01-17-2012
0.50
Found Problem with Orientation of Carb Heat Inlet
Details
     

 01-16-2012
4.00
Bolted Air Inlet Box to Carburetor
Details
       

 01-11-2012
1.00
Sanded Flox/Applied RTV under Carb Heat Deck
Details
       

 01-11-2012
0.10
Photo-Carb Heat Ram Air Door Open
     

 01-11-2012
1.00
Painted Air Filter Fiberglass Components
Details
       

 01-11-2012
1.00
Drilled Air Filter to Housing/Added Nutplates
Details
       

 01-11-2012
1.00
Assembled Air Filter Housing
       

 01-10-2012
1.00
Sanded Carb Heat Box
Details
       

 01-10-2012
1.00
Positioned Air Filter in Air Inlet
Details
       

 01-10-2012
1.00
More Sanding and Added Flox
Details
       

 01-10-2012
1.00
Flox in Gaps/Cut Out Alum Ring for Air Filter
Details
       

 01-10-2012
0.10
Air Filter Inserted in the Air Inlet
     

 01-09-2012
2.50
Riveted Control Arm to Ram Air Door
Details
       

 01-09-2012
2.50
Glassed Carb Heat Deck to Air Inlet
Details
       

 01-09-2012
2.50
Glassed around Gaps between Box and Inlet
Details
       

 01-09-2012
0.50
Applied Double-Sided Duct Tape to Hold Glass Down
Details
       

 01-08-2012
1.00
Extended Area on Deck for Handle
Details
       

 01-07-2012
1.50
Sanded Flox/Made New Hinge
Details
       

 01-07-2012
1.00
Made Holes in Air Filter for Nutplates
Details
       

 01-07-2012
1.00
Drilled Inlet Hole in Carb Heat Deck
Details
       

 01-07-2012
1.00
Deck Drilled to Carb Heat Box
Details
       

 01-07-2012
1.00
Carb Heat Box Deck Center Drilled Out
Details
       

 01-06-2012
1.00
Added Flox to Reinforce Carb Heat Box
Details
       

 01-05-2012
1.50
Made Carb Heat Inlet Deck
Details
       

 01-05-2012
1.50
Cut Out Ram Air Door
Details
       

 12-30-2011
0.50
Work on Ram Air Door Hinge
Details
       

 12-30-2011
0.50
Applied Sealant on Lightspeed Wires/Dehyd Plugs
Details
       

 12-22-2011
1.50
Plenum Baffling/Transferred Carb Holes to Air Filt
Details
       

 10-19-2011
0.40
Reinstalled Scat Tubing after Bending Wire End
Details
     

 10-19-2011
0.10
Photo-Hi-Temp RTV on Oil Cooler Shutter Cable
     

 10-19-2011
0.50
Hi-Temp RTV Applied to Areas in Engine Compartment
Details
       

 10-18-2011
2.50
Installed Scat Tubing for Heat Muffs
Details
       

 10-17-2011
1.50
Right Injector Installed/PK Screw in Heat Muff
Details
       

 10-17-2011
1.00
Clamped Smoke Hoses to Engine Mount
Details
       

 10-16-2011
3.00
Drilled Injector Hole in Right Exhaust/PK Screw
Details
       

 10-15-2011
2.00
Smoke Injector Installed in Left Exhaust
Details
       

 10-15-2011
2.50
Located/Drilled Firewall for Smoke System Fitting
Details
       

 10-13-2011
0.50
Torque Seal Applied
Details
     

 10-13-2011
2.00
Clamped Ignition Wires/Firewall Pass-thru
Details
       

 10-12-2011
1.00
Wrapped Up Wires in Firewall Pass-Through
Details
       

 10-12-2011
1.00
Tie-wraps Replaced with Lacing String
Details
       

 10-12-2011
1.00
More Wire Lacing of Wires on the Right Side
Details
       

 10-11-2011
