KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 314
Category Work Time: 757 Hours
 Date
Hours
Work Log Summary

Details

 06-12-2022
0.00
Constructed a Wing Tank Cradle
Details

 06-10-2022
0.00
Removed the RV-8A Left Fuel Tank
Details

 04-27-2014
1.00
Installed Wing Fuselage Gap Channel Seal
Details
       

 03-10-2014
0.00
Bottom Wing Skin Dent from Jack
Details
       

 02-28-2014
1.00
Attached the Left Wing Tip Fairing
Details
       

 12-06-2013
4.00
Sanded the UV Smooth Prime on the Wing Tips
Details

 12-03-2013
1.00
Reinstalled Faps and Safety Wired the Hinge Pins
Details
     

 12-03-2013
0.00
Checked the Rigging of the Ailerons 2
Details
       

 12-03-2013
2.00
Checked the Rigging of the Ailerons
Details
       

 12-02-2013
2.50
Removed the Mechanical Aileron Stops
Details
     

 11-30-2013
2.00
Changed the Flaps' Connecting Rods To Avery's
Details
       

 11-27-2013
1.50
Installed Terminal Block on End of Each Wing
Details
       

 11-21-2013
0.50
Installed Rear Spar Bolts
Details
       

 11-10-2013
2.00
Installed Missing Bolts on Each Weldment
Details

 11-09-2013
8.00
My Plane Got Winged Today!!!
Details
       

 11-08-2013
8.00
Installed Four Close Tolerance Bolts in Each Wing
Details

 10-24-2013
2.00
The Boys Got the Left Wing Off
Details
     

 10-22-2013
3.00
Attempted to Attach the Left Wing
Details

 05-30-2012
2.00
Moved the Rt MX150L Connector and Patched Hole
Details
       

 05-23-2012
2.00
Wired the MX-150L 12 Position Socket Lt Fuselage
Details
       

 05-22-2012
1.00
Corrected Rt Wing MX-150L Electrical Connector
Details
     

 05-13-2011
2.50
Polished the Right Wing
Details

 10-07-2010
2.00
Spot Polished the Wings to Remove Corrosion
Details

 10-03-2010
1.50
Polished 0.5 of the light corrosion on Rt Wing
Details

 09-12-2010
1.00
Installed Nutplated for the Tip Lenses
Details
       

 09-12-2010
0.50
Added Nutplates to the Fuselage Tank Brackets
Details
       

 09-11-2010
3.00
Moved the Wings to the Hangar
Details
       

 09-10-2010
1.00
Riveted Under Wing NACA Vent to Right Wing
Details
       

 09-09-2010
1.00
Prosealed the Under Wing NACA Vent to Rt Wing
Details
       

 09-06-2010
2.00
Riveted Nutplates to the Rt Wing Inboard Edges
Details

 09-03-2010
2.00
Dimpled and Countersunk Top Skin Holes
Details
       

 09-02-2010
1.50
Drilled, Deburred & Dimpled Rt Wing Inboard Edge
Details
       

 09-01-2010
1.00
Re-Surface Converted the Left Flap
Details
       

 08-31-2010
2.00
Finished Installation of Rt Wing Fairing Nutplates
Details
       

 08-31-2010
1.00
Cut the Slot in the Rt Tank Attachment Bracket
Details
       

 08-30-2010
4.00
Drilled, Dimpled & Countersunk Rt Inboard Wing
Details
       

 08-28-2010
1.00
Removed the Left Wing Flap and Rolled the Edge
Details

 08-25-2010
2.50
Fit the Left Tip Lens
Details
       

 08-24-2010
1.50
Fitting the Right Tip Lens
Details
       

 08-24-2010
1.00
Fitted the Right Tip Lens
Details
       

 08-21-2010
0.00
View of 70 Degree Spacers on Rt. Tip Lights
Details
     

 08-17-2010
1.50
Finished the Installation of the Tip Nutplates
Details
     

 08-06-2010
2.50
Installed 2/3 of Nutplates on the Left Tip
Details
       

 08-05-2010
1.00
Installed the Archer VOR Antenna in Right Tip
Details
       

 08-05-2010
1.50
Installed half of the Right Tip Nutplates
Details

 08-03-2010
1.50
Fiberglass the Aft Inside of the Tips
Details
       

 08-03-2010
1.50
Countersunk the Left Tip Holes
Details

 08-02-2010
1.50
Countersunk Right Wing Tip Holes
Details
       

 07-20-2010
2.00
Removed the Wings from the Fuselage
Details
       

 07-19-2010
1.50
Drilled the Right Tip for Nutplate Installation
Details
       

 07-18-2010
1.00
Drilled the Left Tip for Nutplate Installation
