Date
|
Hours
|
Work Log Summary
|
Details
|
11-23-2009
|
3.50
|
Landing and taxi light connectors added
|
Details
|
|
|
11-22-2009
|
6.75
|
Flap & elavator tab safetying....
|
Details
|
|
|
10-21-2009
|
1.75
|
Wing tip fairings painted
|
Details
|
|
|
10-20-2009
|
3.00
|
Wing tip fairing primer and UV blocker applied
|
Details
|
|
|
10-19-2009
|
2.00
|
Primed wing tip fairings
|
Details
|
|
|
10-18-2009
|
1.50
|
Wing fairing paint preparation
|
Details
|
|
|
10-05-2009
|
3.00
|
Ailerons and flaps painted
|
Details
|
|
|
10-04-2009
|
3.25
|
Flap and aileron priming...
|
Details
|
|
|
09-21-2009
|
6.50
|
Wing painting & engine air intake work
|
Details
|
|
|
08-26-2009
|
1.50
|
Left and right navigation light installation
|
Details
|
|
|
02-06-2009
|
6.50
|
Wing tip fairing completion
|
Details
|
|
|
04-23-2008
|
1.50
|
Riveted aileron up stops
|
Details
|
|
|
04-16-2008
|
3.50
|
Wing tip fairing, canopy and wing to body fairing
|
Details
|
|
|
04-15-2008
|
4.00
|
Wing to body fairing...
|
Details
|
|
|
04-14-2008
|
6.75
|
Wing tip fairing fitting
|
Details
|
|
|
04-12-2008
|
0.75
|
Wing tip fairing fitting
|
Details
|
|
|
04-11-2008
|
2.25
|
Wing tip fairing fitting
|
Details
|
|
|
04-10-2008
|
1.75
|
Left wing tip fairing fitting
|
Details
|
|
|
04-08-2008
|
4.25
|
Right flap installation
|
Details
|
|
|
04-07-2008
|
5.00
|
Aileron and flap installation
|
Details
|
|
|
04-06-2008
|
7.00
|
Aileron installation and rigging
|
Details
|
|
|
11-24-2007
|
8.25
|
Wing lower skin riveting
|
Details
|
|
|
11-17-2007
|
5.25
|
Right wing lower skin riveting
|
Details
|
|
|
03-11-2007
|
1.00
|
Riveted on flap braces
|
Details
|
|
|
03-05-2007
|
2.00
|
Aileron rigging
|
Details
|
|
|
03-03-2007
|
10.50
|
Control tubes, left wing skin and aileron riveting
|
Details
|
|
|
03-02-2007
|
4.00
|
Aileron push tube construction
|
Details
|
|
|
02-28-2007
|
1.75
|
Cut and drilled aileron control rods
|
Details
|
|
|
02-27-2007
|
1.25
|
Right aileron hinge bracket and gap fairing riveti
|
Details
|
|
|
02-26-2007
|
1.50
|
Clecoe on left wing upper skins
|
Details
|
|
|
02-25-2007
|
1.50
|
Riveted the left wing leading edge to the spar
|
Details
|
|
|
02-25-2007
|
3.00
|
Left and right aileron assembling
|
Details
|
|
|
02-24-2007
|
4.00
|
Left wing leading edge riveting
|
Details
|
|
|
02-23-2007
|
7.00
|
Left wing skin preparation
|
Details
|
|
|
02-22-2007
|
5.75
|
Flap brace and aileron fairing preparation
|
Details
|
|
|
02-22-2007
|
3.50
|
Cleaning, abrading and alodining
|
Details
|
|
|
02-17-2007
|
3.00
|
Closing the left wing tank
|
Details
|
|
|
02-16-2007
|
3.50
|
Left wing leading edge deburring
|
Details
|
|
|
02-15-2007
|
6.50
|
Left wing leading end finishing
|
Details
|
|
|
02-14-2007
|
6.25
|
Left wing skin debur, edge finish and dimple
|
Details
|
|
|
02-09-2007
|
5.75
|
Installed right fuel tank, removed left wing skins
|
Details
|
|
|
02-08-2007
|
4.00
|
Right wing tank sealing and left lower skin
|
Details
|
|
|
02-07-2007
|
1.75
|
Left wing tank sealing
|
Details
|
|
|
02-07-2007