1.50
Tach Sensor to Mag/Retimed Mag/Eng Review
Details
       

 10-11-2011
1.00
Lightspeed Ignition Wires/Laced Wires
Details
       

 10-11-2011
3.00
Crimped Terminals onto Coax-Lightspeed Ignition
Details
       

 10-11-2011
1.00
Assisted Tom Cullen with Adding Tach Sensor
     

 10-10-2011
0.50
Replaced Dehydrator Plugs
Details
       

 10-10-2011
1.50
Ran Lightspeed Power Wires thru Baffle
Details
       

 10-10-2011
1.50
Clamped Tanis Wire to Brake Line
Details
       

 10-09-2011
1.50
More Tie-wrapping of Wiring
Details
       

 10-09-2011
1.50
More Tie-Wrapping of Wires
Details
       

 10-08-2011
0.10
Tanis Plug Mount/EGT/CHT Wires
Details
       

 10-08-2011
2.50
More Wire Wrapping/Safetying/Tanis Plug
Details
       

 10-05-2011
1.00
Used Adel Clamp Keeper Tool to Install Clamp
Details
       

 10-05-2011
2.00
Tie-Wrapping/Safety Alternator/GPS Antenna Bracket
Details
       

 10-05-2011
0.10
Photos-Adel Clamp Keeper Tool
       

 10-04-2011
2.00
Tied Up More Wires/Ground Wire for Tanis
Details
       

 10-04-2011
0.50
More Drilling of Firewall for GPS Antenna Bracket
Details
     

 10-04-2011
1.00
HeatShrink Terminals/Wiring
Details
       

 10-03-2011
1.50
Safetied Tach Cap/Tiewrapped Wires/Visitors
Details
       

 10-03-2011
1.00
Riveted Right Rear Baffles Together
Details
       

 10-01-2011
1.00
Tie-Wrapped Wires/Crimped EGT/CHT Terminals
Details
       

 10-01-2011
1.50
Attempted to Screw Tach Sensor Plug into Magneto
Details
     

 09-30-2011
0.50
Replaced Adel Clamps with Slick Two Wire Clamps
Details
       

 09-30-2011
0.50
Removed Magneto Vent Plug to Install Transducer
Details
       

 09-30-2011
0.10
Photo-Slick Two Wire Clamp Installed
     

 09-30-2011
1.00
Installed Terminal Nipples on Master/Starter Relay
Details
       

 09-30-2011
0.40
Drilled Pilot Holes in Firewall for GPS Bracket
Details

 09-27-2011
0.10
Photos-Engine in Current State
       

 09-27-2011
1.50
Finished Making Firewall Pass-Thru-Ignition Wire
Details
       

 09-24-2011
3.00
Replaced P1 Wire/Attached It to ALT CB
Details
       

 09-24-2011
0.10
Photo-Power Wires to ALT CB and CB Panel
     

 09-23-2011
4.00
Removed P-Lead Ground/Wiring Questions Answered
Details
       

 09-23-2011
0.10
Photos-Fuel Flow Transducer Wires/Ammeter Shunt
       

 09-23-2011
0.10
Photos 2-Wire from Shunt to Relay Removed
     

 09-22-2011
1.00
Ignition Wires Tie-Wrapped/EGT & CHT Wires Wrapped
Details
       

 09-22-2011
2.00
Clamp Ignition Wires/Spiral-wrapping
Details
       

 09-21-2011
2.50
Pulled P1 Wire off Master Relay/P-Lead/Connectors
Details
       

 09-21-2011
3.00
Drilled Firewall for Passthru for Ignition Wires
Details
       

 09-15-2011
0.50
Photos-Alternator Wire and Circuit Breaker
       

 09-15-2011
5.00
Clamped Wires/Finished Alternator Wire to CB
Details
       

 09-14-2011
2.50
Connected Wires to Relays/Clamped Tube-Firewall
Details
       

 09-13-2011
1.00
Starter Wire, Master Relay Wire/Photo-Wire Bundle
Details
       

