|
|
|
|
SCOTT'S WEB SITE
Work
Logs
Found:
31
|
Category Work Time: 407 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
12-13-2007
|
28.00
|
Adding wings and controls
|
|
|
|
07-22-2005
|
11.00
|
Final wiring of wing
|
|
|
|
07-03-2005
|
7.00
|
Pitot riveted into position
|
|
|
|
06-29-2005
|
12.00
|
Review of wing wiring
|
|
|
|
05-30-2005
|
5.00
|
Drill holes for nav/strobe light. Install exterior
|
|
|
|
05-07-2005
|
5.00
|
Wing Landing/Taxi Lights - Finish up
|
|
|
|
05-04-2005
|
16.00
|
Wing Landing/Taxi Light
|
|
|
|
05-03-2005
|
8.00
|
Wiring fuel tank second wing
|
|
|
|
04-23-2005
|
17.00
|
Finish trim tab, add pitot
|
|
|
|
02-24-2005
|
65.00
|
Showing both wings, building sender unit
|
|
|
|
01-15-2005
|
17.00
|
Final touch up before raising to ceiling
|
|
|
|
12-17-2004
|
45.00
|
Clean table, start second wing
|
|
|
|
12-14-2004
|
12.00
|
Finish Locker, add aileron and flaps for position
|
|
|
|
12-02-2004
|
4.00
|
String wire for lights
|
|
|
|
11-25-2004
|
6.00
|
Build the actual locker cover
|
|
|
|
11-22-2004
|
12.00
|
Baggage Locker
|
|
|
|
10-02-2004
|
7.00
|
Fit tank and drain
|
|
|
|
10-02-2004
|
2.00
|
Access cover for aileron bellcrank, overflow tube
|
|
|
|
09-01-2004
|
12.00
|
Cleco top skin to ribs, prepare tank for install
|
|
|
|
08-29-2004
|
15.00
|
Rivet bottom skin and roll nose skin into position
|
|
|
|
08-26-2004
|
9.00
|
Inboard and outboard sides, bottom skin
|
|
|
|
08-26-2004
|
12.00
|
add nose ribs and skin
|
|
|
|
08-24-2004
|
7.00
|
Add top skin and fuel cutout
|
|
|
|
08-22-2004
|
8.00
|
After assembly, remove them, check level and reass
|
|
|
|
08-17-2004
|
12.00
|
Bellcrank and stiffeners
|
|
|
|
08-15-2004
|
13.00
|
The ribs are adding up
|
|
|
|
08-13-2004
|
7.00
|
Starting the Wing
|
|
|
|
08-10-2004
|
6.00
|
Ailerons
|
|
|
|
08-07-2004
|
16.00
|
Flaps
|
|
|
|
08-04-2004
|
7.00
|
Layout flaps, install fairlead
|
|
|
|
08-04-2004
|
4.00
|
Got the Wings!
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |