Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
Empennage
Work Logs Found:
326
Category Work Time:
666 Hours
Date
Hours
Work Log Summary
Details
05-21-2014
1.00
Installed Trim Cable Access Panel
Details
05-06-2014
1.50
Installed Bolt in Elevator/HS Bearing
Details
05-04-2014
1.60
Riveted Trim Cable Nut onto Access Panel
Details
05-03-2014
1.70
Determined New Position of Trim Cable Nut
Details
05-03-2014
1.00
Assisted with Locating Trim Cable Nut
Details
04-24-2014
0.50
Drilled out Rivets on Elevator Access Panel
Details
04-22-2014
1.50
Completed Attaching Elevators to Control System
Details
04-18-2014
1.00
Installed Bolts into Elevator Hinge Brackets
Details
04-11-2014
2.00
Installed Elevators and Worked on Trim Cable
Details
04-11-2014
2.00
Assisted with Installing Elevators and Trim Cable
Details
04-10-2014
4.00
Sanded, Filled, Primed and Painted Elevator Tips
Details
04-06-2014
0.50
Trimmed Aft End of Longerons
Details
03-20-2014
0.10
Removed Right Elevator
Details
03-19-2014
1.00
Trim Cable Run
Details
03-19-2014
1.50
Attached Elevators to Push-Pull Tube/Movement
Details
02-19-2014
0.20
Temporarily Installed Left Elevator
Details
01-15-2014
1.00
Helped Mix Epoxy-flox Slurry
Details
01-15-2014
5.00
Added Epoxy-Flox Slurry/BB's to Left Elevator
Details
10-25-2013
0.50
Sanded Resin on Right Elevator
Details
10-20-2013
1.00
Added Epoxy Resin, Flox and BB's to Rt Elevator
Details
06-21-2013
2.50
Installed Remaining Bolts in Rudder
Details
06-21-2013
0.30
Helped Install Bolt in Rudder
Details
06-20-2013
0.10
Photo-Torque Seal on Nuts
06-20-2013
1.00
Installed Bolts on Rudder/Torque Seal on Nuts
Details
06-19-2013
1.50
Termporarily Attached Rudder
Details
06-19-2013
2.00
Bolted HS and VS to Fuselage
Details
06-18-2013
0.50
HS and VS on Fuselage/Visitors
Details
05-07-2013
1.00
Empennage Fairing after Sanding/Priming
Details
04-11-2013
1.00
Riveted More Nutplates to HS
Details
04-09-2013
1.00
Riveted Nutplates to Top of HS
Details
04-04-2013
1.00
Riveted Nutplate in HS
Details
02-01-2012
1.00
VS on Fuse/Wrapped up Elevators, Rudder
Details
01-25-2012
1.00
Bent Trim Tab Hinge for Screwing into Elevator
Details
01-18-2012
3.00
Filled Rudder Dents/Applied Primer to Fairings
Details
01-17-2012
4.50
Took HS and VS off Fuselage/Cleaned off Plastic
Details
01-16-2012
1.00
Sanded Empennage Fairing Edges
Details
01-15-2012
1.00
Drilled Empennage Fairing to VS/HS
01-15-2012
1.00
Drilled Empennage Fairing to HS and VS
Details
12-30-2011
0.50
Sanded Fairing Edges on Belt Sander
Details
12-30-2011
0.50
Photos-Fairing
12-29-2011
0.50
Sanded and Spread Primer on Fairing
Details
12-29-2011
0.50
Added Microballoons to Low Spot on Fairing
Details
12-23-2011
2.50
Sanded Empennage Fairing
Details
12-23-2011
0.10
Photo-Fairing
12-22-2011
0.10
Photos-Purchased Tail Kit
12-22-2011
0.50
Made a Practice Twist in Elevator Hinge Pin
Details
12-22-2011
0.10
Bought Partially-Assembled Tail Kit
Details
12-20-2011
1.00
Primed Fairing and Applied Micro
Details
12-19-2011
1.00
Sanding of Flox and Contouring
Details
12-19-2011
1.00
Sanding of Fairing
12-19-2011
1.00
Fairing Sanding
12-17-2011
1.50
Applied Reinforcement Glass on Crack
Details
12-17-2011
0.50
Applied Micro, Flox and Glass
Details
12-16-2011
1.50
Sanded Weak Area and Edges on Fairing
Details
12-15-2011
1.50
Added One Bid of Glass to Right Lower Fairing
Details
12-14-2011
1.50
Used Sander on Empennage Fairing Edges
Details
12-14-2011
0.10
Photos-Empennage Fairing
12-10-2011
2.50
Sanding of the Flox and Microballoons
Details
12-10-2011
0.10
Photos-Empennage Fairing
12-09-2011
1.50
Spread Flox over Inside of Corners of Fairing
Details
12-09-2011
1.00
Photo-Micro Added to Left Side of Fairing
12-09-2011
0.50
Completed Rudder
Details
12-08-2011
3.00
Sanded Flox and Micro
Details
12-01-2011
0.50
Sanded Microballoons on Fairing
Details
12-01-2011
0.50
Photos-Added Microballoons
12-01-2011
1.00
More Sanding/Added Micro
Details
11-26-2011
2.00
Sanded Empennage/Added Microballoons
Details
11-25-2011
4.00
Sanded Fiberglass/Added Flox to Empennage
Details
11-23-2011
0.50
Still More Trimming of the Fairing
Details
11-23-2011
0.50
Popped Modified Empennage Fairing off Fuselage
Details
11-23-2011
1.00
More Trimming of the Fairing
Details
11-23-2011
0.50
Made 2x8 Clamp for Control Surfaces
Details
11-23-2011
1.00
Began Trimming the Modified Fairing
Details
11-22-2011
1.00
Pressure Applied to Fairing Flange
Details
11-22-2011
0.50
Placed Sandbag on Right Side Flange
Details
11-22-2011
1.00
Placed Packing Tape over Duct Tape on Empennage
Details
11-22-2011
1.00
Glass Cloth Epoxied and Laid in Position
Details
11-22-2011
1.00
Fiberglass Cloth in Place on the Fairing
Details
11-22-2011
1.00
Cut Fiberglass Pieces for Each Side
Details
11-21-2011
1.00
Trimmed More of the Right Flange on Fairing
Details
11-21-2011
1.00
Applied Duct Tape on Fuselage and HS
Details
11-20-2011
1.50
Trimmed Empennage Fairing/Sanded Insulation
Details
11-19-2011
0.50
Trimmed Insulation to Fit Contour of Fairing
Details
11-19-2011
0.50
Trimmed Front Corners of Empennage Fairing
Details
11-19-2011
0.50
Left Flange of Empennage Fairing Split
Details
11-18-2011
1.50
Empennage Fairing Drilled/Clecoed in place
Details
11-17-2011
2.50
Riveted HS and Elevator Fairings in Place
Details
11-16-2011
1.00
Rudder Fairing Riveted to Rudder/SuperFil Added
Details
11-16-2011
1.00
Dimpled Rudder/Riveted Rudder
Details
11-16-2011
1.00
Dimpled Aft Holes in Top of Rudder
Details
11-16-2011
1.00
Countersunk Fairing Holes
Details
11-15-2011
2.00
Riveted VS Fairing/Glued Strips
Details
11-15-2011
1.50
Perma-Grit Countersink/Fairing Riveted/Glued
Details
11-14-2011
1.00
Trimmed Fuselage-Empennage Fairing
Details
11-14-2011
1.00
T-88 Epoxy Bottles/Reinforcement Strips
11-14-2011
2.00
Glued Reinforcement Strips to Fairings
Details
11-10-2011
2.00
Sanding of Fairings
Details
11-10-2011
2.00
Made Reinforcement Strips for Fairings
Details
11-10-2011
0.50
Aluminum Strips for the Fairings
Details
11-09-2011
1.00
Mixed More Microballoons and Flox-Weak Mix
Details
11-09-2011
1.00
Lower Rudder Fairing Trimmed
Details
11-09-2011
2.00
Added Two Strips of Glass to Each Fairing
Details
11-08-2011
2.50
Applied Epoxy and Flox to Inside of Fairings
Details
11-07-2011
1.80
Used Superfil to Fill Holes in Fairings
Details
11-07-2011
1.50
Used SuperFil to Fill Holes in Elevator Fairing
Details
11-07-2011
1.50
Made Left Emp Fairing Insert and Microballoons
Details
11-03-2011
1.50
Trimmed Fuselage/Empennage Fairing
Details
11-03-2011
2.00
Made a New Edge on Left Elevator Fairing
Details
11-02-2011
1.00
Trimmed Rudder Fairing
Details
11-02-2011
2.00
Sanded Fiberglass Tips in Fairings
Details
11-02-2011
1.00
Right Fairings/Torqued Elevator Weights/VS
Details
10-26-2011
0.50
More Trimming of Rudder Bottom Fairing
Details
10-26-2011
3.00
HS and Elevator Tip Fairings Sanded/Reglassed