 09-13-2011
3.00
Made Another Wire Bundle from EMS to Right Side
Details
       

 09-13-2011
2.00
Finished Crimping #8 Wire Betw/Shunt and Relay
Details
       

 09-13-2011
1.00
Drilled Firewall for Alternator Wire
Details
       

 09-08-2011
0.50
Crimped Terminal onto 8 AWG Wire
Details

 09-07-2011
1.50
Trimmed Flange and Installed Oil Cooler
Details
       

 09-07-2011
1.00
Made Fusible Links for Dynon Ammeter Shunt
Details
       

 09-07-2011
0.50
Crimped Terminal on Alternator Wire
Details
       

 09-07-2011
1.00
Clamped Manifold Pressure Hose to Baffle
Details
       

 09-06-2011
2.00
Installed 2nd Oil Pressure Restrictor Fitting
Details
       

 09-06-2011
1.00
Attached Oil Cooler Shutter Door Cable
Details
       

 09-06-2011
2.00
Added Screen to Baffle/Snapped Alt Terminal Bolt
Details
       

 09-01-2011
0.10
Dehydrator Plug/Ammeter Shunt Fuse Links
Details
       

 09-01-2011
0.20
Crimped Terminal onto #8 Wire
Details
       

 08-31-2011
2.50
Riveted Oil Cooler Shutter/Baffles/GPS Shelf
Details
       

 08-30-2011
2.50
Spacer Between Baffles/Enlarged Sparkplug Hole
Details
       

 08-30-2011
0.10
Cleaned Edges of GPS Antenna Bracket
Details
     

 08-26-2011
1.00
Reattached MP Hose/Sparkplug Access Hole
Details
       

 08-25-2011
1.00
Riveted Nutplate on Baffle/Routing of Smoke Hoses
Details
       

 08-25-2011
2.50
Installed Fuel Line/Rotated EGT Clamp
Details
       

 08-25-2011
3.00
Clamp Alternator Wire/Run Thru Subpanel
Details
       

 08-25-2011
0.50
Bolted Ammeter Shunt to Firewall
Details
       

 08-24-2011
4.00
Trimmed Oil Cooler Flange/Baffle Mod/Wiring
Details
       

 08-24-2011
0.10
Photo-Oil Temperature Sensor Wire
     

 08-24-2011
1.00
Assisted with Wiring Ammeter Shunt
Details
       

 08-23-2011
2.00
Cleaned Fuel Line Fittings/Took off Baffling
Details
       

 08-16-2011
1.50
Installed NewTeflon Fuel Lines
Details
       

 08-11-2011
0.10
Photos-Fuel Line Hoses
       

 08-11-2011
0.50
Oil Cooler Door Shutter Cable/Oil Fitting
Details
       

 08-11-2011
1.00
Measured and Ordered New Fuel Lines
Details
       

 08-11-2011
2.00
Labeled Wires/Added Sealant around Tanis Oil Sump
Details
       

 08-10-2011
1.00
Tanis Oil Sump Heater/Oil Door Shutter Cable
Details
       

 08-10-2011
0.50
Screwed Stop Nut on Oil Fitting
Details
       

 08-05-2011
1.00
Safetied Oil Temp Sensor/Bolted Engine Ground
Details
       

 08-05-2011
0.10
Photo-Oil Cooler Shutter Door Cable Routing
     

 08-05-2011
1.50
Clamped Oil Cooler Shutter Door Cable
Details
       

 08-04-2011
3.50
Oil Fittings Screwed into Engine/Hoses in Place
Details
       

 08-04-2011
0.70
Attached Oil Hose to Fitting by Engine Mount
Details
     

 07-10-2011
3.00
Routed Sparkplug Wires into Plugs
Details
       

 07-10-2011
0.10
Photos-Sparkplug Wires Clamped
       

 06-27-2011
1.00
Fuel Flow Transducer/Ammeter Shunt
Details
       

 06-22-2011
1.00
Temporarily Installed Ammeter Shunt/Engine Wires
Details
       