Details

 07-17-2010
1.00
Drilled Right Wing Tip Attachment Hole to #26
Details
     

 07-16-2010
1.50
Cut the Right Tips Trailing Edge
Details
     

 07-15-2010
2.00
Matched Drilled Tip Edge Reinforcement Strips
Details
       

 07-14-2010
0.50
Remover Tape From the Tips' Exterior
Details
       

 07-13-2010
1.50
Re-Did the Tips Trailing Edges
Details
       

 07-12-2010
2.00
Cut and Epoxied the Tips Trailing Edges
Details
       

 07-09-2010
1.50
Drilled #26 Holes in the Tip for #6 Screws
Details

 06-27-2010
1.50
Fitted, Cut and Drilled Left Wing Tip
Details
       

 06-26-2010
2.00
Fitted, Drilled and Clecoed Right Wing Tip
Details
       

 06-22-2010
1.50
Final Drilled the Wing Fairing Holes to #19 Size
Details

 06-21-2010
3.00
Installed the Flap Fairings
Details
       

 06-21-2010
3.00
Finished Wing Fairings/Installed Flap Fairings
Details
       

 06-20-2010
4.00
Started Wing Fairing Fitting
Details
       

 06-02-2010
2.00
Aligned the Ailerons in Neutral Trail Position
Details
       

 06-01-2010
0.50
Surface Converted the Fuselage Tank Brackets
Details
       

 05-31-2010
1.00
Drilled 1/4" hole in Forward Tank Supports
Details

 05-30-2010
0.50
Match drilled the Fuselage Center Skins and Wing
Details
       

 05-30-2010
0.00
Attached Rt Forward Tank Support Brackets
Details
       

 05-30-2010
2.00
Attached Lt Forward Tank Support rtackets
Details
       

 05-29-2010
0.00
Drilled the Right Rear Spar
Details
       

 05-29-2010
2.00
Drilled the Left Rear Spar
Details
       

 05-29-2010
0.00
Drilled the Left Rear Spar
       

 05-28-2010
0.25
Re-measured the wings
Details

 05-26-2010
1.00
Re-measured the wing required for rear spar drilli
Details

 05-15-2010
0.25
Tip to Tail lengths were measured
Details
     

 05-15-2010
0.50
Set the wings' angle of incidence
Details
       

 05-15-2010
1.00
Connected the wings to the fuselage
Details
       

 05-15-2010
0.50
Checked the trueness of the wing
Details
     

 05-13-2010
0.50
Positioned the Wings on Saw Horses
Details
       

 09-13-2009
1.00
Preparing for temporary attachment of the wings
Details
       

 09-13-2009
0.50
Made a Drift pin for the wing attachment
Details
     

 05-13-2009
2.00
Re-screwed the Left Tank to the wing
Details

 12-26-2008
2.00
Riveted the flap hinges to the wings
Details
       

 11-29-2008
8.00
Closed Bottom Outer panels/Installed Heated Pitot
Details
       

 11-24-2008
0.50
Put male pins on wires for heated pitot connection
Details
       

 11-23-2008
1.00
Made molex connector for the heated pitot tube
Details
       

 11-21-2008
3.00
Closed Right Bottom Outbd wing skin panel
Details

 11-08-2008
3.00
Fixed the leading edge crack
Details
       

 10-25-2008
1.00
Bucking bar dropped into wing cracking leading edg
Details

 10-11-2008
3.00
Riveted 1/2 of Rt bottom outboard skin
Details

 01-01-2008
12.00
Riveted the bottom inboard skins
Details
       

 04-30-2007
3.00
Drilled, deburred, dimpled W-822 access plates
Details
       

 04-26-2007
3.00
Put bottom skins on wings and stowed fuseage parts
Details

 04-25-2007
3.00
Fabricated the anti-hangup tank access bracket
Details
       

 04-17-2007
2.00
Flared Pitot tube tubing and connected it
Details
       

 04-12-2007
2.00
Mounted the pitot tube circuit board
Details
       

 04-10-2007
2.00
Fit pitot tube to the mast
Details
       

 04-09-2007
2.50
Installed the AOA sensors
Details
       

 04-07-2007
0.50
Marked the wing for the AFS AOA
Details
       

 04-01-2007
1.00
Bent the pitot system tube into the mast
Details
       

 03-15-2007
2.50
Pitot tubing and conduit tubing installed
Details
       

 03-14-2007
0.50
Attached the Gretz pitot backing plate
Details
     

