Larry Winger's 601XL Project
Zodiac CH 650
Engine
Work Logs Found:
87
Category Work Time:
293 Hours
Date
Hours
Work Log Summary
Details
11-02-2014
2.50
Enlarged air inlets
Details
09-11-2014
2.00
Completed compression test
Details
07-14-2014
2.25
Worked on RPM input
Details
07-12-2014
0.00
4 - Good start on air inlet rings
Details
07-12-2014
0.00
3 - Moved CHT probe from top to bottom
Details
06-27-2014
3.70
Ran engine at 2,200 RPM for 1 hour
Details
06-23-2014
7.00
Engine shroud and more adjustments
Details
06-22-2014
3.50
First engine start on airframe
Details
06-06-2014
0.00
Sent carburetor for repair
Details
06-05-2014
3.00
Removed carburetor
Details
05-30-2014
1.75
Connected fuel lines inside cockpit
Details
10-08-2012
3.25
2 - Misc punch list items
Details
10-08-2012
2.00
1 - Misc. under cowling - replaced cowling
Details
10-07-2012
6.00
Completed & installed heat muff
Details
10-06-2012
2.75
Started fabricating SS heat muff
Details
10-01-2012
2.75
Moved carb heat muff and cabin heat valve
Details
08-17-2012
4.50
Tested and calibrated fuel flow
Details
08-04-2012
2.75
1 - Rewired fuel pumps
Details
08-03-2012
3.10
Wired fuel pumps
Details
08-02-2012
2.50
Wired igntion system
Details
08-01-2012
1.75
Completed OV protection/alternator wiring
Details
07-31-2012
3.50
Progress on alternator system wiring
Details
07-23-2012
3.50
Wired starter relay
Details
07-15-2012
1.00
2 - Connected oil temp and began oil pressure send
Details
07-15-2012
4.00
1 - Oil & filter changed and distributor set
Details
06-24-2012
2.50
Main wire to starter
Details
06-12-2012
0.75
Installed fuel pressure sender & fuel fittings
Details
06-10-2012
1.75
Re-pitched prop & installed firesleeve
Details
06-07-2012
0.80
Fuel line to carb and fuel filter installed
Details
06-06-2012
3.00
Re-routed 5th bearing oil line
Details
06-05-2012
3.25
Installed Floscan fuel meter
Details
06-04-2012
2.25
Installed fuel lines in cockpit and to carb
Details
10-11-2011
1.25
1 - Enlarged air inlets
Details
10-08-2011
8.75
1 - Installed spinner
Details
09-30-2011
1.25
2 - Marked spinner for cutouts
Details
09-30-2011
0.75
1 - Reinstalled intake manifold
Details
09-27-2011
3.75
Mounted and set adjustable prop
Details
09-14-2011
2.00
Installed cabin heat valve
Details
09-14-2011
1.75
Installed air filter box
Details
09-13-2011
2.75
Worked on mounting system for air filter box
Details
09-12-2011
3.25
Installed heat exchange muff
Details
09-12-2011
2.50
Completed heat exchange muff
Details
09-11-2011
3.25
Fabricated heat exchange muff
Details
09-10-2011
5.00
Fabricated air filter housing
Details
09-09-2011
3.00
Installed rubber baffle seals
Details
09-08-2011
1.75
Mounted 2.5" duct flange to carb bottom
Details
09-06-2011
2.50
Fitted the rubber baffle seal
Details
09-05-2011
5.00
Installed mixture control
Details
09-05-2011
3.00
Installed carb heat control and removed all cables
Details
09-04-2011
6.00
Made mixture control bracket and carb bottom plate
Details
09-03-2011
4.50
Installed throttle and linkage
Details
08-30-2011
2.75
Installed reverse throttle linkage
Details
08-27-2011
4.00
Installed engine stand-offs & alternator belt
Details
08-27-2011
1.50
Engine stand-offs fabricated
Details
12-04-2010
2.50
Temporary installed prop
Details
12-02-2010
1.50
Installed ignition wire to distributor
Details
12-01-2010
1.50
Installed oil lines to cooler
Details
11-29-2010
1.75
Mounted oil cooler
Details
11-28-2010
3.25
Moved alternator forward and mounted vertical baff
Details
11-27-2010
3.75
Installed exhaust system and worked on baffles
Details
11-26-2010
3.00
Added support tail to starter
Details
10-10-2010
3.25
Installed oil cooler baffling
Details
10-09-2010
8.00
Alternator mounted and baffling nearly complete
Details
10-08-2010
2.75
Started baffling work and alternator
Details
10-04-2010
1.00
Remounted engine
Details
10-03-2010
32.00
Brought my Corvair engine to life
Details
09-29-2010
3.00
Removed engine and packed for Corvair College 18
Details
01-12-2010
1.50
Intake manifold installed
Details
01-12-2010
1.00
Engine mounted
Details
01-08-2010
1.00
Installed battery connector in firewall
Details
01-07-2010
1.50
Fabricated & installed coil wires
Details
01-06-2010
3.00
Installed breather outlet tube & condensers
Details
01-04-2010
35.00
Installed ignition coils
Details
01-03-2010
0.75
Added hoses to oil breather
Details
01-02-2010
2.00
Installed oil separator and coil switcher
Details
12-29-2009
1.25
Installed firewall pass through
Details
10-31-2009
6.00
Added rigid fuel lines
Details
10-25-2009
6.00
Installed gascolator and fuel pumps
Details
10-21-2009
1.50
Installed rear housing and gold oil system
Details
10-10-2009
2.00
Engine Rear Housing Installed and Removed
Details
01-18-2009
0.00
Corvair College 13 and my new engine
Details
12-13-2007
1.50
Made first set of braided fuel lines
Details
02-24-2007
0.00
Received Corvair engine mount
Details
08-14-2006
2.00
Cleaned and stored engine parts
Details
08-12-2006
6.00
Disassembled and partially cleaned Corvair engine
Details
08-01-2006
0.00
Pickup Corvair engine
Details
07-27-2006
0.00
Found Corvair engine
Details
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
Category
# Logs
# Hours
All
1084
3152
Avionics
77
284
Empennage
93
231
Engine
87
293
Fuselage
306
915
Miscellaneous
132
294
None
2
Planning
22
21
Shop Supplies
1
2
Tools
22
4
Total Hours
32
Wings
296
1103