|
2.00
|
Left wing tank fuel quantity indication installati
|
Details
|
|
|
02-06-2007
|
1.50
|
Left wing tank sealing
|
Details
|
|
|
02-03-2007
|
5.25
|
Left wing tank sealing and riveting
|
Details
|
|
|
01-27-2007
|
4.25
|
Left wing tank preparation
|
Details
|
|
|
01-26-2007
|
4.50
|
Left wing tank preparation
|
Details
|
|
|
01-25-2007
|
6.25
|
Left wing tank preparation
|
Details
|
|
|
01-06-2007
|
5.75
|
Left wing tank match drilling and deburring
|
Details
|
|
|
01-05-2007
|
4.00
|
Left wing tank Z bracket preparation
|
Details
|
|
|
01-04-2007
|
2.00
|
Left wing leading edge to fuel tank joint plate
|
Details
|
|
|
01-03-2007
|
2.00
|
Match drilled left wing leading edge
|
Details
|
|
|
01-02-2007
|
1.00
|
Clecoed left leading edge and left top skin
|
Details
|
|
|
01-01-2007
|
1.75
|
Rivet left wing rear spar
|
Details
|
|
|
12-31-2006
|
5.25
|
Right wing upper skin riveting
|
Details
|
|
|
12-30-2006
|
4.50
|
Finished sealing of right wing tank
|
Details
|
|
|
12-29-2006
|
2.00
|
Aileron component dimpling
|
Details
|
|
|
12-28-2006
|
1.75
|
Aileron component deburring and edge finishing
|
Details
|
|
|
12-27-2006
|
2.00
|
Aileron skin match drilling
|
Details
|
|
|
12-26-2006
|
2.25
|
Aileron assembly
|
Details
|
|
|
12-25-2006
|
2.00
|
Aileron Spar preparation
|
Details
|
|
|
12-21-2006
|
5.75
|
Started on the ailerons
|
Details
|
|
|
12-20-2006
|
2.50
|
Reriveted leading edge rib flanges
|
Details
|
|
|
12-19-2006
|
1.50
|
Right wing tank sealing
|
Details
|
|
|
12-15-2006
|
2.75
|
Right wing tank sealing
|
Details
|
|
|
12-14-2006
|
2.50
|
Right tank sealing
|
Details
|
|
|
12-11-2006
|
1.25
|
Cleco cleaning and fuel access panel drilling
|
Details
|
|
|
12-09-2006
|
5.00
|
Right wing fuel tank work
|
Details
|
|
|
12-08-2006
|
2.50
|
Right wing tank preparations
|
Details
|
|
|
12-07-2006
|
2.00
|
Landing light installation
|
Details
|
|
|
12-06-2006
|
2.00
|
Right wing landing light
|
Details
|
|
|
12-05-2006
|
2.00
|
Landing light installation
|
Details
|
|
|
12-03-2006
|
2.00
|
Making a manometer
|
Details
|
|
|
12-02-2006
|
8.00
|
Right wing tank sealing
|
Details
|
|
|
12-01-2006
|
3.50
|
Riveting
|
Details
|
|
|
11-30-2006
|
1.25
|
Riveting
|
Details
|
|
|
11-29-2006
|
1.75
|
Riveting
|
Details
|
|
|
11-28-2006
|
1.75
|
Flap assembling and riveting
|
Details
|
|
|
11-27-2006
|
2.50
|
Priming flap compontents, flap assembly fixture
|
Details
|
|
|
11-26-2006
|
4.00
|
Cleaning, abrading and alodining
|
Details
|
|
|
11-23-2006
|
1.75
|
Countersinking and dimpling
|
Details
|
|
|
11-22-2006
|
1.75
|
Deburring and edge finishing
|
Details
|
|
|
11-21-2006
|
1.00
|
Deburring left flap components
|
Details
|
|
|
11-20-2006
|
1.25
|
Flap actuation input rod attach plate and angle
|
Details
|
|
|
11-18-2006
|
9.50
|
Rivet leading edge, build flaps
|
Details
|
|
|
11-17-2006
|
3.50
|
Dimpling of right aft spar, nut plates and rivetin
|
Details
|
|
|
11-16-2006
|
2.25
|
Priming right wing parts
|
Details
|
|
|
11-15-2006
|
3.00
|
Cleaning, abrading and alodining.