 03-11-2007
5.00
Started Gretz Pitot tube installation
Details
       

 03-11-2007
0.50
Opening pitot mast hole
Details
       

 02-25-2007
4.00
Attached the Rt flap
Details
       

 02-22-2007
2.00
Atached the Rt aileron push-pull tubes
Details
       

 02-21-2007
2.00
Left flap attached to the wing
Details
       

 02-19-2007
2.50
Tried fitting the Lt flap with wing in the cradle
Details

 02-18-2007
0.25
Put the Lt wing back in the cradle
Details

 02-17-2007
2.50
Can't attach Lt Flap because of edge distance
Details
       

 02-15-2007
2.50
Attached the Lt aileron to wing
Details
       

 02-14-2007
1.50
Attached the Lt W-816 Push/Pull tube to bellcrank
Details
       

 02-11-2007
2.50
Reemed the aileron bellcrank brass bushings
Details
       

 02-10-2007
2.00
Attached the rod ends to the push/pull tubes
Details
       

 02-07-2007
0.50
Primed the outside of the large tubes
Details

 02-07-2007
1.50
Cut the aileron push/pull tubes
Details
     

 02-04-2007
7.00
Finished the Rt flap
Details
     

 02-03-2007
7.00
Finished conversion and sealing of Rt flap parts
Details

 02-01-2007
3.00
Converted Rt flap parts
Details

 01-31-2007
1.00
Disassembled the right flap, deburred ribs and spa
Details

 01-27-2007
7.00
This finished the Left flap
Details
       

 01-26-2007
8.00
Riveted the Lt flap together
Details
       

 01-24-2007
1.00
Made V-cradle for the flap contruction
Details

 01-23-2007
2.00
Fabricated Rt FL406B, converted bracket pieces
Details
     

 01-22-2007
1.50
Dimpled the Lt Flap parts
Details

 01-21-2007
8.00
Surface converted the Lt Flap, deburred, dimpled
Details
     

 01-20-2007
1.00
Deburred left flap skeleton
Details

 01-19-2007
1.00
Drilled the Left FL406 A + B according to plans
Details
       

 01-18-2007
1.50
Re-cut FL406C pieces
Details

 01-17-2007
1.50
Fine shaped the FL406B and bent the 406A
Details

 01-14-2007
2.00
Started fabrication of FL 406 A+B+C
Details
       

 01-10-2007
3.00
Drilled flap top skins
Details

 01-06-2007
3.00
Drilled flap ribs/skins and attached/drilled hinge
Details
       

 01-04-2007
2.50
Started the flaps
Details
       

 01-04-2007
0.50
Drilled flap ribs
       

 01-01-2007
0.25
RTV used in the ailerons
Details
       

 01-01-2007
8.00
Finished the Ailerons
Details
       

 12-26-2006
3.50
Deburred/dimpled/converted aileron skins/ribs
Details

 12-23-2006
8.00
Converted/sealed aileron spars & A-408
Details
       

 12-22-2006
3.00
Drilled aileron spar re-inforcement plates & hinge
Details
       

 12-20-2006
2.50
Formed and drilled the A-408
Details

 12-17-2006
0.50
Bent the aileron skins
Details
       

 12-16-2006
4.00
Riveted stiffeners to aileron skin and sealed
Details
       

 12-14-2006
2.00
Dimpled aileron stiffeners and skins
Details
     

 12-11-2006
1.50
Surface converted the right aileron stiffeners
Details
     

 12-10-2006
9.00
Cut, drilled, and deburred aileron stiffeners/skin
Details
     

 12-09-2006
5.50
Riveted the flap braces and gap seals in place
Details
       

 12-08-2006
1.00
Dimpled the aileron gap seals and top skin attachm
Details

 12-07-2006
1.00
Dimpled the flap braces/countersunk the W-707 D
Details
     

 12-06-2006
3.00
Surface converted and seal braces and gap seals
Details

 12-05-2006
2.00
Deburred the flap braces and the aileron gap seals
Details

 12-04-2006
2.00
Fitted the aileron gap seal and flap braces
Details
       

 12-02-2006
4.00
Attached the aileron hinges to the rear spar
Details
       

 11-29-2006
2.25
Riveted the aileron hinges together
Details
       

 11-28-2006
3.50
Drilled the aileron hinges, surface converted them
Details
       

 11-25-2006
0.50
Wings placed in the wing cradle
Details
       

 11-25-2006
2.00
