Date
|
Hours
|
Work Log Summary
|
Details
|
09-27-2006
|
5.50
|
final bodywork on wings, prepped for priming
|
Details
|
|
|
09-26-2006
|
5.50
|
fill & sand RH wing top & bottom
|
Details
|
|
|
09-25-2006
|
5.50
|
sand, fill fair LH wing bottom
|
Details
|
|
|
09-19-2006
|
5.50
|
LH & RH wings fill & fair
|
Details
|
|
|
09-19-2006
|
8.00
|
bodywork bottoms of ailerons flat
|
Details
|
|
|
09-18-2006
|
5.50
|
final sanding of LH wing top for contour
|
Details
|
|
|
09-18-2006
|
8.00
|
filled aileron cusps w/ laminates
|
Details
|
|
|
09-16-2006
|
5.50
|
fair & fill LH & RH wings
|
Details
|
|
|
09-16-2006
|
56.00
|
fair & fill both wings
|
Details
|
|
|
09-15-2006
|
8.00
|
spot fill rudder, laminated LE on wings
|
Details
|
|
|
09-15-2006
|
5.50
|
body work on RH wing, laminated LH iwng
|
Details
|
|
|
09-14-2006
|
5.50
|
laminated LH & RH wing leading edges on bottom of
|
Details
|
|
|
09-13-2006
|
7.50
|
filled & sanded rudder
|
Details
|
|
|
09-13-2006
|
4.50
|
body work on wings
|
Details
|
|
|
09-12-2006
|
5.50
|
removed door, removed wings, bodywork on lower sur
|
Details
|
|
|
09-12-2006
|
5.50
|
finished LH side of rudder, sanded under side of w
|
Details
|
|
|
09-11-2006
|
8.00
|
finished evaporator re-installation finished bodyw
|
Details
|
|
|
09-08-2006
|
5.50
|
fitted upper fuselage along seam w/ vert. stab., s
|
Details
|
|
|
09-07-2006
|
5.50
|
meeting w/ M Custard, filled to fair RH wing top-
|
Details
|
|
|
09-06-2006
|
5.50
|
fill/fair LH wing upper de-ice cuff & wing root
|
Details
|
|
|
09-05-2006
|
5.50
|
sand/fill LH top leading edge of wing for de-ice c
|
Details
|
|
|
09-01-2006
|
5.00
|
filled to fair wing & horizontal stab fillets, beg
|
Details
|
|
|
08-31-2006
|
5.50
|
filled to fair vert stab w/ micro, laminated tail
|
Details
|
|
|
08-30-2006
|
5.50
|
fill to fair vert stab w/ micro
|
Details
|
|
|
08-29-2006
|
5.50
|
surface work on vert stab
|
Details
|
|
|
08-28-2006
|
5.00
|
create fillets to wing root fairing leading edge,
|
Details
|
|