Powered By Kitlog Pro v2.0
George Henson's Web Site
RV-10
Empennage
Work Logs Found:
28
Category Work Time:
109 Hours
Date
Hours
Work Log Summary
Details
08-05-2007
3.00
Tail light wiring
Details
07-29-2007
2.00
Empennage Gap Covers
Details
07-22-2007
2.00
Horizontal Stab Fairing
Details
07-15-2007
2.00
Horizontal Stab Fairing
Details
07-08-2007
2.00
Horizontal Stab Fairing
Details
07-01-2007
2.00
Horizontal Stab Fairing
Details
06-24-2007
2.00
Horizontal and Vertical Stab Fairing
Details
06-17-2007
2.00
Horizontal Stab Fairing
Details
06-10-2007
4.00
Horizontal and Vertical Stab Fairings
Details
05-27-2007
2.00
Horizontal Stab Fairing
Details
05-20-2007
2.00
Horizontal Stab Tip Fairing
Details
05-13-2007
8.00
Empennage Fairings
Details
05-03-2007
4.00
Control Surfaces Leading Edges
Details
05-02-2007
8.00
Horizontal Stab and Vertical Stab Attach
Details
04-29-2007
6.00
AN Fasteners and VS Fairing
Details
04-26-2007
6.00
Riveting Trim Servo Parts
Details
04-22-2007
5.00
Primed Trim Servo parts
Details
04-20-2007
6.00
Trim Servo Bracket
Details
04-04-2007
2.00
Empennage Fairings
Details
04-01-2007
4.00
Empennage Attach
Details
03-11-2007
6.00
Elevator and Tailcone Priming
Details
02-11-2007
8.00
Elevator and Tailcone Priming
Details
02-06-2007
1.00
Rudder Fairing
Details
10-22-2006
2.00
Vertical Stab Fairing
Details
10-22-2006
3.00
Rudder Fairings
Details
10-15-2006
5.00
Horizontal Stab
Details
10-01-2006
6.00
PreKote and Priming
Details
08-23-2006
4.00
Empennage/Tail Cone Kit Arrives
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
383
2014
Avionics
1
6
Elevators
33
139
Empennage
28
109
Exterior Finnishing
2
12
Fuselage
114
728
Horizontal Stab
26
90
Inspections
1
8
Instrument Panel
4
30
Rudder
17
50
Tailcone
31
132
Vertical Stab
21
59
Wings
105
651
Copyright © 2001-2024 Matronics. All Rights Reserved.