Powered By Kitlog Pro v2.0
ALBERT'S WEB SITE
Zodiac XL
Engine
Work Logs Found:
73
Category Work Time:
124 Hours
Date
Hours
Work Log Summary
Details
08-11-2009
0.50
SECOND ENGINE RUN for correction
Details
08-06-2009
1.50
Corrections from runup
Details
08-04-2009
1.00
FIRST ENGINE RUN on aircraft
Details
07-28-2009
1.00
Primer solenoid and canopy hold open.
Details
07-24-2009
1.00
Cowl Rod
Details
07-17-2009
1.00
Fuel leak check
Details
06-15-2009
1.00
Cabin heat
Details
06-11-2009
1.00
Cabin Heat
Details
06-10-2009
1.00
Engine controls
Details
06-08-2009
1.00
Mixture control
Details
06-04-2009
1.00
CARB HEAT MUFF
Details
06-01-2009
1.00
Mixture control bracket
Details
05-28-2009
1.00
Exhaust manifold
Details
05-25-2009
1.00
Alternate Air source door
Details
05-22-2009
1.00
Exhaust pipes
Details
04-08-2009
1.50
Carb intake box
Details
03-26-2009
1.00
CARB AIR
Details
03-19-2009
1.00
Engine Ground strap
Details
03-13-2009
1.00
Primer and baffling
Details
03-09-2009
1.00
Intake pipes
Details
12-31-2008
1.50
Nose Bowl
Details
12-30-2008
1.00
Oil lines
Details
12-29-2008
1.00
Tach hookup
Details
12-05-2008
1.00
Rewiring eng
Details
12-04-2008
1.50
Moving oil instrumentation
Details
12-02-2008
1.00
Ignition wires
Details
12-01-2008
1.50
Ignition wires
Details
11-22-2008
1.50
Oil Lines
Details
11-20-2008
1.50
Baffling
Details
11-06-2008
2.00
Wiring
Details
11-05-2008
1.50
Baffling
Details
11-04-2008
2.00
WIRING ENGINE
Details
10-20-2008
2.00
Engine on aircraft
Details
10-19-2008
2.00
Engine prep
Details
10-17-2008
1.50
ENGINE DELIVERED
Details
07-29-2008
2.00
Air Box
Details
07-14-2008
2.00
Engine control cables
Details
06-27-2008
2.00
Throttle and Carb Heat controls
Details
06-26-2008
2.00
Mixture Control
Details
06-12-2008
2.00
Oil Cooler
Details
05-30-2008
2.00
Baffling
Details
05-29-2008
2.00
Old core engine on frame
Details
05-22-2008
2.00
Core engine on frame
05-21-2008
2.00
Engine baffling
Details
05-19-2008
2.00
Old core prep
Details
04-09-2008
1.00
F/P shims
Details
03-29-2008
2.00
Baffle kit - prop
Details
02-15-2008
2.00
Air oil separator
Details
12-28-2007
1.00
Oil system
Details
12-18-2007
2.00
More cleaning
Details
12-07-2007
1.50
Ignition F/W
Details
12-06-2007
2.00
Ignition
Details
12-03-2007
2.00
Ignition
Details
11-30-2007
2.00
Ignition
Details
11-20-2007
2.00
Engine parts
Details
11-02-2007
2.00
Valve covers
Details
10-29-2007
2.00
Rear top housing
Details
10-16-2007
3.00
Engine cleaning
Details
10-15-2007
2.00
Case cleanup
Details
10-11-2007
3.00
Rear case
Details
10-10-2007
2.00
Bell housing trim
Details
10-09-2007
2.00
Engine heads
Details
10-08-2007
2.00
Engine heads
Details
10-05-2007
2.00
Engine heads
Details
06-04-2007
2.00
Engine work bench
Details
06-01-2007
3.00
Engine teardown
Details
05-28-2007
3.00
Engine tear down
Details
05-25-2007
3.00
Engine teardown
Details
05-21-2007
2.00
Engine tear down
Details
05-18-2007
3.00
Disassembly
Details
05-17-2007
4.00
Corvair engine
Details
04-07-2007
2.00
Battery buss fuse block
Details
01-26-2007
2.00
Oil and fuel
Details
SITE NAVIGATION
Contact Builder
Zodiac XL Home
Category
# Logs
# Hours
All
586
1187
Avionics
7
14
Cabin
32
66
Canopy
38
80
Controls
20
40
Cowling
13
16
Dual stick
3
6
Electrical
30
64
Empennage
42
91
Engine
73
124
Fuselage
128
317
Instruments
13
24
Interior
4
9
Landing gear
25
52
Lft Wing
33
68
Miscellaneous
23
40
Mods
9
13
None
1
2
Prop
7
9
Rt wing
17
30
Updates by Zenth
23
32
Wings
23
46
Wiring
22
44
Copyright © 2001-2024 Matronics. All Rights Reserved.