Construction Of the Europa XS
Work Logs Found: 17
Category Work Time: 65 Hours
 Date
Hours
Work Log Summary

Details

 04-24-2009
6.50
Flap Root Extensions
Details
       

 02-08-2009
3.25
Flap Drive Motor
Details
       

 02-01-2009
7.80
Flap Drive
Details
       

 02-22-2006
1.50
Flap Hinge
Details
       

 02-21-2006
3.50
Flap Hinges
Details
     

 02-20-2006
2.50
STBD flap for the hinges
Details
       

 02-19-2006
6.50
Flap hinges
Details
     

 02-18-2006
3.50
Flap Hinged
Details
     

 02-17-2006
3.00
Cracked out the flap
Details
     

 02-16-2006
3.00
Laying up the top skin of the Port flap
Details
     

 02-15-2006
5.00
Preparing both flaps
Details
     

 02-12-2006
5.00
Pepard the STBD Flap for laminating
Details

 02-11-2006
5.00
Flap Layup STBD
Details
       

 02-10-2006
2.50
Joined Port Flaps Cors and Port ailaron Hinges
Details

 02-09-2006
3.50
Rib Cut Out
Details
     

 01-08-2006
1.25
Ribs, After curing
Details
     

 01-07-2006
2.00
Flap Rib Prep.