Powered By Kitlog Pro v2.0
Dugans' Skybolt Web Site
Skybolt
Engine
Work Logs Found:
49
Category Work Time:
195 Hours
Date
Hours
Work Log Summary
Details
07-02-2012
0.20
Engine Run
Details
02-06-2012
4.00
Electronic Ignition
Details
02-05-2012
3.00
Electronic Ignition
Details
02-04-2012
3.00
Electronic Ignition
Details
01-26-2012
1.50
More Oil Hoses
Details
01-25-2012
1.00
Oil and Fuel Hose Configuration
Details
01-25-2012
20.00
Engine Oil/Fuel hose Installation
01-01-2012
15.00
Oil and Fuel Hose build up
Details
12-01-2011
3.50
Fuel Line
Details
11-20-2011
3.00
Engine
Details
11-12-2011
3.00
Exhaust
Details
10-24-2011
2.00
Engine Exhaust
Details
10-23-2011
5.00
Engine
Details
09-25-2011
3.50
Exhaust
Details
04-16-2011
5.50
Engine Cowling
Details
04-11-2011
2.00
Engine Cowling
Details
03-31-2011
1.50
Prop Flange
Details
03-23-2011
2.50
Electronic Ignition
Details
03-20-2011
4.00
Electronic Ignition
Details
03-17-2011
2.50
Battery Box
Details
03-12-2011
3.00
Engine Installation
Details
03-12-2011
2.50
Engine Installation
Details
03-11-2011
2.00
Engine Install
Details
03-10-2011
4.00
Engine Install
Details
03-08-2011
3.50
Fuel System
Details
03-06-2011
1.50
Engine Mount
Details
03-05-2011
6.80
Firewall Install
Details
03-04-2011
3.00
Fuel System
Details
03-03-2011
2.00
Fuel System
Details
03-03-2011
3.50
Fuel System
Details
03-02-2011
1.50
Engine
Details
02-27-2011
4.00
Engine
Details
02-26-2011
7.50
Engine
Details
02-24-2011
6.00
Engine
Details
02-21-2011
4.00
Engine
Details
02-17-2011
2.00
Engine
Details
02-14-2011
3.50
Engine
Details
02-13-2011
4.00
Engine
Details
02-12-2011
2.50
Engine
Details
02-11-2011
3.50
Engine
Details
02-10-2011
3.80
Engine
Details
12-01-2010
4.50
Install Electronic Ignition Modules
Details
10-31-2010
5.00
Engine Prep
Details
10-05-2010
4.00
Fuel Line
10-03-2010
2.00
Engine Transport
Details
09-27-2010
13.00
Firewall Work
Details
05-31-2010
3.50
Fuel System
Details
05-06-2010
1.50
Throttle cable stop
Details
05-05-2010
2.00
Throttle cable stop
Details
SITE NAVIGATION
Contact Builder
Skybolt Home
Category
# Logs
# Hours
All
409
1531
Avionics
5
19
Canopy
5
16
Canopy
4
20
Canopy
26
78
Controls
2
4
Covering
60
257
EAA Tech Advisor Ins
2
4
Electrical
14
45
Empennage
5
16
Engine
49
195
Engine Cowl
26
78
Engineer, research,
2
4
Fuel System
60
257
Fuselage
57
155
Hardware
26
78
Miscellaneous
4
6
Paint
4
20
Prop
1
2
Sheet metal work
14
45
Wings
43
232
Copyright © 2001-2024 Matronics. All Rights Reserved.