Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
Zodiac 601 XL
Cowling
Work Logs Found:
24
Category Work Time:
34 Hours
Date
Hours
Work Log Summary
Details
12-14-2007
0.50
Installed onto fuselage to mark blue stripe
Details
12-13-2007
2.00
Cowl in yellow and white
Details
12-12-2007
2.00
Repainted the cowl
12-10-2007
1.50
Had to rub back parts of the cowl
Details
12-04-2007
1.00
Lower cowl rubbed back
11-26-2007
1.50
Sanded back wheel spats and cowl
Details
06-05-2007
0.50
New camlocs
Details
04-01-2007
2.00
Ram duct baffels
Details
03-23-2007
1.00
Filled low points on cowl hatch
Details
03-21-2007
1.00
Cowl hatch release
Details
03-20-2007
2.00
Oil access door
Details
03-18-2007
1.50
Sanded back NACA duct
Details
03-18-2007
0.00
Naca duct installation
03-18-2007
1.50
NACA Duct
03-16-2007
0.00
Pictures of cowl hinge
02-22-2007
1.50
Installed right side camlocks
Details
02-21-2007
2.00
Bottom cowl to fuselage attachment
Details
02-20-2007
1.00
Counter sink and rivet cowl
Details
02-18-2007
3.50
Oil cooler
Details
02-18-2007
0.50
Cowl fitted using hinges
Details
02-17-2007
2.00
Oil cooler installation
Details
02-17-2007
2.00
Join top and bottom of cowl
02-15-2007
2.00
Trial fit of both halves
Details
02-14-2007
1.50
Started installation fo top cowling
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Zodiac 601 XL Home
Category
# Logs
# Hours
All
541
2696
Ailerons
8
38
Avionics
22
110
Baggage Tray
7
18
Brakes
2
14
Canopy
20
141
Center Fuselage
18
116
Centre spar
1
37
Cowling
24
109
Empennage
44
231
Engine
13
114
Fairing
13
87
Final Assembly
1
39
Firewall
13
66
Flap assembly
5
30
Flight testing
4
25
Front Fuselage
46
115
Fuselage
29
176
FWF
5
16
Instrument panel
1
50
Left Wing
33
76
Miscellaneous
43
142
Mounting Horizontal
3
4
Painting
56
219
Prop
1
7
Rear turtle deck
8
38
Shop Supplies
1
2
Test flying
4
10
Undercarriage
3
6
Undercarridge
3
6
Upgrade
2
52
Upholstery
2
6
Weight and Balance
1
1
Wheels and brakes
14
41
Wings
91
554
Copyright © 2001-2025 Matronics. All Rights Reserved.