KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
Work Logs Found: 12
Category Work Time: 10 Hours
 Date
Hours
Work Log Summary

Details

 11-27-2011
1.50
Engine Hoist assembly.
Details
     

 04-15-2009
0.10
Pneumatic rivet puller from Avery.
Details
     

 01-16-2009
1.00
Set up my new drill press.
Details
       

 09-14-2008
0.20
Tube bender and Tube Flaring tools.
Details
     

 07-17-2008
0.50
New 40 gallon parts washer
Details
     

 06-18-2008
0.10
Nibbler tool.
Details
       

 09-26-2007
0.10
New Longeron Yoke.
Details
     

 07-04-2007
0.50
Made 2 Rod End Bearing wrenches.
Details
       

 02-07-2007
0.50
Fabricated a Trailing Edge bender.
Details
       

 01-27-2007
0.10
Pneumatic squeezer and cleco pliers
Details
     

 01-23-2007
3.50
Built a table for the DRDT-2
Details
       

 11-15-2006
2.00
Tungsten Bucking Bar
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.