KitLog pro

Powered By Kitlog Pro v2.0

Vans RV-8 G-JBTR
Work Logs Found: 10
Category Work Time: 0 Hours
 Date
Hours
Work Log Summary

Details

 05-05-2012
0.00
Pressure test brake and fuel lines
Details

 04-19-2012
0.00
ASI Calibration
Details
       

 12-24-2011
0.00
Pop Rivet Tip for domed rivets
Details
     

 09-19-2009
0.00
Riveting close to skin joints
Details
       

 08-20-2008
0.00
Aileron Bracket W-414-R - Mistake
Details
       

 02-01-2008
0.00
Reduce those AN470 smileys
Details
       

 09-30-2007
0.00
Stop if you are tired or bored
Details
     

 09-19-2007
0.00
Study the drawings and study websites
Details

 02-02-2007
0.00
Take Your Time
Details

 02-02-2007
0.00
Rib Flange Centreline Making Tool
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.