Bill's RV-10 Builder Page
Work Logs Found: 44
Category Work Time: 418 Hours
 Date
Hours
Work Log Summary

Details

 08-07-2010
8.00
Shoulder belt studs in cabin top
Details
       

 02-21-2010
24.00
Windsheild
Details
       

 12-09-2009
10.00
Rear Windows
Details
       

 11-05-2009
4.00
Added 2 hardpoints for rear seat belt harness
Details
       

 06-02-2008
15.00
Installed door pins and blocks and lock assembly
Details

 05-30-2008
15.00
Assembled and installed door handles

 05-11-2008
15.00
Doors - Continued
       

 05-07-2008
15.00
Doors - continued
Details
       

 05-05-2008
3.00
Started Doors
Details
     

 05-03-2008
10.00
Rear Seat Backs
Details
     

 04-01-2008
8.00
Fitting the Top - More Tools
Details
       

 02-09-2008
50.00
Basic fitting of top to fuselage - tools
Details
       

 12-22-2007
2.00
Fitting baggage corrugation
Details
       

 12-22-2007
4.00
Baggage Door

 12-21-2007
8.00
Prepping RH baggage cover & riveting bulkhead flan
Details
     

 12-15-2007
4.00
Riveting Baggage area
Details

 12-09-2007
20.00
Flap Control System
Details

 12-01-2007
15.00
Installed Control Systems
Details
       

 11-03-2007
6.00
Installed brake lines and master cylinder
Details
       

 11-01-2007
6.00
Installed fuel filter, boost pump, and flo scan
Details
     

 10-29-2007
8.00
Installed Matco Parking Brake
Details
     

 10-26-2007
8.00
Assembled Rudder pedals
Details
       

 10-13-2007
5.00
Finished Blind rivets front and rear floors
Details

 10-11-2007
2.00
Riveted LH front seat floor

 10-10-2007
6.00
Completed wiring of Strobe power supply
Details
       

 09-15-2007
40.00
Battery Tray and Main Power Wiring
Details
       

 08-15-2007
40.00
Electrical System Design
Details
       

 08-02-2007
1.00
Baggage Area - door seals
Details
       

 08-01-2007
3.00
Baggage area
Details
     

 07-31-2007
6.00
Riveting tailcone to fuselage
Details
     

 07-28-2007
6.00
Riveting Tailcone to Fuse
Details
       

 07-27-2007
10.00
Riveting tailcone to Fuselage
Details
       

 07-26-2007
4.00
Began riveting tailcone to fuselage
Details

 07-18-2007
3.50
Tailcone attach
Details
     

 07-16-2007
3.00
Match drilling and CSKing tailcone attach
Details
       

 07-15-2007
9.00
Tailcone attach
Details
       

 07-14-2007
2.50
Rivet misc nutplates, bagg door cutout,

 07-14-2007
1.00
Fuselage Step installation
Details
       

 07-12-2007
4.00
Inpected QB Fuse side skins and adjusted baggage d
Details
       

 07-11-2007
2.50
QB Inspection Fwd Fuse ribs, Blkhds, and Bottom Sk
Details

 07-10-2007
3.00
QB Fuselage Firewall work
Details
       

 07-08-2007
1.50
QB inspection Mid Fuselage and bottom skins
Details
     

 07-04-2007
7.00
Deconstructed QB Fuse and inspected work
Details
       

 11-20-2006
0.00
QB Fuselage
Details
       