Details
10-26-2011
2.00
Elevator Fairing/Rudder Bottom FairingTrimmed
Details
10-25-2011
1.50
Prepared Empennage Fairings for Glassing Tips
Details
10-25-2011
1.50
Microballoons and Epoxy Applied to Fairings
Details
10-24-2011
3.50
Some Fairings Drilled to the HS, VS and Control Su
Details
10-22-2011
3.00
Faired Edges to Fairings/Cleaned Fairings
Details
10-19-2011
0.50
Sanded Vertical Stab Fairing
Details
10-17-2011
1.50
Reattached Tail Components
Details
10-17-2011
1.00
Assisted with Reattaching Empennage
Details
09-22-2010
1.00
Removed Empennage Pieces/Firewall Recess
Details
09-22-2010
2.00
Empennage Removal/Firewall Recess
Details
04-14-2009
1.70
Trimmed Empennage Fairings
Details
04-14-2009
0.10
Photos-Empennage Fairings Inserted in Place
04-13-2009
1.00
Trimmed Empennage Fairings
Details
04-09-2009
0.50
Positioned Empennage Fairings/Rick's Visit
Details
03-24-2009
0.10
Photos-Glued Washers to Elevator Horns
03-24-2009
0.10
Photo-Both Stabilizers Temporarily Bolted to Fusel
03-24-2009
3.00
Drilled out Rivet in Hor Stab/Countersunk Rivet
Details
03-12-2009
0.50
Installed Bolts in Corners of VS Forward Spar
Details
01-19-2009
1.00
01-17-2009
1.00
Attached Elevators to HS
Details
12-31-2008
0.10
Photo-HS rear spar cutouts for down elevator
12-31-2008
2.00
Cleaned up HS rear spar cutouts/riveted HS
Details
12-30-2008
0.10
Photo-Right elevator horn and HS rear spar/spacer
12-30-2008
1.50
Finished down angles of elevators
Details
12-29-2008
4.00
Worked on down motion of elevators
Details
12-29-2008
2.00
Installed the rudder stop on the VS
Details
12-23-2008
4.50
Finished riveting canopy deck/Elevators' range
Details
12-23-2008
3.00
Assisted with setting elevators' range of motion
Details
12-22-2008
0.50
Assisted with drilling VS rear spar bolt
Details
12-22-2008
6.00
Assembled entire Emp/Riveted Rt Canopy Deck Deck
Details
12-19-2008
2.50
Finished Drilling HS/VS Spars-3rd VS Bolt Hole
Details
12-19-2008
0.50
Assisted Gary
Details
12-19-2008
0.50
Assisted Gary
Details
12-18-2008
2.50
Drilled front spar brace to VS/HS-2nd bolt hole
Details
12-17-2008
0.10
Photos-Aligning/Drilling VS Rear Spar Bolt Holes
12-17-2008
0.10
Photos 2-Drilling VS Rear Spar Bolt Holes
12-17-2008
4.50
Drilled 1st bolt hole in VS Rear Spar/Spacer
Details
12-16-2008
5.00
Trimmed VS forward spar/Marked Rear Spar
Details
12-07-2008
0.10
Photos-Cross-Bracket that Needs to be Replaced
12-07-2008
3.00
Found Problem with Cross-Bracket under Aft Top Dec
Details
12-02-2008
0.10
Photos-Drilling Horiz Stab to Fuselage
12-02-2008
5.00
Drilled Bottom of Horns/HS to Fuselage
Details
12-02-2008
2.00
Assisted Gary with Drilling HS to Fuselage
Details
12-01-2008
0.10
Photos-Elevator Horns Drilled/Spacers
12-01-2008
0.10
Photos 2-Gap between Elevator Horns
Details
12-01-2008
3.00
Drilled Elevator Horns to HS Bearing
Details
11-28-2008
1.50
Worked on Alignment Pins/Received Drill Bushing
Details
11-25-2008
0.10
Photos-Elevators Aligned with Horiz Stab
11-25-2008
4.50
Aligned Elevators with Horizontal Stabilizer
Details
11-24-2008
2.50
Rod-End Bearings into Elevators
Details
09-04-2008
0.10
Photos 2-Trim Tab Installed
09-04-2008
0.10
Photo 3-Trim Tab Installed on Left Elevator
09-04-2008
2.00
Installed Trim Tab on Left Elevator
Details
09-03-2008
2.00
Drilled Hinge to Trim Tab
Details
09-02-2008
0.10
Photos-Hinge Drilled to Trim Tab
09-02-2008
0.10
Photos-Drilled Hinge to Trim Tab
09-02-2008
