Date
|
Hours
|
Work Log Summary
|
Details
|
04-21-2009
|
0.00
|
Fuselage Finished.....for now!
|
Details
|
|
|
03-19-2009
|
4.00
|
Prep & Prime
|
Details
|
|
|
03-18-2009
|
3.00
|
Cabin Lights and side panels.
|
Details
|
|
|
03-17-2009
|
3.00
|
Deburring & dimpling front deck
|
Details
|
|
|
03-14-2009
|
4.00
|
Brakes and rudder pedals
|
Details
|
|
|
03-13-2009
|
3.00
|
Front deck center rib, fuel pump & valve connectio
|
Details
|
|
|
03-12-2009
|
2.00
|
Front Deck & Fuel Lines
|
Details
|
|
|
03-11-2009
|
4.00
|
Front Deck Stuff
|
Details
|
|
|
03-10-2009
|
5.00
|
Brake Lines & Front Deck
|
Details
|
|
|
03-09-2009
|
3.00
|
More Cabin Plumbing...
|
Details
|
|
|
03-07-2009
|
4.00
|
Pushrod, rudder cables, Electric flaps....
|
Details
|
|
|
03-06-2009
|
5.00
|
Static Lines & Fuel Vent Lines
|
Details
|
|
|
03-05-2009
|
5.00
|
Crotch Strap Kit
|
Details
|
|
|
03-03-2009
|
6.00
|
Prepped and painted interior of fuselage....
|
Details
|
|
|
03-01-2009
|
3.00
|
Finished cabin frame
|
Details
|
|
|
02-28-2009
|
6.00
|
Cabin Frame installation
|
Details
|
|
|
02-27-2009
|
8.00
|
Tip Up Cabin Frame...
|
Details
|
|
|
02-25-2009
|
6.00
|
Tip -Up cabin Frame
|
Details
|
|
|
02-24-2009
|
7.00
|
Air vents, Tip up cabin frame...
|
Details
|
|
|
02-21-2009
|
8.00
|
Interior Preping & Painting
|
Details
|
|
|
02-17-2009
|
3.00
|
Tip up cabin Frame, Interior paint selection/resea
|
Details
|
|
|
02-15-2009
|
4.00
|
Control Sticks, Front deck.
|
Details
|
|
|
02-14-2009
|
8.00
|
Rotating Fuselage Stand & Control Sticks
|
Details
|
|
|
02-13-2009
|
4.00
|
Getting ready to mount wings....
|
Details
|
|
|
02-12-2009
|
4.00
|
Static ports, Rudder Cable Fairing, & Filed down
|
Details
|
|
|
02-10-2009
|
5.00
|
Landing Gear Mount, Interior Panels
|
Details
|
|
|
02-08-2009
|
8.00
|
Electric Flaps & Landing Gear Mounts
|
Details
|
|
|
02-07-2009
|
4.00
|
First Time Sitting In Juliette Whiskey!!
|
Details
|
|
|
02-06-2009
|
9.00
|
Riveted Steps, Baggage Floors, Conduit for wiring.
|
Details
|
|
|
02-05-2009
|
7.00
|
Rails, Seats, Steps....
|
Details
|
|
|
02-04-2009
|
6.00
|
Aft Deck, Side Rails, Gussets....
|
Details
|
|
|
02-03-2009
|
4.00
|
Primed Parts
|
Details
|
|
|
02-02-2009
|
4.00
|
Prep parts for priming...
|
Details
|
|
|
01-24-2009
|
5.00
|
More Deburring & Dimpling.......
|
Details
|
|
|
01-22-2009
|
9.00
|
Deburr & Dimple......
|
Details
|
|
|
01-19-2009
|
4.00
|
Baggage Skins
|
Details
|
|
|
01-17-2009
|
4.00
|
Deburring & Dimpling top Skins
|
Details
|
|
|
01-16-2009
|
7.00
|
Disassembly & Begin Deburring & Dimpling
|
Details
|
|
|
01-15-2009
|
6.00
|
Electric Flaps and Misc.
|
Details
|
|
|
01-14-2009
|
2.00
|
Electric Flaps
|
Details
|
|
|
12-30-2008
|
6.00
|
Right Seat Back & Cabin forward covers....
|
Details
|
|
|
12-24-2008
|
5.00
|
Foward seat covers, control rod tunnel and seat ba
|
Details
|
|
|
12-22-2008
|
3.00
|
Seats floor covers
|
Details
|
|
|
12-20-2008
|
6.00
|
Left Step, Baggage Bulkhead
|
Details
|
|
|
12-15-2008
|
5.00
|
Match drillled top skins, began steps
|
Details
|
|
|
12-14-2008
|
6.00
|
Finished Riveting skins and fitted details and top
|
Details
|
|
|
12-13-2008
|
2.00
|
Jumped Ahead....
