Powered By Kitlog Pro v2.0
Paul's Zenith 601-XL
Zodiak 601 XL
Stabilizer
Work Logs Found:
11
Category Work Time:
22 Hours
Date
Hours
Work Log Summary
Details
03-07-2007
3.75
Finished up the stabilizer
Details
03-06-2007
1.00
Positioned and drilled hinge on Stab
Details
03-05-2007
1.00
Deburred and Primed Upper Skin
Details
03-03-2007
1.50
Pulled the skin in place on the top of the stab an
Details
03-01-2007
2.00
Debur, prime and rivet bottom of stab skin
Details
02-28-2007
1.50
Skinned lower surface of the stab
Details
02-28-2007
2.00
Aligned ard riveted skeleton
Details
02-27-2007
2.00
Final fitting of rear spar and diassemble/deburr/p
Details
02-26-2007
1.00
Fixing the mis-drilled stab ribs
Details
02-25-2007
5.42
Stab skeleton assembly continues
Details
02-22-2007
0.75
Stab spar assembly begins
Details
SITE NAVIGATION
Contact Builder
R-80 Tiger Moth Home
Zodiak 601 XL Home
Category
# Logs
# Hours
All
171
552
Ailerons
6
13
Elevator
7
19
Engine
2
2
Flaps
3
8
Fuselage
64
235
Miscellaneous
19
69
Preparation
14
27
Rudder
4
8
Stabilizer
11
22
Wings
41
149
Copyright © 2001-2024 Matronics. All Rights Reserved.