Date
|
Hours
|
Work Log Summary
|
Details
|
01-14-2012
|
4.00
|
Mounted wing tip lens hardware
|
Details
|
|
|
01-14-2012
|
3.00
|
Finished wings
|
Details
|
|
|
01-08-2012
|
2.00
|
Rivetted rear wing tip ribs
|
Details
|
|
|
01-07-2012
|
4.00
|
Fabricated right wing tip support baffles
|
Details
|
|
|
01-07-2012
|
3.00
|
Cut and trimmed wing tip lenses
|
Details
|
|
|
01-01-2012
|
2.00
|
Fabricated spacers for wing tips
|
Details
|
|
|
01-01-2012
|
4.00
|
Fabricated left wing tip support baffles
|
Details
|
|
|
12-31-2011
|
2.00
|
Secured wing tip hinge pins
|
Details
|
|
|
12-31-2011
|
4.00
|
Rivetted left wing tip hinge to wing tip
|
Details
|
|
|
12-29-2011
|
6.00
|
Rivetted right wing tip hinge to wing tip
|
Details
|
|
|
12-17-2011
|
4.00
|
Mounted wing tip antenna and lights
|
Details
|
|
|
12-16-2011
|
2.00
|
Mounted rear left wing tip rib
|
Details
|
|
|
12-15-2011
|
3.00
|
Drilled holes to mount left wing tip
|
Details
|
|
|
12-11-2011
|
4.00
|
Mounted left wing tip hinges and fitted wing tip
|
Details
|
|
|
12-10-2011
|
4.00
|
Drilled holes to mount right wing tip
|
Details
|
|
|
12-09-2011
|
3.00
|
Fitted right wing tip to wing
|
Details
|
|
|
12-08-2011
|
5.00
|
Mounted wing tip hinges on right wing
|
Details
|
|
|
12-04-2011
|
5.00
|
Rivetted left wing bottom skin
|
Details
|
|
|
12-04-2011
|
4.00
|
Rivetted joint fairing nut plates on left wing
|
Details
|
|
|
12-03-2011
|
3.00
|
Wired left lights, OAT, and antenna
|
Details
|
|
|
12-03-2011
|
2.00
|
Coupled pitot and aoa lines to pitot tube
|
Details
|
|
|
12-01-2011
|
3.00
|
Mounted pitot controller
|
Details
|
|
|
11-29-2011
|
3.00
|
Installed Dynon pitot in left wing
|
Details
|
|
|
11-26-2011
|
4.00
|
Wired right wing lights, antenna, fuel sensor
|
Details
|
|
|
11-26-2011
|
5.00
|
Installed OAT, rivetted lower right wing skin
|
Details
|
|
|
11-25-2011
|
4.00
|
Wired right wing roll servo
|
Details
|
|
|
11-25-2011
|
3.00
|
Wired right wing roll servo
|
Details
|
|
|
01-06-2008
|
4.00
|
Finished wing root fairings
|
Details
|
|
|
11-02-2007
|
1.00
|
Riveted flap hinges
|
Details
|
|
|
11-01-2007
|
6.00
|
Finished riveting inside bottom wing skins
|
Details
|
|
|
10-31-2007
|
2.00
|
Clean up, move fuselage to hangar.
