Date
|
Hours
|
Work Log Summary

|
Details

|
11-23-2009
|
3.75
|
prep fuselage for engine mount
|
Details
|
|
|
11-21-2009
|
3.00
|
door latches
|
Details
|
  |
|
11-20-2009
|
1.25
|
door trim & window braces
|
Details
|
  |
|
11-19-2009
|
4.00
|
fitting door lexan
|
Details
|
  |
|
11-18-2009
|
3.50
|
left door
|
Details
|
  |
|
11-17-2009
|
5.00
|
left door & flap handle
|
Details
|
  |
|
11-16-2009
|
1.00
|
flap lever bushings
|
Details
|
  |
|
11-13-2009
|
3.50
|
lower cowl
|
Details
|
  |
|
11-12-2009
|
4.00
|
boot cowl
|
Details
|
  |
|
11-10-2009
|
1.75
|
window of right door
|
Details
|
  |
|
10-31-2009
|
4.00
|
Strobes & brakes
|
Details
|
  |
|
10-30-2009
|
3.00
|
Fuel system
|
Details
|
|
|
10-29-2009
|
1.50
|
Fuel system
|
Details
|
  |
|
10-28-2009
|
3.00
|
Fuel system
|
Details
|
  |
|
10-27-2009
|
2.50
|
brakes & throttle
|
Details
|
  |
|
10-26-2009
|
3.00
|
Torque tube
|
Details
|
  |
|
10-22-2009
|
2.00
|
Torgue tube
|
Details
|
  |
|
10-21-2009
|
2.00
|
brakes & rudder
|
Details
|
  |
|
10-16-2009
|
4.50
|
Fuel lines & rudder pedal
|
Details
|
  |
|
10-15-2009
|
7.00
|
install floorboards
|
Details
|
 |
|
08-03-2009
|
1.00
|
Gear leg pins
|
Details
|
  |
|
08-02-2009
|
2.00
|
New fairing mounts
|
Details
|
  |
|
07-25-2009
|
4.00
|
Rudder deflection
|
Details
|
  |
|
07-23-2009
|
4.00
|
Brakes & gear legs
|
Details
|
  |
|
07-22-2009
|
4.00
|
Elevator exit holes & tailwheel
|
Details
|
  |
|
03-02-2009
|
3.00
|
Instrument panel
|
Details
|
  |
|
03-01-2009
|
4.00
|
ELT
|
Details
|
  |
|
02-23-2009
|
2.50
|
ELT
|
Details
|
  |
|
02-21-2009
|
3.00
|
ELT
|
Details
|
  |
|
02-20-2009
|
2.00
|
boot cowl & antenna mounts
|
Details
|
  |
|
02-19-2009
|
2.00
|
fuel line
|
Details
|
  |
|
02-18-2009
|
2.50
|
fuel line
|
Details
|
  |
|
02-16-2009
|
3.00
|
paint header tank
|
Details
|
  |
|
01-30-2009
|
4.50
|
Boot cowl
|
Details
|
  |
|
01-28-2009
|
3.00
|
Boot cowl
|
Details
|
|
|
01-27-2009
|
1.00
|
Move wings to hangar
|
Details
|
  |
|
01-06-2009
|
1.00
|
Station 3 closeout
|
Details
|
  |
|
02-22-2008
|
4.00
|
Seats
|
Details
|
  |
|
02-21-2008
|
4.00
|
Seats
|
Details
|
  |
|
02-01-2008
|
1.50
|
Boot cowling
|
Details
|
  |
|
01-06-2007
|
3.50
|
Battery Box
|
Details
|
  |
|
01-04-2007
|
1.50
|
Battery Door
|
Details
|
  |
|
09-12-2006
|
0.50
|
Construct elevator
|
Details
|
  |
|
09-10-2006
|
1.50
|
install horizontal stabilizers
|
Details
|
  |
|
09-10-2006
|
2.00
|
align holes in horiztonal stabilizer
|
