Powered By Kitlog Pro v2.0
Mikes Web Site
RV8
Fuselage
Work Logs Found:
32
Category Work Time:
104 Hours
Date
Hours
Work Log Summary
Details
02-26-2007
12.70
*&^9(*& gear legs :)
Details
01-30-2007
6.00
canopy frame
Details
01-29-2007
3.75
install fuselage bow (roll bar)
Details
01-27-2007
1.00
mid fuse covers
Details
01-25-2007
1.50
painting
Details
01-24-2007
4.50
painting of roll bar
Details
01-23-2007
1.20
side console gotcha big time
Details
01-22-2007
4.80
rudder stop install
Details
01-21-2007
0.75
elevator push rod manufactor
Details
01-20-2007
1.00
elevator bell crank
Details
01-20-2007
1.75
controls
Details
01-13-2007
4.75
installed empennage onto fuse
Details
01-09-2007
0.75
paint interior of fuse
Details
01-08-2007
2.75
fuse painting
Details
01-07-2007
2.75
interior fitting
Details
12-30-2006
2.75
interior covers and consoles
Details
12-29-2006
1.75
cabin covers and consoles
Details
12-22-2006
3.00
rear baggage and battery tray
Details
12-21-2006
2.50
mid cabin covers
Details
12-20-2006
5.00
more fuselage panels
Details
12-16-2006
0.50
finished nutplating the right rear fuse cover
Details
12-14-2006
3.25
Rear Seatback installation
Details
12-13-2006
2.75
more freakin nutplates
Details
12-12-2006
6.75
drilling, prepping and installing nutplates
Details
10-11-2006
6.25
installed rudder pedals
Details
10-10-2006
6.25
front seat back
Details
10-09-2006
1.50
installed flap control bar and control bar
Details
10-09-2006
2.75
contol bar rear seat bracket.
Details
10-08-2006
2.80
more floors fitting
Details
10-08-2006
1.75
installed the hinges for the seats front and back
10-06-2006
2.75
floor install
Details
10-05-2006
1.75
rudder cable runs
Details
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
90
258
Empennage
35
86
Fuselage
32
104
Miscellaneous
14
47
Tools
1
1
Wings
8
20
Copyright © 2001-2024 Matronics. All Rights Reserved.