 06-22-2011
2.00
Riveted Fuel Flow Transducer Bracket
Details
       

 06-21-2011
1.50
Pass-Through/Ammeter Shunt
Details
       

 06-21-2011
0.50
Engine Wires Clamped to Cylinder
Details
     

 06-20-2011
3.50
Worked with Steve on Running Engine Wires
Details

 06-20-2011
3.50
Worked on Engine Wiring
Details
       

 06-20-2011
1.00
Oil Cooler Shutter Cable Installation
Details
       

 06-20-2011
1.50
Installing the Firewall Pass-Through
Details
       

 06-19-2011
1.00
Put Firesleeve on Pass-through/NACA Vent Screen
Details
       

 06-19-2011
1.00
Installed Oil Cooler Shutter Cable
Details
       

 06-13-2011
1.00
Split Firewall Pass-Through for Ignition Wires
Details
       

 06-13-2011
3.00
Made Plenum Fit/Chamfered Top Skin
Details
       

 06-12-2011
1.00
Riveted Oil Cooler Shutter/Baffle Bolt Reinforceme
Details
       

 06-12-2011
1.00
Notched Aft Left Baffle and Plenum
Details
       

 06-11-2011
2.00
Cleaned Up Bolt Holes for Oil Cooler
Details
       

 06-06-2011
0.30
Safetied Alternator Bolts
Details
     

 06-06-2011
0.20
Removed Cover on LSE Serial Plug from Sensor
Details
       

 06-06-2011
0.50
Reinstalled Crush Washer on Oil Temp Sensor
Details
     

 06-06-2011
1.50
Installed Firewall Pass-Through on Left Side
Details
       

 06-03-2011
0.50
Installed Crush Washer on Oil Temp Sensor
Details

 05-30-2011
0.50
Ran LSE Output Wires/Oil Temp Sensor
Details
       

 05-28-2011
5.50
Reworked Oil Cooler Mount/MP Sensor Tubing
Details
       

 05-27-2011
5.50
Riveted More Oil Cooler Mount Components
Details
       

 05-27-2011
4.00
Riveted Baffle Doublers/Curved Cylinder Baffles
Details
       

 05-27-2011
0.50
Installed Steel Fittings in Oil Cooler
Details
       

 05-26-2011
4.50
Made Doublers for Cylinder Baffle Ties
Details
       

 05-26-2011
4.50
Drilled Doublers to Side and Aft Baffles
Details
       

 05-25-2011
0.10
Photo-Baffle Angle and Safetying Plug Cylinder #1
Details
       

 05-25-2011
6.00
Laid out New Position for Oil Cooler
Details
       

 05-24-2011
0.10
Photos-Manifold Pressure Sensor Wires
       

 05-24-2011
5.50
Installed Manifold Pressure Hose and Wires
Details
       

 05-24-2011
0.10
Connected Manifold Pressure Tube to Sensor/Fitting
Details
       

 05-24-2011
0.10
Added Plastic Tubing Around Oil Dipstick
Details
     

 05-23-2011
1.50
Safetied #1 Cylinder/Starter Wire Bolted
Details
       

 05-23-2011
2.00
Made Doubler for Aft Left Baffle
Details
       

 05-23-2011
1.50
Installed Manifold Pressure Sensor
Details
       

 05-22-2011
2.00
Safetied Fitting in Primer on #2 Cylinder
Details
     

 05-21-2011
1.00
Dave Ross' Visit
Details
     

 05-17-2011
1.00
Safetied Oil Quick Drain
Details
     

 05-16-2011
0.10
Photos-EGT/CHT Wires Plugged and Working!
Details
       

 05-16-2011
3.00
Installed Repl Fuel Pump Overflow/FW Pass-Thru
Details
       

 05-15-2011
0.10
Photos-Firewall Pass-Through
       

 05-15-2011
2.00
Drilled Hole in Firewall for Pass-Through
Details
       