Riveted the top left outboard skin on
Details
       

 11-21-2006
0.50
Riveting the top inboard skins (Cont.)
Details
       

 11-21-2006
4.00
Riveted on the inboard top skins
Details
       

 11-19-2006
4.50
Attached the Lt tank and installed tie down loops
Details
       

 11-18-2006
3.00
Leak tested the right tank
Details
       

 11-16-2006
2.00
Repaired the right tank baffle leaks
Details
       

 11-14-2006
4.00
Checked the right tank for leaks
Details
       

 11-12-2006
3.50
Riveted the Leading Edges to the spars
Details
       

 11-08-2006
2.00
Riveted top rib holes to the spar; Clecoed LE to s
Details

 11-07-2006
1.00
Attached the right tank access plate
Details
       

 11-06-2006
4.00
Riveted the right tank baffle
Details

 11-05-2006
6.00
Sealed the right tank with the baffle panel
Details
       

 11-04-2006
6.00
Repaired the left tank leaks
Details
       

 11-04-2006
3.00
Pressure tested the left tank
Details
       

 11-03-2006
1.50
Sealed the left tank access plate
Details

 10-29-2006
1.00
Put foam strip on edge of Plexi lens
Details

 10-28-2006
7.00
Installed the right100W Halogen round taxi light
Details
       

 10-23-2006
3.00
Installed the Plexi lens on left light
Details
       

 10-17-2006
2.00
Mounted the HID Power supply on Left spar
Details
       

 10-17-2006
0.50
Installed HID Lamp and retainer bracket
Details
       

 10-14-2006
3.50
Cut LT LE for the Duckworks HID Landing Light
Details
       

 10-12-2006
4.00
Riveted the Right Leading edge together
Details
     

 10-11-2006
4.50
Riveted the Left leading edge together
Details

 10-10-2006
4.00
Scarf jointed the top skins; assembled Lt LE
Details
       

 10-08-2006
10.00
Sealed interior of surface converted skins
Details
     

 10-07-2006
5.00
Drilled the platenut holes for the Duckworks light
Details
     

 10-06-2006
0.50
Drilled the W-423 for the platenuts
Details
     

 10-04-2006
1.00
Cosmetic correction of black converted areas of sk
Details

 10-03-2006
2.00
Dimpled the skins
Details

 10-02-2006
1.50
Dimpled the skins
Details
     

 10-01-2006
9.00
Surface converted the wings' skins interior surfac
Details
     

 09-27-2006
2.00
Continued deburring skin holes

 09-25-2006
2.50
Remove vinyl from upper skins and deburred holes
Details
       

 09-19-2006
2.50
Dimpled the rear spar
Details
     

 09-18-2006
2.00
Dimpled the main ribs
Details
     

 09-17-2006
9.00
Readied the wing skeletons for the skins
Details
       

 09-16-2006
1.50
Deburred and dimpled LE ribs
Details
     

 09-14-2006
2.00
Dimpled the leading edge skins
Details
     

 09-13-2006
2.50
Deburred and surface converted leading edge skins
Details
       

 09-12-2006
1.00
Pulled the vinyl from the leading edge skins
Details

 09-10-2006
3.50
Riveted the Lt tank baffle and end attachment brac
Details

 09-09-2006
4.00
Installed the rear baffle of the left tank
Details
       

 09-08-2006
0.50
Checked the continuity of the fuel senders
Details

 09-07-2006
1.50
Prepped the left tank for closure
Details

 09-01-2006
2.00
Attached Lt tank outboard sender and vent line
Details
       

 08-30-2006
1.25
Installed the left tank fuel return line
Details
       

 08-30-2006
1.25
Fitted/installed Left tank vent line
Details
       

 08-29-2006
1.50
Installed the fuel return line in the right tank
Details
       

 08-29-2006
1.00
Attached right inboard sender plate
Details
       

 08-28-2006
0.75
Installed the right tank fuel return fitting
Details
       

 08-28-2006
0.75
Installed fuel return fitting in left fuel tank.
Details
       

 08-28-2006
1.50
Connected the terminals to the Rt inboard sender
Details
       

 08-27-2006
3.00
Installing capacitance fuel sender and fuel return
Details
       