|
Details
|
|
|
11-14-2006
|
1.50
|
Deburring and countersinking
|
Details
|
|
|
11-13-2006
|
1.00
|
Edge finishing and dimpling
|
Details
|
|
|
11-12-2006
|
1.25
|
Deburring
|
Details
|
|
|
11-11-2006
|
2.50
|
Deburring, edge finishing and dimpling
|
Details
|
|
|
11-10-2006
|
2.00
|
Deburring, edge finishing and dimpling
|
Details
|
|
|
11-09-2006
|
2.25
|
Deburring, dimpling and edge finishing
|
Details
|
|
|
11-08-2006
|
1.50
|
Dimpling right wing tank skin and skin stiffeners
|
Details
|
|
|
11-07-2006
|
2.00
|
Right tank deburring edge finishing
|
Details
|
|
|
11-06-2006
|
1.00
|
Tank drain, pitot tube opening and rib engraving
|
Details
|
|
|
11-05-2006
|
2.25
|
Right fuel tank access and filler neck
|
Details
|
|
|
11-04-2006
|
2.50
|
Tank inboard rib bracket and fuel quantity capacit
|
Details
|
|
|
11-04-2006
|
2.50
|
Right wing tank installation
|
Details
|
|
|
11-03-2006
|
1.00
|
Right tank inboard forward attach bracket
|
Details
|
|
|
10-28-2006
|
3.25
|
Right wing tank preperations
|
Details
|
|
|
10-27-2006
|
2.00
|
Z bracket edge finishing and tank skin stiffeners
|
Details
|
|
|
10-26-2006
|
1.75
|
Right fuel tank attachments
|
Details
|
|
|
10-25-2006
|
5.00
|
Match drilling right leading and fuel tank
|
Details
|
|
|
10-24-2006
|
6.00
|
Right wing skin match drilling
|
Details
|
|
|
10-18-2006
|
2.50
|
Right wing upper skin installation
|
Details
|
|
|
10-17-2006
|
0.75
|
Right wing spar sag removal
|
Details
|
|
|
10-16-2006
|
1.00
|
Replaced bad rivet on aft spar
|
Details
|
|
|
10-14-2006
|
8.00
|
Right wing main rib riveting
|
Details
|
|
|
10-13-2006
|
2.25
|
Wing assembly fixture work
|
Details
|
|
|
10-13-2006
|
1.00
|
Left wing aft spar doubler riveting
|
Details
|
|
|
10-12-2006
|
4.00
|
Left wing rib, aft spar priming, plus...
|
Details
|
|
|
10-11-2006
|
3.50
|
Left wing rib and aft spar cleaning, abrading and
|
Details
|
|
|
10-10-2006
|
1.50
|
Aft spar doubler riveting
|
Details
|
|
|
10-09-2006
|
2.00
|
Right wing rib and spar priming
|
Details
|
|
|
10-08-2006
|
3.50
|
Right wing rib anti-corrosion treatment
|
Details
|
|
|
10-07-2006
|
4.25
|
Deburring wing rib flange holes
|
Details
|
|
|
10-07-2006
|
2.50
|
Deburring right wing rib to spar attaching holes
|
Details
|
|
|
10-06-2006
|
5.50
|
Wing rib flange fluting and straightening
|
Details
|
|
|
09-29-2006
|
3.50
|
Wing rib flange edge finishing
|
Details
|
|
|
09-25-2006
|
1.00
|
Wing rib relief notch edge finishing
|
Details
|
|
|
09-24-2006
|
2.00
|
Wing rib edge finishing
|
Details
|
|
|
09-22-2006
|
3.00
|
Wing rib lightening hole and flange edge finishing
|
Details
|
|
|
09-21-2006
|
1.00
|
Wing rib edge finishing
|
Details
|
|
|
09-20-2006
|
1.00
|
Edge finishing of wing ribs and aileron hinge brac
|
Details
|
|
|
09-16-2006
|
2.25
|
Wing Tie Down and Elevator Bellcrank Installation
|
Details
|
|
|
09-16-2006
|
1.00
|
Flap Brace Preparation
|
Details
|
|
|
09-16-2006
|
6.25
|
Aft Spar Preparation
|
Details
|
|
|
09-15-2006
|
7.50
|
Main Spar Preparation
|
Details
|
|
|
09-14-2006
|
5.00
|
Wing Spar Flange Anchor Nut Installation
|
Details
|
|
|
09-13-2006
|
3.25
|
Main Spar Flange Anchor Nut installation
|
Details
|
|
|
09-12-2006
|
2.00
|
Wing Main Spar Flange preparation
|
Details
|
|
|
09-07-2006
|
0.50
|
Completing wing kit inventory
|
Details
|
|
|
09-06-2006
|
1.50
|
Carry out inventory
|
Details
|
|
|
09-05-2006
|
3.00
|
Wing kit arrives
|
Details
|
|
|
09-01-2006
|
0.00
|
ABF Freight Sytems and CCRA visit
|
Details
|
|
|
08-31-2006
|
0.00
|
ABF Freight Systems called
|
Details
|
|
|
08-29-2006
|
0.00
|
Letter from Van's
|
Details
|
|
|
08-07-2006
|
0.00
|
Letter from Van's
|
Details
|
|
|
07-10-2006
|
0.00
|
Wing Kit order faxed to Vans
|
Details
|
|