Powered By Kitlog Pro v2.0
Jim's Web Site
RV-9A
Wings
Work Logs Found:
8
Category Work Time:
90 Hours
Date
Hours
Work Log Summary
Details
06-12-2009
30.00
Install wings on fuselage
Details
06-11-2009
20.00
Flaps and Ailerons
Details
03-13-2009
10.00
Wing tips, fuel line and ctr forward floor panel
Details
03-13-2008
5.00
pushrods and HS work
Details
03-05-2008
2.00
Flaps, pushrod and HS tips
Details
03-04-2008
2.00
Aileron pushrods are 3/4 inch too long.
Details
02-19-2008
15.00
Lower skin and wing tips
Details
01-22-2008
6.00
Drilling 3/4 inch holes in wings ribs for flex tub
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
165
1695
Airbox
11
96
Baffling
14
137
Canopy
8
97
Cowl
6
90
Elevator
1
5
Empennage
17
66
Engine
4
45
Filberglass tips
6
90
Forward Fuselage
14
137
Fuel Tank Left
8
97
Fuselage
27
380
Gear Fairings
2
4
Miscellaneous
2
11
motor
1
5
Paint
2
4
Panel
2
13
Right Aileron
1
5
Trim tab work
14
137
Wing Tips
11
96
Wings
8
90
Wiring
6
90
Copyright © 2001-2024 Matronics. All Rights Reserved.