 08-27-2006
0.50
Drilled the right tank fuel return hole
Details
     

 08-24-2006
3.00
Started the installation of the right capacitance
Details
       

 08-24-2006
0.25
SB 06-2-23 Safety wired the right tank fuel pickup
Details
       

 08-22-2006
2.00
Installed the vent line in the right tank
Details
       

 08-22-2006
0.50
Flared the vent line with the Parker flaring tool
Details
       

 08-22-2006
0.25
Drilled the fuel return line hole in the second ri
Details
       

 08-19-2006
2.00
Sealed the outboard tank rib machine hole
Details
       

 08-19-2006
2.00
Installed the T405 and two T-410s and sealed them
Details
       

 08-19-2006
4.00
Finished riveting ribs of right tank and sealing r
Details
       

 08-17-2006
3.00
Wet riveted half of the right tank
Details

 08-13-2006
0.50
Prosealed/riveted anti-rotation bracket right tank
Details
       

 08-13-2006
2.00
Installed anti-hangup bracket in the left tank
Details
       

 08-13-2006
6.00
Assembled the right tank and prosealed the ribs
Details
       

 08-12-2006
2.00
Installed T-405 & T-410 to left tank nose
Details
       

 08-09-2006
2.00
Finished riveting left tank ribs with pneumatic sq
Details

 08-08-2006
2.50
Wet riveted the 5 left tank bottom middle ribs
Details

 08-07-2006
2.50
Riveted left tank ribs x 5 one side
Details
       

 08-06-2006
5.00
Prosealed the left tank ribs and skin together
Details
       

 08-05-2006
3.00
Installed flop tube left tank then removed it for
Details
       

 08-03-2006
3.00
Drilled the outboard T-410 pieces and installed ri
Details
       

 08-02-2006
1.00
MEK cleaned inside of left tank getting ready to i
Details

 07-24-2006
0.00
To OSH for Airventure 2006 until 06Jul30

 07-23-2006
4.00
Finished riveting the stiffeners, filler flange an
Details
       

 07-22-2006
5.50
Finished riveting the right tank stiffeners, cap f
Details

 07-21-2006
4.00
Finished proseal attaching stiffeners, gas cap and
Details
       

 07-20-2006
3.00
Started ProSealing the stiffeners to the right tan
Details
       

 07-13-2006
1.00
Cleaned tank stiffener areas to be Prosealed
Details

 07-12-2006
2.50
Sanded the surfaces that will be ProSealed
Details
       

 07-09-2006
5.00
Finished deburring and dimpling all of the tank ri
Details
       

 07-08-2006
2.50
Deburred and started dimpling left tank ribs
Details

 07-06-2006
4.00
Deburred and dimpled the right tank skin
Details
       

 07-05-2006
1.00
Drilled drain valves to skins
Details
       

 07-05-2006
4.00
Deburred and dimpled the left tank skin
Details
       

 07-03-2006
3.00
Fuel cap preparation for attachment
Details
       

 07-02-2006
1.50
Riveted the Platenuts to the tank rings
Details
       

 07-02-2006
1.00
Fabricated the Fuel Pickup Anti-Rotation Bracket
Details
       

 07-02-2006
2.00
Drilled the T-407 and T-408 pieces
Details
       

 07-02-2006
0.50
Cut opening in the T-703 ribs for the inspection h
Details
     

 06-26-2006
1.50
Trimmed the sender plates
Details
       

 06-25-2006
3.50
Preparing to install Capacative Fuel Quantity Send
Details
       

 06-25-2006
3.50
Preparing to install Capacative Fuel Quantity Send
Details
       

 06-21-2006
1.00
Disassembled the left tank
Details

 06-19-2006
4.00
Match drilled the left tank holes and machine coun
Details
       

 06-18-2006
2.00
Fitted left tank skins onto the ribs
Details
       

 06-17-2006
3.50
Finished the T-405 pieces by Scotchbrite buffing t
Details
       

 06-14-2006
1.50
Fabricated the T-405 Tank Attachment Angles
Details
       

 06-12-2006
1.00
Drilled screw attachment holes on the right tank t
Details

 06-07-2006
4.00
Fit the right tank skin to the ribs, drilled all h
Details
     

 06-04-2006
3.00
