Powered By Kitlog Pro v2.0
Jason Heath's Cozy MKIV
MarkIV
Ch9 Main Gear & LB
Work Logs Found:
58
Category Work Time:
31 Hours
Date
Hours
Work Log Summary
Details
07-06-2008
0.00
Main Gear Complete
07-05-2008
0.00
Axle, Brake, Heat Sheild assembly
07-04-2008
0.00
Brake Caliper Clearance
07-03-2008
0.00
Leg Ends Trimmed
07-02-2008
0.00
Heat Sheild & Backing Plate
07-01-2008
0.00
Bolt holes drilled and alignment Quadruple checked
06-30-2008
0.00
Flox Pad w/ proper Toe & Camber
06-29-2008
0.00
3 ply BID Wrap
06-28-2008
0.00
Axle Alignment Test
06-26-2008
0.00
Axle Mounting Templates
06-25-2008
0.00
The Goods
06-24-2008
0.00
Ready for Wheels
06-23-2008
0.00
BID Tape on underside of LG box cover
06-22-2008
0.00
LG Box Glassed
06-19-2008
0.00
Foam filler & 2 Ply BID over MG-3
06-18-2008
0.00
Washer & 2 Ply BID on LG Tabs
06-16-2008
0.00
Torque Tube Holes Drilled in LG Bulkheads
06-15-2008
0.00
Landing Gear Box Cover
06-14-2008
0.00
Landing Brake Actuator
06-11-2008
0.00
Inside layup on Landing Brake
06-10-2008
2.00
More Landing Brake (hinge)
05-27-2008
0.00
Landing gear cover completed
05-26-2008
0.00
Landing Brake recess trimmed
05-25-2008
0.00
Landing brake recess glassed
05-24-2008
0.00
LG cover inside glassed
05-22-2008
0.00
Landing brake (continued)
05-21-2008
0.00
LG Cover, inside profile
05-20-2008
0.00
LG cover removed and trimmed
05-19-2008
1.00
Gear Cover Glassed
05-18-2008
0.00
Landing Gear Cover
05-16-2008
0.00
3/4" Holes in LG Tabs w/mg-3's
05-11-2008
0.00
MG-4 installation
05-10-2008
12.00
Gear leg mounting hardware
05-10-2008
0.00
Floxing in MG plates
05-09-2008
0.00
Test fit of MLG
Details
05-06-2008
0.00
All layups trimmed
05-04-2008
0.00
Hell hole reinforcement
Details
05-03-2008
0.00
Reinforcements between forward LGB and rear LGB
05-02-2008
0.00
Forward LGB reinforcements
05-05-2007
0.00
Landing brake hinge parts
04-24-2007
0.00
Landing Brake
03-31-2007
0.00
Second 45 ply trimmed
Details
03-17-2007
0.00
Second Layup
03-16-2007
0.00
Attached tabs ready for second layup
01-28-2007
0.00
First 45 layer layup
01-27-2007
0.00
Ready for layup
01-27-2007
0.00
Closeups
01-26-2007
0.00
Inverted and mounted to table
01-26-2007
0.00
Fixture bondoed to strut
01-25-2007
0.00
Geometric Futility Jig
01-25-2007
0.00
Fixture parts
01-21-2007
5.00
2nd 4 ply UNI layup
01-19-2007
2.00
Conduit layup trimmed
01-18-2007
2.00
2 ply BID layup on conduit
01-17-2007
1.00
Brake line conduit
01-14-2007
6.00
1st 4ply layup
01-13-2007
0.00
Main Strut Preperation
08-23-2006
0.00
Main Gear Strut
SITE NAVIGATION
Contact Builder
MarkIV Home
Category
# Logs
# Hours
All
160
63
Ch1-3 Pre-Planning
5
Ch13 Nose Gear
4
2
Ch18 Canopy
1
1
Ch4 Bulkheads
6
Ch5 Fuselage Sides
12
Ch6 Fuselage Assembl
30
Ch7 Exterior
24
26
Ch8 Headrest & Seatb
11
1
Ch9 Main Gear & LB
58
31
EAA Airventure
3
Links
3
Wheel Pants
3
2
Copyright © 2001-2024 Matronics. All Rights Reserved.