Paul and Mike's Building Site
RV-7A
Systems
Work Logs Found:
29
Category Work Time:
60 Hours
Date
Hours
Work Log Summary
Details
04-08-2011
1.00
Fitted fuel vent connection from fuselage to wing
05-18-2008
6.50
Electric aileron and elevator trim
10-14-2007
3.50
Pitot, static, AOA install
10-07-2007
1.50
Pito, static, AOA plumbing design
07-04-2007
1.00
Mounted control cables
06-09-2007
1.00
Installed shunt and misc wiring
05-28-2007
2.00
Wiring conduit install
05-28-2007
1.00
Main fuel line fabrication
02-12-2007
1.00
Replaced one of the fuel pump lines
02-11-2007
6.00
Route lines in fuel pump
02-10-2007
4.00
Fuel pump enclosure construction
02-08-2007
1.50
Fuel pump enclosure fitting
02-07-2007
0.25
Mounted strobe power supply
02-06-2007
0.50
Started work on fuel boost pump
12-16-2006
2.00
Designed and installed flap position indicator
11-24-2006
2.00
Mounted elevator trim
11-23-2006
4.00
Fabricated and installed aileron trim
07-12-2006
1.00
Installed conduit in tail cone
04-22-2006
2.50
Routing of static line
04-08-2006
1.50
Installed rear portion of static system.
Details
02-19-2006
4.00
Installed brake lines on landing gear
02-11-2006
0.50
Started work on brake caliper
09-15-2005
2.00
Fabricated elevator push rods
09-07-2005
1.00
Mount fuel vents
09-05-2005
1.00
Mounted fuel selector
09-05-2005
0.50
JB Weld screens to fuel vents
09-05-2005
1.00
Installed brake lines
09-04-2005
2.00
Installed L&R fuel vent lines
09-03-2005
4.00
Installed brake pedal lines
SITE NAVIGATION
Contact Builder
RV-14A Home
RV-7A Home
Category
# Logs
# Hours
All
317
856
Avionics
52
106
Empennage
63
138
Engine
25
101
Finish Kit
18
110
Firewall Forward
14
26
Fuselage
56
144
Miscellaneous
25
54
Prop
2
13
Systems
29
60
Tools
1
2
Wings
32
102