Powered By Kitlog Pro v2.0
Deems RV10 Project
RV-10
Cabin Doors & Window
Work Logs Found:
42
Category Work Time:
191 Hours
Date
Hours
Work Log Summary
Details
05-17-2007
3.50
Sec 45-21
Details
05-16-2007
5.00
Sec 45-20
Details
03-31-2007
5.50
Sec 45-19 steps 2-3
Details
03-29-2007
6.00
Sec 45-18 Steps 4 thru 9
Details
03-28-2007
5.50
Sec 45-18 Steps 1-3
Details
03-26-2007
3.50
Sec 45-8 step 6
Details
03-23-2007
5.00
Sec 45-08 steps 1-5
Details
03-21-2007
4.00
Sec 45-18 step 2 left window
Details
03-20-2007
4.00
Sec 45-18 step 1 rear
Details
02-02-2007
5.00
Sec 45 Finishing step 7
Details
02-01-2007
5.00
Sec 45 finishing step 6
Details
01-31-2007
6.50
Sec 45 Finishing Step 5
Details
01-30-2007
4.50
Sec 45 Finishing Step 4
Details
01-29-2007
7.00
Sec 45 Finishing step 3
Details
12-06-2006
5.00
Sec 45 finishing doors session #2
Details
12-05-2006
5.50
Sec 45 Doors finishing
Details
12-04-2006
7.00
Sec 45 Door gap fix Session #9
Details
12-01-2006
3.00
Sec 45 Door gap fix session # 8 both doors
Details
11-30-2006
6.50
Sec 45 Door Gap fix session #7 Both doors
Details
11-29-2006
5.00
Sec 45- Doorgap fix #6 Right and Left doors + cabi
Details
11-28-2006
5.00
Sec 45 Doorgap 5 Right and Left doors
Details
11-27-2006
3.75
Sec 45-Door gap 4 L& R
Details
11-25-2006
2.50
Sec 45 Door gap fix Right and Left doors
Details
11-24-2006
3.00
Sec 45 Door gap fix right and Left doors
Details
11-23-2006
2.00
Sec-45 Door Gap fix Right door
Details
11-21-2006
2.50
Sec 45-Door Gap
Details
11-17-2006
5.00
Sec 45-15 Right and Sec 45-16 steps 2-4 Left & Rig
Details
11-16-2006
6.50
Sec 45-15 Steps 1-3 Left door
Details
11-15-2006
6.50
Sec 45-12 & 45-14 Left Door
Details
11-14-2006
4.50
Sec 45-9,10,11, & 13 Left door
Details
11-13-2006
5.50
Sec 45-14 right
Details
11-10-2006
4.50
Sec 45-12&45-14 Right
Details
11-09-2006
5.00
Sec 45-9,-10,-11,-13 Right door
Details
10-21-2006
1.00
Sec 45-16 step 1
Details
10-20-2006
3.00
Sec 45-5 Steps 8-12 Right
Details
10-19-2006
4.50
Sec 45-6 and Sec 45-7 Right ALL steps
Details
10-18-2006
6.25
Sec 45-6 and Sec 45-7 all steps Left Door
Details
10-17-2006
3.25
Sec 45-5 Steps 8-11 Left
Details
10-17-2006
2.25
Sec 45-5 steps 1-7 Right
Details
10-16-2006
2.50
Sec 45-5 steps 1-7 Left
Details
10-14-2006
3.75
Sec 45-3 and Sec 45-4 all steps
Details
10-13-2006
6.25
Sec 45-2 steps 1 Thru 4
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
836
3113
Access covers and fl
5
17
Aileron
14
34
Aileron Actuation
5
10
Baggage Area
8
28
Baggage Door
3
10
Bottom Wing Skins
14
58
Brake Lines
4
16
Cabin Cover
24
100
Cabin Doors & Window
42
191
Cabin Heat
1
5
Control System
5
17
Electric
8
24
Empennage Attach
10
21
Empennage Fairings
5
10
Engine Mount & Landi
5
15
Final Assembly
51
170
Firewall
7
22
Firewall Forward
50
186
First Engine Start
1
2
Flap System
1
6
Flaps
16
46
Fuel System
3
11
Fuel Tanks
31
95
Fuse Side Skins
29
84
Fwd Fuse Ribs & BHDS
11
29
Gear & Wheel Fairing
27
124
Home Stretch
80
348
Horizontal Stabilize
28
65
Interior
23
111
Main Spar
7
20
Mid Fuse Bulkheads
7
21
Mid Fuse Ribs & Skin
18
58
Miscellaneous
1
2
Outboard Leading Edg
12
51
Painting
12
172
Painting Preparation
30
138
Panel
35
145
Ram Air
9
35
Rear Wing Spars
5
12
Rudder
18
36
Rudder Pedals & Brak
4
16
Seats and Seat Belts
1
2
Sec 24 Wing Tips
8
30
Spinner and Cowling
29
122
Stall Warning System
3
4
Steps Installation
2
4
Tailcone
36
87
Tailcone Attach
3
11
Technical Councilor
2
3
Top Wing Skins
11
41
Upper Fwd Fuse
7
19
Upper Fwd Fuse Insta
26
102
Vertical Stabilizer
12
34
Wing Install
7
29
Wing Ribs
11
32
Wing Tips
8
30
Wing Tips
1
2
Copyright © 2001-2025 Matronics. All Rights Reserved.