 05-15-2011
1.00
Cut Air Hole in Right Rear Baffle/Lock Washers
Details
       

 05-05-2011
2.00
Set Air Inlet Hole in Baffle/Ran Starter Wire
Details
       

 05-03-2011
1.00
Installed CHT Thermocouples
Details
       

 05-02-2011
2.50
Installed Throttle Cable/CHT Thermocouples
Details
       

 04-28-2011
1.00
Installed New Engine Dehydrator Plugs
Details
       

 04-28-2011
2.00
Connected Mixture Cable to Carburetor
Details
       

 04-27-2011
0.10
Photos-Oil Cooler and Mini-Plenum on the Baffle
       

 04-27-2011
0.10
Photo 2-Interior View of Mini-Plenum
     

 04-27-2011
3.50
Partial Construction of Oil Cooler Mini-Plenum
Details
       

 04-26-2011
0.10
Photos-Mini-Plenum and Baffle
       

 04-26-2011
3.00
Drilled Oil Cooler Mini-Plenum to New Baffle
Details
       

 04-25-2011
3.00
Constructed Oil Cooler Mini-plenum
Details
       

 04-24-2011
1.50
Tightened Throttle Firewall Passthrough/Cables
Details
       

 04-24-2011
1.00
Installed EGT Thermocouple Probes
Details
       

 04-24-2011
2.00
Cut Angle Brackets for Oil Cooler Mini-Plenum
Details
       

 04-24-2011
1.00
Assisted Drew in Cutting Brackets for Oil Cooler
Details

 04-23-2011
5.00
Riveted Cowl Inlet Ramps/Installed Throttle Cable
Details
       

 04-23-2011
3.50
Assisted Gary with Throttle and Carb Heat Cables
Details
       

 04-22-2011
0.10
Photos-Positioning Doubler to Right Inlet Ramp
       

 04-22-2011
3.00
Made Doubler for Under Right Inlet Cowl Ramp
Details
       

 04-22-2011
1.00
Brackets for Attaching Inlet Ramps to Side
Details
       

 04-21-2011
2.00
Drilled Angle Support for Right Cowl Inlet Ramp
Details
     

 04-20-2011
2.00
Made Support Bracket for Baffle on Cylinder #4
Details
       

 04-20-2011
2.00
Made Angle Support Brackets on Cylinder #3
Details
       

 04-16-2011
0.10
Photos-Shortened Screws/L-Brace on Left Ramp
       

 04-16-2011
2.50
Made Reinforcement Bracket for Left Cowl Inlet
Details
       

 04-15-2011
3.00
Trimmed Left Front Cowl Inlet Ramp
Details
       

 04-14-2011
1.00
Made Bolt Spacers for Oil Cooler
Details
     

 04-13-2011
0.10
Photos-Oil Shutter/Incorrect Positioning of Cooler
       

 04-13-2011
0.10
Photos 2-Aft Left Center Baffle Trimmed
Details
       

 04-13-2011
5.00
Modified Baffle for Oil Cooler-Incorrectly!
Details
       

 04-13-2011
1.50
Drilled Ice Drain Hole in Oil Breather Tube
Details
       

 04-12-2011
0.10
Photos-Oil Breather Tube
       

 04-12-2011
4.00
Add Stiffener Angle to Baffling/Oil Breather Tube
Details
       

 04-11-2011
0.10
Photos-Aft Corners of Baffling
       

 04-11-2011
4.00
Enlarged Holes in Baffling and Plenum
Details
       

 04-10-2011
0.10
Photos-Baffling Drilled to the Plenum
       

 04-10-2011
4.00
Installed Aft Center Baffle Support/More Baffling
Details
       

 04-09-2011
3.00
Trimmed Front Baffling and Left Side Baffles
Details
       

 04-05-2011
0.10
Photos-Plenum on the Engine
       

 04-05-2011
1.50
Baffling Trimmed
Details
       

 04-04-2011
0.10