|
Details
|
|
|
10-25-2007
|
2.50
|
Rivet inside right lower wing skin
|
Details
|
|
|
10-17-2007
|
4.00
|
Assemble pitot to wing, rivet lower interior skin
|
Details
|
|
|
10-15-2007
|
3.00
|
Prime pitot parts
|
Details
|
|
|
10-14-2007
|
6.00
|
Mounted pitot on left wing
|
Details
|
|
|
10-14-2007
|
2.00
|
Cut pitot hole in skin
|
Details
|
|
|
01-01-2007
|
3.00
|
Sealed tank
|
Details
|
|
|
01-01-2007
|
5.00
|
Finished right wing
|
Details
|
|
|
12-31-2006
|
3.00
|
Cut cover plate for wing tank
|
Details
|
|
|
12-21-2006
|
3.00
|
Ran plastic conduit, worked on tank
|
Details
|
|
|
12-19-2006
|
2.00
|
Attach right flap
|
Details
|
|
|
12-18-2006
|
3.00
|
Attach flap brace, aileron right wing
|
Details
|
|
|
12-14-2006
|
2.00
|
Attach aileron brackets and gap fairing
|
Details
|
|
|
12-11-2006
|
1.00
|
Leak tested right wing
|
Details
|
|
|
12-10-2006
|
9.00
|
Riveted right wing
|
Details
|
|
|
12-07-2006
|
3.00
|
Prepared wing for flap attachment
|
Details
|
|
|
12-06-2006
|
1.50
|
Attached aileron to left wing
|
Details
|
|
|
12-04-2006
|
2.00
|
Installed bellcrank
|
Details
|
|
|
12-03-2006
|
5.00
|
Completed left flap assembly
|
Details
|
|
|
12-02-2006
|
4.00
|
Completed right flap assembly
|
Details
|
|
|
12-01-2006
|
2.00
|
Began right flap assembly
|
Details
|
|
|
11-30-2006
|
5.00
|
Assembled ailerons to completion
|
Details
|
|
|
11-29-2006
|
2.50
|
Riveted aileron stiffeners and frame
|
Details
|
|
|
11-28-2006
|
3.00
|
Assembled aileron hinge brackets, etc
|
Details
|
|
|
11-22-2006
|
7.00
|
Sprayed remaining parts
|
Details
|
|
|
11-21-2006
|
3.50
|
Setup spray booth for painting
|
Details
|
|
|
11-19-2006
|
6.50
|
Riveted leading edge to right wing
|
Details
|
|
|
11-19-2006
|
5.00
|
Prepared paint booth and parts
|
Details
|
|
|
11-18-2006
|
7.00
|
Alumidined all aileron and flap parts - ready to p
|
Details
|
|
|
11-12-2006
|
2.00
|
Set right wing skeleton on frame
|
Details
|
|
|
11-12-2006
|
11.00
|
Riveted top skin to left wing
|
Details
|
|
|
11-11-2006
|
4.00
|
Scrubbed aileron and flap parts
|
Details
|
|
|
11-11-2006
|
4.50
|
Riveted leading edge, mounted tank, clecoed top sk
|
Details
|
|
|
11-11-2006
|
1.50
|
Prepared wing access panels
|
Details
|
|
|
11-10-2006
|
2.00
|
Scrubbed aileron and flap parts
|
Details
|
|
|
11-09-2006
|
2.00
|
Scrubbed aileron and flap parts
|
Details
|
|
|
11-07-2006
|
1.50
|
Scrubbed aileron and flap parts
|
Details
|
|
|
11-02-2006
|
2.50
|
Prepared pushroads - ready for paint prep
|
Details
|
|
|
11-01-2006
|
2.50
|
Prepared pushrods
|
Details
|
|
|
10-31-2006
|
3.50
|
Prepared flaps - ready for paint prep
|
Details
|
|
|
10-30-2006
|
3.00
|
Prepared flaps
|
Details
|
|
|
10-29-2006
|
6.00
|
Prepared flaps
|
Details
|
|
|
10-29-2006
|
5.00
|
Prepared ailerons - ready for paint prep
|
Details
|
|
|
10-28-2006
|
8.00
|
Prepared ailerons
|
Details
|
|
|
10-27-2006
|
4.00
|
Riveted left leading edge to spar
|
Details
|
|
|
10-26-2006
|
7.00
|
Riveted leading edges
|
Details
|
|
|
10-24-2006
|
2.50
|
Deburred and clecoed stiffeners to skins
|
Details
|
|
|
10-20-2006
|
2.00
|
Cut aileron skin stiffeners
|
Details
|
|
|
10-17-2006
|
2.50
|
Match drilled aileron brackets
|
Details
|
|
|
10-16-2006
|
2.50
|
Finished landing light assemblies
|
Details
|
|
|
10-15-2006
|
5.00
|
Riveted right wing baffle
|
Details
|
|
|
10-15-2006
|
1.50
|
Finished riveting left tank
|
Details
|
|
|
10-14-2006
|
4.00
|
Riveted baffle to left tank
|
Details
|
|
|
10-14-2006
|
2.00
|
Installed fuel pickups and plates
|
Details
|
|
|
10-14-2006
|
2.00
|
Finished installing sensor plates
|
Details
|
|
|
10-14-2006
|
2.50
|
Cleaned up clecos and tools
|
Details
|
|
|
10-13-2006
|
6.00
|
Riveted T-410's and T-405's to leading edges
|
Details
|
|
|
10-12-2006
|
3.50
|
Riveted outside ribs to left tank
|
Details
|
|
|
10-10-2006
|
3.50
|
Riveted outside ribs to right tank
|
Details
|
|
|
10-09-2006
|
7.00
|
Riveted 4 ribs to tanks
|
Details
|
|
|
10-08-2006
|
13.00
|
Riveted 6 internal tank ribs
|
Details
|
|
|
10-08-2006
|
2.50
|
Finished fuel pickups and vent tubes
|
Details
|
|
|
10-06-2006
|
5.00
|
Riveted ribs to main spars
|
Details
|
|
|
10-05-2006
|
2.00
|
Masked tanks for rib assembly
|
Details
|
|
|
10-03-2006
|
3.00
|
Fabricated fuel vent lines.