Details
|
  |
|
09-08-2006
|
0.50
|
align holes in stabilizer
|
Details
|
  |
|
09-07-2006
|
1.25
|
Align holes in stabilizer
|
Details
|
  |
|
09-06-2006
|
1.25
|
fit horizontal stabilizer
|
Details
|
|
|
09-05-2006
|
4.00
|
Resand floorboards
|
Details
|
  |
|
09-05-2006
|
2.00
|
Gearleg fairings
|
Details
|
  |
|
08-31-2006
|
2.90
|
Pack Wheel Barings
|
|
  |
|
08-12-2006
|
8.00
|
Complete gear legs
|
Details
|
  |
|
08-06-2006
|
1.50
|
final fit of acle to wheels
|
Details
|
|
|
08-05-2006
|
1.50
|
preliminary assemble gear legs
|
Details
|
|
|
08-05-2006
|
1.50
|
Assemble tires & tubes on wheels
|
|
  |
|
07-09-2006
|
1.50
|
bend flying wire tangs at Dan's
|
|
  |
|
06-27-2006
|
1.00
|
deburr tangs
|
Details
|
  |
|
06-07-2006
|
0.50
|
Heel pads
|
Details
|
  |
|
05-23-2006
|
2.00
|
Prep fittings.
|
Details
|
  |
|
05-21-2006
|
2.00
|
Prep fittings
|
Details
|
  |
|
05-20-2006
|
0.50
|
Floorboards
|
Details
|
  |
|
05-19-2006
|
1.00
|
Floorboards
|
Details
|
  |
|
05-18-2006
|
0.50
|
Floorboards
|
Details
|
  |
|
05-16-2006
|
0.50
|
First coat varnish.
|
|
  |
|
05-15-2006
|
1.50
|
Floorboards.
|
Details
|
 |
|
05-14-2006
|
2.50
|
Floorboards.
|
Details
|
|
|
05-09-2006
|
2.00
|
Re-install formers.
|
Details
|
  |
|
05-07-2006
|
1.50
|
Post paint work.
|
Details
|
  |
|
05-05-2006
|
4.00
|
Spray white 2 part urethane.
|
Details
|
  |
|
05-04-2006
|
0.75
|
Sand cockpit area.
|
|
|
|
05-03-2006
|
1.00
|
Sand cockpit area.
|
|
  |
|
04-30-2006
|
3.00
|
Spray white 2 part urethane.
|
Details
|
  |
|
04-28-2006
|
2.50
|
Spray white 2 part urethane.
|
Details
|
  |
|
04-24-2006
|
2.50
|
Spray white 2 part urethane.
|
Details
|
  |
|
04-23-2006
|
0.50
|
sand tubes
|
Details
|
  |
|
04-22-2006
|
5.50
|
Spray white 2 part urethane
|
Details
|
  |
|
04-20-2006
|
0.50
|
Make rudder bracket
|
|
  |
|
04-19-2006
|
1.00
|
Make tail rotation post
|
Details
|
  |
|
04-02-2006
|
1.50
|
Mask formers
|
Details
|
  |
|
03-19-2006
|
1.50
|
Parts
|
Details
|
  |
|
03-14-2006
|
0.75
|
formers
|
Details
|
  |
|
03-11-2006
|
2.50
|
formers
|
Details
|
  |
|
03-10-2006
|
1.20
|
Lower former
|
Details
|
  |
|
03-09-2006
|
0.50
|
Top former
|
Details
|
  |
|
02-27-2006
|
1.50
|
Inventory parts
|
Details
|
  |
|
02-26-2006
|
1.50
|
Inventory parts
|
|
  |
|
02-24-2006
|
0.50
|
Inventory Parts
|
Details
|
  |
|
02-23-2006
|
4.00
|
Bring home box
|
|
|
|
02-23-2006
|
4.00
|
Bring home box
|
Details
|
|
|
02-17-2006
|
0.25
|
Rans phone call
|
Details
|
  |