|
Details
|
|
|
12-11-2008
|
3.50
|
Riveted bottoms and lower sides
|
Details
|
|
|
12-10-2008
|
1.00
|
Bolts on Longeron...
|
Details
|
|
|
12-08-2008
|
4.50
|
Riveting the Side Skins.....
|
Details
|
|
|
12-07-2008
|
9.00
|
Prime, Nutplates, Re-assemble Fuselage
|
Details
|
|
|
12-06-2008
|
3.00
|
Arm rest modification
|
Details
|
|
|
12-05-2008
|
2.50
|
More dimple & deburring....
|
Details
|
|
|
12-04-2008
|
6.00
|
More of the same......
|
Details
|
|
|
12-03-2008
|
6.00
|
Dimple & Deburr....
|
Details
|
|
|
12-02-2008
|
6.50
|
Deburr, Dimple...Rinse, Repeat....
|
Details
|
|
|
12-01-2008
|
7.00
|
Break down fuselage, finish list of items and begi
|
Details
|
|
|
11-29-2008
|
3.00
|
Redo Gear Attach Webs and Angles
|
Details
|
|
|
11-28-2008
|
1.00
|
Match Drilled holes
|
Details
|
|
|
11-24-2008
|
2.00
|
Rivet brake pedals
|
Details
|
|
|
11-23-2008
|
0.00
|
Research.....
|
Details
|
|
|
11-22-2008
|
7.00
|
Rudder & Brake Pedals, Floor Stiffeners and Baggag
|
Details
|
|
|
11-21-2008
|
6.00
|
Gussets, Forward bulkheads, Gear attach web
|
Details
|
|
|
11-20-2008
|
8.50
|
Attach Firewall, Adding Forward Fuselage
|
Details
|
|
|
11-19-2008
|
6.00
|
Finished riveting and Joined rear and center fusel
|
Details
|
|
|
11-18-2008
|
2.00
|
Twist Longeron, trim & cut slots
|
Details
|
|
|
11-17-2008
|
7.50
|
Rivet center section bottom skin, tail bottom skin
|
Details
|
|
|
11-16-2008
|
7.50
|
Riveting center section
|
Details
|
|
|
11-15-2008
|
9.00
|
Deburr, dimple, & prep and prime center section...
|
Details
|
|
|
11-14-2008
|
6.00
|
Dismantle center section & begin deburring
|
Details
|
|
|
11-13-2008
|
6.50
|
Rivet Aft Fuselage, Match Drill Center Section
|
Details
|
|
|
11-12-2008
|
4.00
|
Bottom Skins, Tail Tie Down, & Rivet Aft Fuselage
|
Details
|
|
|
11-11-2008
|
9.00
|
Aft Fulselage Priming & Final Assembly & Center F
|
Details
|
|
|
11-10-2008
|
8.50
|
Dis-assemble Aft Fuselage, Deburr & Remove blue pl
|
Details
|
|
|
11-09-2008
|
8.00
|
Aft fuselage match hole drilling & J-Channels
|
Details
|
|
|
11-09-2008
|
4.00
|
Aft Fuselage Assembly and Final Bulkhead Assemb
|
Details
|
|
|
11-08-2008
|
6.50
|
Bulkhead & Firewall Final Assembly
|
Details
|
|
|
11-07-2008
|
2.00
|
Priming
|
Details
|
|
|
11-07-2008
|
5.50
|
Finished Deburring, scotch brite pads, Acetone, &
|
Details
|
|
|
11-06-2008
|
2.50
|
Deburring.....
|
Details
|
|
|
11-05-2008
|
3.00
|
Deburr, Deburr, & more Deburring.....
|
Details
|
|
|
10-30-2008
|
7.50
|
Deburring, Dimpling, & countersinking bulkhead par
|
Details
|
|
|
10-29-2008
|
4.00
|
F-711 Bulkhead
|
Details
|
|
|
10-28-2008
|
7.00
|
F706 Bulkhead and Bellcrank Support Ribs, F-707, F
|
Details
|
|
|
10-27-2008
|
7.00
|
F-705 Bulkhead
|
Details
|
|
|
10-26-2008
|
10.00
|
Bulkheads F-904 & F-705
|
Details
|
|
|
10-25-2008
|
8.00
|
Firewall and F-904 Bulkhead
|
Details
|
|
|
10-24-2008
|
11.00
|
Finished Inventory.....Started Firewall
|
Details
|
|
|
10-23-2008
|
8.00
|
Fuselage Arrives!!
|
Details
|
|
|
10-17-2008
|
0.00
|
FUGELAGE IS COMING!!
|
Details
|
|
|
08-12-2008
|
0.00
|
15 Months Since I finished the Wings!!
|
Details
|
|