Powered By Kitlog Pro v2.0
Chuck S. Sportsman 2 +2 Site
Sportsman 2 + 2
Empennage
Work Logs Found:
11
Category Work Time:
23 Hours
Date
Hours
Work Log Summary
Details
10-06-2006
5.00
Electric elevator trim servo installation
Details
10-05-2006
5.50
Electric elevator trim servo installation
Details
10-04-2006
0.50
Elev Step 86 Rivet trim tab hinge half to the trim
Details
10-04-2006
2.00
Elev Step 85 Rivet trim tab hinge half to elevator
Details
10-04-2006
1.00
Elev Step 82 Drill remaining holes
Details
10-04-2006
0.25
Elev Step 81
Details
10-04-2006
0.50
Elev Step 80 Align hinge on elevator side and dril
Details
10-04-2006
1.00
Elev Step 79 Position trim tab hinge
Details
10-03-2006
1.50
Elevator Step 70 Rivet trailing edge of trim tab s
Details
10-03-2006
1.50
Elevator Step 69 Rivet the remaining Rib/Skin hol
Details
10-02-2006
4.00
Step 61 to 67
Details
SITE NAVIGATION
Contact Builder
Sportsman 2 + 2 Home
Category
# Logs
# Hours
All
92
276
Empennage
11
23
Flight controls
1
1
Fuselage
52
155
Landing gear
1
0
Receive and inv.
5
38
System Installation
12
22
Wings
10
37
Copyright © 2001-2024 Matronics. All Rights Reserved.