KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 22
Category Work Time: 27 Hours
 Date
Hours
Work Log Summary

Details

 07-25-2014
2.00
Attached the Propeller to the Engine
Details

 06-19-2014
0.25
PSRU Spline Removal From Flywheel Pilot Bearing
Details

 02-08-2014
0.00
Results of Newsgroups Opinions About Gear Chatter
Details

 02-08-2014
2.00
Had the Propeller Dynamically Balanced
Details
       

 02-07-2014
1.00
Adjusted the Max and Min Propeller PRM
Details
     

 01-26-2014
1.00
Attempted to Adjust the Maximum Propeller Speed
Details

 01-18-2014
1.00
Started Engine and Tested Propeller
Details
       

 01-15-2014
1.00
Received the Prop Controller Loaner
Details

 01-11-2014
2.00
Changed the Prop Controller Connector Wiriing
Details
     

 01-10-2014
2.00
Tested the Propeller Motor
Details
       

 01-06-2014
0.00
Talked to MT Propeller USA Electric Prop Guru
Details

 12-26-2013
1.00
Checked the Propeller Wiring and Voltages
Details

 12-23-2013
0.00
Called MT Propeller USA
Details

 12-22-2013
0.00
Installed the MT Propeller 4
Details

 12-22-2013
0.00
Installed the MT Propeller 3
Details
       

 12-22-2013
0.00
Installed the MT Propeller 2
Details
       

 12-22-2013
5.00
Installed the MT Propeller
Details
       

 10-16-2013
1.00
Installed MT Propeller Brushes and Mount
Details
       

 08-22-2011
1.50
Soldered an Extension on the Prop Motor Cable
Details

 08-21-2011
4.00
Built the Prop Contoller Harness
Details
       

 08-20-2011
1.00
Ran Power Wire to the Prop Controller
Details
     

 08-12-2006
1.50
Service bulletin SB 06-2-23 compliance left tank
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.