Photos-Lines Marked on Baffles/Trimmed
       

 04-04-2011
1.00
Made Spacer for Left Aft Baffle
Details
       

 04-04-2011
1.00
Began Trimming the Baffling for the Plenum
Details
       

 04-03-2011
0.10
Photos-Filled Drilled Holes with SuperFil
       

 04-03-2011
0.10
Photos-Cowl Extensions/Fairing Filled with SuperFi
       

 04-03-2011
0.50
Mixed SuperFil for Filling Holes in Cowling
Details
       

 03-24-2011
2.50
Trimmed Aft Left Center Baffle
Details
       

 03-24-2011
0.50
Installed Oil Quick-Change Drain/Baffle Trimming
Details
       

 03-09-2011
0.50
Sanded Plenum
Details
       

 03-03-2011
2.00
Baffle Back Left Side #5/Cowl Inlets Sanded
Details
       

 03-02-2011
0.10
Plenum/Bolt Reinforcements Riveted
       

 03-02-2011
4.00
Laid Plenum Inside of the Baffling
Details
       

 03-02-2011
0.10
Baffling Bolt Reinforcements Riveted in Place
       

 03-01-2011
3.00
Started to Install Baffling
Details
       

 02-24-2011
2.00
Installed Mixture Cable Hardware
Details

 02-22-2011
0.10
Eyeball Assembly in Firewall for Mixture
       

 02-22-2011
3.00
Drilled Mixture Hole in Firewall for Eyeball Ass'y
Details
       

 02-10-2011
0.50
Cabin Heat Control/Mixture Cable Hole in Firewall
Details
       

 02-09-2011
1.50
Moved Fuel Line/Removed Control Cable Bracket
Details
       

 02-08-2011
1.50
Cleaned up the Rest of the Baffling Pieces
Details
     

 02-03-2011
0.10
Began to Clean up Edges of Baffling
Details
     

 01-21-2011
0.50
Dropped Off Spinner for Polishing
Details

 01-16-2011
0.10
Readied Spinner for Metal Polishing
Details
       

 12-02-2010
0.10
Photos-Serial Numbers of Prop and Spinner Plate
Details
       

 11-26-2010
1.00
Laid out Reinforcements for Air Filter
Details
     

 11-24-2010
3.00
Shipped Cowling/Heat Shield/Started on Cowling
Details
       

 11-24-2010
0.10
Photos-Drain Plug, Carb Airbox, Cowling
       

 11-22-2010
4.00
Finished Drilling Firewall Flange/Trimmed Top Skin
Details
       

 11-15-2010
0.10
Photos-PlanePower Alt Installed/Carb Heat Muff
       

 11-15-2010
0.10
Photos 2-PlanePower Alternator/Primer Plugs
       

 11-09-2010
2.00
Changed Dehydrator Plugs/Removed Alternator
Details
       

 11-08-2010
0.50
Installed Cap over Oil Fitting
Details
     

 10-14-2010
0.10
Photos-Fuel Line and Exhaust System
       

 10-14-2010
3.50
Made New Fuel Line betw/Electric Pump and Fitting
Details
       

 10-13-2010
2.00
Sand Bags, Exhaust Port, and Modified Wrench
Details
       

 10-13-2010
4.00
Hanging the Engine
Details
       

 10-12-2010
1.50
Patched Original Gascolator Hole in Firewall
Details
     

 10-12-2010
4.00
Drilled Hole in Firewall for Fuel Line Fitting
Details
     

 10-03-2010
3.50
Modify the Gascolator and Fuel Line Routing
Details
       

 10-03-2010
0.10
Installed Oil Pressure Fitting on Engine
Details
       

 09-26-2010
0.50
Poor Clearance for Gascolator/Reversed Brake Nippl
Details
       

 09-24-2010
6.00
Torqued Engine Mount Bolts/Installed Gear Legs
Details
       

 09-24-2010
1.00
Looked for Replacement Engine Mount Bolts/Washers
Details

 09-24-2010
0.50
Drilled Replacement Engine Mount Bolts
Details

 09-23-2010
2.50
Trimmed Firewall Corners/Install Engine Mount
Details
       

 09-23-2010
0.10
Photo-Battery Box/Skin Trimmed for Gear Legs
       

 09-22-2010
5.00
Firewall Recess, Skin Trimming for Gear Leg
Details
       

 02-03-2010
3.00
Replaced Smoke System Filter/Cowl Attach Strips
Details
       

 02-03-2010
0.10
Photo-Instrument Top Skin Clecoed
     

 02-02-2010
0.50
Made New Bottom Cowl Attach Strip
Details
     

 01-27-2010
6.00
Drilled Cowl Attach Strips to the Fuselage/Firewal
Details
       

 01-20-2010
0.10
Photos-More Firewall Work
       

 01-20-2010
2.50
Firewall Work-Nutplates
Details
       

 01-19-2010
2.50
Drilled Hole in Firewall for Relay Wires
Details
     

 01-18-2010
4.50
Riveted Nutplates to Firewall/Met with Steve V.
Details
       

 01-13-2010
5.00
Ordered BNC Connectors/Cut .063" Pieces for Camloc
Details
       

 12-17-2009
3.00
Riveted Gascolator Bracket/Springs on GPS Wiring
Details
       

 12-16-2009
0.10
Photo-Throttle/Carb Heat Cables' Holes Drilled
     

 11-10-2009
0.10
Photos 2-Wiring, Ground Block Positioned
       

 10-30-2009
0.10
Photos-Gascolator Bracket
       

 10-30-2009
0.10
Photos 2-Gascolator Bracket
       

 10-30-2009
4.50
Made a new Gascolator Bracket
Details
       

 10-28-2009
2.50
Worked with Andair Gascolator Bracket
Details
     

 10-27-2009
0.10
Photo-Gascolator Braket Drilled in Place
     

 10-27-2009
2.50
Fuel/Oil Transducers/Drilled Gascolator Brkt
Details
       

 10-22-2009
3.00
Installed Heat Valve/Chamfered Aft Skin Edges
Details
       

 10-21-2009
0.10
Photos 2-Preliminary Instrument Subpanel Layout
       

 10-21-2009
4.50
Painted Skins/Readied Firewall for Heat Valve
Details
       

 10-14-2009
0.10
Photos-Heat Box on Firewall
       

 10-14-2009
3.00
Drilled Heat Vent Box on Firewall
Details
       

 09-04-2009
4.50
Heat Box Pilot Hole/Aft Top Skin Trimming
Details
       

 09-03-2009
0.10
Photos-Firewall Doubler, Battery Box
       

 09-03-2009
0.10
Photos 4-Manifold Transducer
       

 09-03-2009
0.10
Photos 3-Battery Box/Brake Doubler
       

 09-03-2009
0.10
Photos 2-Battery Box and Brackets
       

 09-03-2009
6.00
Painted Battery Box/Firewall Work
Details
       

 08-29-2009
3.00
Master/Starter Relays
Details
       

 08-28-2009
6.00
Worked on Firewall/Relays/Battery Box
Details
       

 08-28-2009
4.00
Battery Box Lightening Holes/Positioning
Details
       

 08-27-2009
0.10
Photos-Firewall Recess/Rudder Pedal Bracket
       

 08-27-2009
0.10
Photos 2-Rudder Pedal Bracket Modified
       

 08-09-2009
2.50
Drilled Doubler to Firewall/Riveted
Details

 06-15-2009
3.00
Installed Brake Reservoir/Bonaca Brake Lines
Details
       

 03-13-2008
0.10
Modifying Elevator Bellcrank for TruTrak Pitch Ser
Details

 11-17-2004
1.00
Order Finish Kit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.