Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
Empennage
Work Logs Found:
13
Category Work Time:
15 Hours
Date
Hours
Work Log Summary
Details
11-22-2009
0.50
Elevator / Horizontal Stab Tips #9
Details
11-21-2009
0.70
Elevator / Horizontal Stab Tips #8
Details
11-20-2009
0.60
Elevator / Horizontal Stab Tips #7
Details
11-19-2009
0.40
Elevator / Horizontal Stab Tips #6
Details
11-18-2009
0.80
Elevator / Horizontal Stab Tips #5
Details
11-17-2009
0.80
Elevator / Horizontal Stab Tips #4
Details
11-16-2009
0.80
Elevator / Horizontal Stab Tips #3
Details
11-15-2009
2.60
Elevator / Horizontal Stab Tips #2
Details
11-14-2009
3.00
Elevator / Horizontal Stab Tips
Details
10-18-2009
1.20
Horizontal Stabilizer install
Details
01-26-2009
1.00
Elevator installation #2
Details
01-25-2009
1.50
Elevator installation #1
Details
09-26-2006
1.00
Tail Kit Arrived
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1571
2427
About me
1
Avionics
1
2
BENCHMARKS
26
25
Elevators
38
51
Empennage
13
15
Engine
2
4
Finishing
352
646
Firewall Forward
131
219
Fuselage
431
586
Hints and Tips
1
Horizontal Stab
37
50
Inspiration
1
Instrument Panel
1
Miscellaneous
13
2
Paint
22
69
polishing
40
101
post construction mx
1
PROGRESS CHARTS
2
Rudder
16
24
Shop
1
Shop Supplies
1
Tools
7
Vertical Stabilizer
9
15
What is an RV8
1
Wings
315
407
Wiring
108
211
Copyright © 2001-2024 Matronics. All Rights Reserved.