Powered By Kitlog Pro v2.0
Chad's Challenger II Site
Challenger II Long Wing
Paint
Work Logs Found:
22
Category Work Time:
96 Hours
Date
Hours
Work Log Summary
Details
11-20-2007
4.00
Painting the ailerons through silver
Details
11-19-2007
3.00
Misc. metal and plastic parts epoxy primered
Details
11-04-2007
6.00
Sprayed Gray
Details
11-03-2007
3.00
Spraying Red
Details
11-01-2007
3.00
Masking Tail Surfaces
Details
10-17-2007
3.00
Removed All Masking from Fuselage
Details
10-17-2007
0.00
More pictures
10-14-2007
4.00
Masked and Sprayed Gray Stripe
Details
10-13-2007
3.00
Sprayed Red on Fuselage
Details
10-12-2007
3.00
Readied for Red
Details
10-11-2007
5.00
Taping for Trim and Stripes
Details
10-10-2007
3.00
White
Details
10-06-2007
3.00
Wet Sanding the Fueslage
Details
10-03-2007
7.00
Transported Fuselage for Paint and Masked
Details
06-09-2007
3.00
Painting the control rods and struts
Details
05-27-2007
4.00
Painting peripheral parts
Details
03-25-2007
5.00
Left Wing Rib Rivets and Finishing Tapes
Details
03-24-2007
8.00
Left Wing Poly-Brush and Longitudinal Tapes
Details
03-18-2007
8.00
Rib and wing tip finishing tapes
Details
03-17-2007
8.00
Finishing tapes and Rib rivets
Details
03-10-2007
8.00
Applied First Coat of Poly Brush
Details
11-20-2006
2.00
Painted three fiberglas Gap Cover segments
Details
SITE NAVIGATION
Contact Builder
Challenger II Long Wing Home
Category
# Logs
# Hours
All
193
693
Avionics
9
19
Controls
4
15
Covering
31
133
Electrical
13
50
Empennage
7
20
Engine
15
43
Fuselage
42
155
Instruments
2
15
Miscellaneous
15
49
None
7
6
Paint
22
96
Wings
26
92
Copyright © 2001-2024 Matronics. All Rights Reserved.