1.00
Drilled Trim Tab Apart and Drilled Hinge in Place
Details
08-27-2008
5.50
Riveted Trim Tab
Details
10-09-2007
1.00
Drilled Trim Spar to New Trim Tab
Details
10-03-2007
2.00
Reworked Trim Tab
Details
10-02-2007
0.10
Primed Replacement Trim Tab
Details
11-19-1997
2.00
Trim Tab
Details
11-18-1997
2.50
Elevators/Trim Tab
Details
11-17-1997
3.50
Elevators
Details
11-07-1997
4.00
Elevators/Trim Tab
Details
11-05-1997
3.50
Elevators
Details
11-05-1997
1.00
Elevators
Details
11-04-1997
3.50
Elevators
Details
11-03-1997
2.00
Elevators
Details
10-24-1997
2.00
Elevators
Details
10-08-1997
2.00
Elevators
Details
10-06-1997
2.50
Elevators
Details
10-01-1997
2.50
Elevators
Details
09-30-1997
2.50
Elevators
Details
09-22-1997
3.00
Elevators
Details
09-14-1997
1.00
Elevators
Details
09-12-1997
1.50
Elevators
Details
09-09-1997
4.50
Elevators
Details
08-15-1997
1.00
Elevators
Details
08-12-1997
3.00
Elevators
Details
07-23-1997
4.00
Elevators
Details
07-22-1997
3.00
Elevators
Details
07-16-1997
2.00
Elevators
Details
07-15-1997
3.00
Elevators
Details
07-09-1997
2.50
Elevators
Details
06-18-1997
3.50
Elevators
Details
06-04-1997
3.50
Elevators
Details
06-03-1997
2.00
Elevators
Details
05-28-1997
2.00
Elevators/Visitor-Stew Robinson
Details
05-28-1997
1.50
Elevators
Details
05-27-1997
2.00
Elevators
Details
05-22-1997
2.00
Elevators
Details
05-20-1997
5.00
Elevators
Details
05-18-1997
1.00
Elevators/Visitors-Dad, Rick Katai
Details
05-09-1997
3.00
Elevators
Details
05-09-1997
0.50
Elevators
Details
05-07-1997
3.50
Elevators/Visitor-Bill Peterseim
Details
05-06-1997
4.50
Visitors/Elevators
Details
05-06-1997
4.00
Elevators
Details
04-29-1997
4.50
Elevators
Details
04-29-1997
3.50
Elevators
Details
04-25-1997
2.00
Elevators
Details
04-23-1997
2.50
Elevators
Details
04-23-1997
0.50
Elelvators
Details
04-18-1997
2.50
Elevators
Details
04-16-1997
3.50
Elevators
Details
04-16-1997
0.50
Elevators
Details
04-15-1997
4.00
Elevators
Details
04-14-1997
4.00
Elevators
Details
02-26-1997
3.50
Elevators
Details
02-19-1997
3.50
Elevators
Details
02-18-1997
5.00
Rudder Complete/Elevators
Details
02-12-1997
3.50
Right Elevator
Details
02-11-1997
4.00
Rudder/Right Elevator
Details
02-06-1997
3.50
Rudder
Details
02-06-1997
2.50
Rudder
Details
01-17-1997
4.50
Rudder
Details
01-17-1997
1.00
Rudder
Details
01-10-1997
0.50
Rudder
Details
01-10-1997
1.50
Rudder
Details
01-08-1997
5.00
Rudder
Details
01-03-1997
4.00
Rudder
Details
12-31-1996
4.00
Rudder
Details
12-31-1996
2.50
Rudder
Details
12-26-1996
4.00
Rudder/Wing Kit Delivery
Details
12-26-1996
4.00
Rudder
Details
12-21-1996
0.10
Shop Visit
Details
12-20-1996
4.00
Rudder
Details
12-13-1996
3.00
Rudder
Details
12-11-1996
5.00
Rudder
Details
12-06-1996
5.00
Rudder
Details
12-04-1996
4.00
Rudder
Details
11-27-1996
3.50
Rudder
Details
11-20-1996
4.50
Rudder
Details
11-19-1996
3.50
Rudder
Details
11-17-1996
2.00
Rudder
Details
11-13-1996
4.00
Vertical Stabilizer Completed/Rudder
Details
11-06-1996
1.50
Vertical Stablilizer
Details
11-06-1996
3.00
Vertical Stabilizer
Details
11-05-1996
3.50
Vertical Stabilizer
Details
10-30-1996
4.00
Vertical Stabilizer
Details
10-29-1996
5.00
Vertical Stabilizer
Details
10-22-1996
4.00
Vertical Stabilizer
Details
10-18-1996
2.00
Vertical Stabilizer
Details
10-16-1996
3.50
Vertical Stabilizer
Details
10-15-1996
4.00
Vertical Stabilizer
Details
10-09-1996
2.50
Vertical Stabilizer/Horizontal Stab Complete!
Details
10-08-1996
5.50
Vertical Stabilizer
Details
09-29-1996
2.00
Vertical Stabilizer
Details
09-27-1996
3.00
Vertical Stabilizer
Details
09-19-1996
3.00
Horizontal Stabilizer
Details
09-13-1996
0.50
Horizontal Stabilizer
Details
09-12-1996
4.50
Horizontal Stabilizer-Out of Jig!
Details
09-12-1996
1.50
Horizontal Stabilizer
Details
09-05-1996
4.00
Horizontal Stabilizer
Details
09-05-1996
2.00
Horizontal Stabilizer
Details
09-05-1996
1.50
Horizontal Stabilizer
Details
08-23-1996
2.00
Horizontal Stabilizer
Details
08-22-1996
4.50
Horizontal Stabilizer
Details
08-22-1996
4.50
Horizontal Stabilizer
Details
08-22-1996
1.00
Horizontal Stabilizer
Details
08-21-1996
4.00
Horizontal Stabilizer
Details
08-21-1996
0.50
Horizontal Stabilizer
Details
08-14-1996
3.00
Horizontal Stabilizer
Details
08-02-1996
3.00
Horizontal Stabilizer
Details
07-31-1996
4.00
Horizontal Stabilizer
Details
07-24-1996
3.00
Horizontal Stabilizer
Details
07-16-1996
4.00
Horizontal Stabilizer
Details
07-16-1996
1.00
Horizontal Stabilizer
Details
07-12-1996
2.00
Horizontal Stabilizer
Details
07-10-1996
2.50
Horizontal Stabilizer
Details
07-02-1996
3.50
Horizontal Stabilizer
Details
07-02-1996
0.50
Horizontal Stabilizer
Details
06-29-1996
3.50
Horizontal Stabilizer
Details
06-20-1996
3.50
Horizontal Stabilizer
Details
06-20-1996
2.50
Horizontal Stabilizer
Details
06-20-1996
1.00
Horizontal Stabilizer
Details
06-19-1996
1.50
Horizontal Stabilizer
Details
06-19-1996
0.50
Horizontal Stabilizer
Details
06-18-1996
2.50
Horizontal Stabilizer
Details
06-17-1996
2.00
Horizontal Stabilizer
Details
06-15-1996
2.00
Horizontal Stabilizer
Details
06-11-1996
4.50
Horizontal Stabilizer
Details
06-07-1996
3.00
Horizontal Stabilizer
Details
06-05-1996
4.00
Horizontal Stabilizer
Details
06-05-1996
1.00
Horizontal Stabilizer
Details
05-16-1996
4.50
Horizontal Stabilizer
Details
05-16-1996
2.00
Horizontal Stabilizer
Details
05-08-1996
4.00
Horizontal Stabilizer
Details
05-08-1996
1.50
Horizontal Stabilizer
Details
05-06-1996
3.00
Horizontal Stabilizer
Details
05-06-1996
4.00
Horizontal Stabilizer
Details
04-19-1996
2.00
Horizontal Stabilizer
Details
04-18-1996
3.00
Horizontal Stabilizer
Details
04-16-1996
2.50
Horizontal Stabilizer
Details
04-16-1996
1.00
Horizontal Stabilizer
Details
04-12-1996
2.00
Horizontal Stabilizer
Details
04-11-1996
4.50
Horizontal Stabilizer
Details
04-11-1996
2.00
Horizontal Stabilizer
Details
04-01-1996
1.00
Horizontal Stabilizer
Details
04-01-1996
2.00
Horizontal Stabilizer
Details
03-28-1996
1.00
Horizontal Stablilizer
Details
03-27-1996
1.50
Priming
Details
03-27-1996
1.00
Priming
Details
03-25-1996
4.00
Horizontal Stabilizer
Details
03-25-1996
1.00
Horizontal Stabilizer
Details
03-20-1996
1.50
Horizontal Stabilizer
Details
03-20-1996
1.50
Horizontal Stabilizer
Details
03-15-1996
1.50
Horizontal Stabilizer
Details
03-15-1996
1.50
Horizontal Stabilizer
Details
03-06-1996
3.50
Steel Parts/Horizontal Stablilizer
Details
03-06-1996
2.50
Steel parts, Horizontal Stabilizer
Details
02-22-1996
5.00
Inventory of Kit
Details
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.