Installed right tank ribs and drilled ribs, bracke
Details
       

 06-03-2006
2.00
Fit tank skins to the spar and baffle
Details
       

 06-03-2006
2.00
Cut tank skin stiffeners for both tanks and drille
Details
       

 05-31-2006
1.00
Studied the tank construction plans
Details

 05-27-2006
1.50
Riveted the three inboard platenuts onto the spars
Details

 05-26-2006
2.00
Riveted the platenuts onto the Z-Brackets
Details
     

 05-26-2006
1.50
Attached the Z-brackets to the spars
Details
     

 05-25-2006
1.50
Drilled Platenut holes on the the Z-brackets
Details
       

 05-23-2006
1.50
Match hole drilled the Z-brackets
Details
     

 05-22-2006
0.50
Cleco attached the Z-brackets to the main spar aft
Details
     

 05-21-2006
3.00
Cut, drilled and deburred the tank attachment Z-br
Details
       

 05-20-2006
4.00
Fitted the skins to the left leading edge
Details
       

 05-19-2006
4.00
Fitted the right leading edge skins
Details
       

 05-15-2006
1.00
Sealed the leading edge nose ribs
Details

 05-12-2006
1.00
Finished drilling skins on the bottom of the left
Details

 05-10-2006
1.00
Matched hole drilled the left bottom skins after a
Details
     

 05-08-2006
2.00
Match hole drilled the skin holes on the right win
Details
     

 05-07-2006
1.00
Attached the bottom skins to the wings
Details

 05-04-2006
5.00
Fitted the top skins to the wing after studying pl
Details
       

 05-03-2006
1.00
Drilled the wing doublers
Details
     

 04-30-2006
4.00
Constructed the tank jig and the dimpler table
Details
       

 04-29-2006
1.00
Studied the plans
Details

 04-27-2006
2.00
Studied the plans
Details

 04-25-2006
2.00
Adjusted the outboard jig clearances
Details

 04-22-2006
6.00
Riveted the right wing and hung it on the jig
Details
       

 04-19-2006
4.00
Match drilled, deburred the right main ribs and sp
Details
       

 04-18-2006
3.00
Assembled the right wing main ribs and spars
Details
       

 04-16-2006
3.00
Riveted the left main ribs to the main spar
Details
       

 04-14-2006
2.00
Riveted the left main ribs to the rear spar
Details
       

 04-13-2006
4.50
Drilled, deburred the left wing main ribs
Details

 04-12-2006
2.00
Assembled the left main ribs and spar together
Details
       

 04-03-2006
2.00
Cut nuts off with Dremel tool; ordered new hardwar

 04-02-2006
1.00
Stripped the tie down attachment nuts
Details

 04-01-2006
2.50
Sealed and assembled the right rear spar

 03-31-2006
3.50
Sealed and assembled the left rear spar
       

 03-30-2006
1.50
Tank rib conversion of outer surfaces

 03-28-2006
1.50
Finished right inboard and outboard ribs

 03-27-2006
2.50
Right rib treatments

 03-26-2006
3.50
Right ribs converted

 03-25-2006
3.50
Inboard and outboard right ribs converted

 03-23-2006
3.50
ConversionTreatment of the left wing ribs
       

 03-21-2006
2.00
Treated the left rear spar

 03-19-2006
3.00
Treated the left rear spar parts
     

 03-18-2006
4.50
Sanchem treated the right rear spar
       

 03-15-2006
2.50
Drilled the rib conduit holes
       

 03-14-2006
2.00
Studied conduit construction

 03-12-2006
5.00
Finished wing jig instillation
       

 03-10-2006
2.50
Finished holes in the W-709, W-711 & W-712
       

 03-09-2006
2.00
Rib deburring
       

 03-08-2006
2.00
Edge deburred ribs W-711

 03-06-2006
1.50
Edge deburred part of W-711 left and right

 03-05-2006
4.50
Fluted the ribs and deburred W-709, W-711 & W-712
       

 03-01-2006
5.00
Clecoed, drilled, deburred the right rear spar par
Details
       

 02-28-2006
2.00
Studied instructions; Drilled attached left W-707

 02-11-2006
3.00
Deburred the tank ribs

 12-19-2005
3.00
Wing Shipment Inventory
       










Copyright © 2001-2024 Matronics. All Rights Reserved.