KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
Work Logs Found: 11
Category Work Time: 22 Hours
 Date
Hours
Work Log Summary

Details

 03-07-2007
3.75
Finished up the stabilizer
Details
       

 03-06-2007
1.00
Positioned and drilled hinge on Stab
Details
       

 03-05-2007
1.00
Deburred and Primed Upper Skin
Details
     

 03-03-2007
1.50
Pulled the skin in place on the top of the stab an
Details
       

 03-01-2007
2.00
Debur, prime and rivet bottom of stab skin
Details
       

 02-28-2007
1.50
Skinned lower surface of the stab
Details
       

 02-28-2007
2.00
Aligned ard riveted skeleton
Details
       

 02-27-2007
2.00
Final fitting of rear spar and diassemble/deburr/p
Details
       

 02-26-2007
1.00
Fixing the mis-drilled stab ribs
Details
       

 02-25-2007
5.42
Stab skeleton assembly continues
Details
       

 02-22-2007
0.75
Stab spar assembly begins
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.