Powered By Kitlog Pro v2.0
Bill's RV-10 Builder Page
RV-10
Fuselage
Work Logs Found:
44
Category Work Time:
418 Hours
Date
Hours
Work Log Summary
Details
08-07-2010
8.00
Shoulder belt studs in cabin top
Details
02-21-2010
24.00
Windsheild
Details
12-09-2009
10.00
Rear Windows
Details
11-05-2009
4.00
Added 2 hardpoints for rear seat belt harness
Details
06-02-2008
15.00
Installed door pins and blocks and lock assembly
Details
05-30-2008
15.00
Assembled and installed door handles
05-11-2008
15.00
Doors - Continued
05-07-2008
15.00
Doors - continued
Details
05-05-2008
3.00
Started Doors
Details
05-03-2008
10.00
Rear Seat Backs
Details
04-01-2008
8.00
Fitting the Top - More Tools
Details
02-09-2008
50.00
Basic fitting of top to fuselage - tools
Details
12-22-2007
2.00
Fitting baggage corrugation
Details
12-22-2007
4.00
Baggage Door
12-21-2007
8.00
Prepping RH baggage cover & riveting bulkhead flan
Details
12-15-2007
4.00
Riveting Baggage area
Details
12-09-2007
20.00
Flap Control System
Details
12-01-2007
15.00
Installed Control Systems
Details
11-03-2007
6.00
Installed brake lines and master cylinder
Details
11-01-2007
6.00
Installed fuel filter, boost pump, and flo scan
Details
10-29-2007
8.00
Installed Matco Parking Brake
Details
10-26-2007
8.00
Assembled Rudder pedals
Details
10-13-2007
5.00
Finished Blind rivets front and rear floors
Details
10-11-2007
2.00
Riveted LH front seat floor
10-10-2007
6.00
Completed wiring of Strobe power supply
Details
09-15-2007
40.00
Battery Tray and Main Power Wiring
Details
08-15-2007
40.00
Electrical System Design
Details
08-02-2007
1.00
Baggage Area - door seals
Details
08-01-2007
3.00
Baggage area
Details
07-31-2007
6.00
Riveting tailcone to fuselage
Details
07-28-2007
6.00
Riveting Tailcone to Fuse
Details
07-27-2007
10.00
Riveting tailcone to Fuselage
Details
07-26-2007
4.00
Began riveting tailcone to fuselage
Details
07-18-2007
3.50
Tailcone attach
Details
07-16-2007
3.00
Match drilling and CSKing tailcone attach
Details
07-15-2007
9.00
Tailcone attach
Details
07-14-2007
2.50
Rivet misc nutplates, bagg door cutout,
07-14-2007
1.00
Fuselage Step installation
Details
07-12-2007
4.00
Inpected QB Fuse side skins and adjusted baggage d
Details
07-11-2007
2.50
QB Inspection Fwd Fuse ribs, Blkhds, and Bottom Sk
Details
07-10-2007
3.00
QB Fuselage Firewall work
Details
07-08-2007
1.50
QB inspection Mid Fuselage and bottom skins
Details
07-04-2007
7.00
Deconstructed QB Fuse and inspected work
Details
11-20-2006
0.00
QB Fuselage
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
354
2016
ADS-B
2
10
Alexander Tech Cente
7
68
Avionics
1
10
Avionics
16
167
Electrical
2
10
Engine
8
35
Final Assembly
3
52
First Flight 8/25/20
1
1
Fuselage
44
418
Horizontal Tail
62
154
Interior
4
23
Maintenance & Post B
15
95
Miscellaneous
7
20
O2 Console
14
Painting A-Z
38
378
Panel
16
167
Tailcone
52
114
Tools
2
7
Undercarriage & Engi
6
53
Vertical Tail
2
4
Wheel pants
4
68
Wings
38
154
Workshop
10
8
Copyright © 2001-2024 Matronics. All Rights Reserved.