|
Details
|
|
|
10-01-2006
|
10.00
|
Assemble stiffeners to right tank
|
Details
|
|
|
09-30-2006
|
2.00
|
Clean parts for tank assembly
|
Details
|
|
|
09-30-2006
|
2.00
|
Attached ribs to right rear spar
|
Details
|
|
|
09-30-2006
|
6.00
|
Assembled stiffeners to left tank
|
Details
|
|
|
09-29-2006
|
2.00
|
Final assembly of rear spars
|
Details
|
|
|
09-29-2006
|
1.50
|
Attached ribs to left rear spar
|
Details
|
|
|
09-28-2006
|
3.00
|
Attacked nutplates to main spars
|
Details
|
|
|
09-25-2006
|
3.00
|
Prime front spars and nutplates
|
Details
|
|
|
09-24-2006
|
9.00
|
Scrub and prime leading edge skins and ribs
|
Details
|
|
|
09-23-2006
|
14.00
|
Preped and primed small parts and ribs
|
Details
|
|
|
09-17-2006
|
8.00
|
Primed right wing ribs and skins
|
Details
|
|
|
09-16-2006
|
14.50
|
Preped right wing ribs and skins for priming
|
Details
|
|
|
08-08-2006
|
2.50
|
Trim lenses, countersink holes
|
Details
|
|
|
08-08-2006
|
1.00
|
Drill lens holes
|
Details
|
|
|
08-07-2006
|
1.50
|
Install lights in brackets
|
Details
|
|
|
08-06-2006
|
3.00
|
Start landing light installation
|
Details
|
|
|
08-06-2006
|
6.00
|
Deburr and dimple skins - right wing ready for pri
|
Details
|
|
|
08-05-2006
|
7.00
|
Dimple ribs, spars, and prepare parts
|
Details
|
|
|
08-04-2006
|
2.00
|
Prepare skins for dimpling
|
Details
|
|
|
08-03-2006
|
1.00
|
Dissasemble right wing
|
Details
|
|
|
08-02-2006
|
0.50
|
Drill holes for filler flange and drain
|
Details
|
|
|
08-01-2006
|
1.50
|
Prepare capacitive fuel sensor plates
|
Details
|
|
|
07-31-2006
|
1.75
|
Final prep on inboard tank rib
|
Details
|
|
|
07-31-2006
|
0.25
|
Drill T405 tank attach angle
|
Details
|
|
|
07-30-2006
|
0.50
|
Match drill leading edge
|
Details
|
|
|
07-30-2006
|
1.00
|
Machine countersink tank skin
|
Details
|
|
|
07-30-2006
|
1.50
|
Install fuel tank baffle
|
Details
|
|
|
07-30-2006
|
0.50
|
Disassemble tank
|
Details
|
|
|
07-30-2006
|
1.00
|
Attach tank skin to baffle and adjust
|
Details
|
|
|
07-30-2006
|
2.50
|
Attach ribs and tank skin and match drill
|
Details
|
|
|
07-29-2006
|
1.00
|
Started right wing - cleco and match drill ribs to
|
Details
|
|
|
07-29-2006
|
0.25
|
Redrilled holes for electrical conduit to 3/4"
|
|
|
|
07-29-2006
|
0.50
|
Prepare scarf joint on skins
|
|
|
|
07-29-2006
|
0.50
|
Mount wing skeleton to framd
|
|
|
|
07-29-2006
|
1.00
|
Mount and match drill top skins
|
|
|
|
07-29-2006
|
0.75
|
Mount and match drill bottom skins
|
|
|
|
07-29-2006
|
0.50
|
Make root doubler plate
|
|
|
|
07-29-2006
|
1.50
|
Dimpled top skins
|
Details
|
|
|
07-29-2006
|
0.50
|
Dimpled tank ribs and skin
|
Details
|
|
|
07-29-2006
|
2.00
|
Dimpled bottom skins - left wing ready to prime
|
Details
|
|
|
07-29-2006
|
0.50
|
Cleco leading edge to spar, drill joint plate
|
|
|
|
07-29-2006
|
0.50
|
Cleco leading edge in cradle
|
|
|
|
07-28-2006
|
1.00
|
Dimpled skins
|
Details
|
|
|
07-28-2006
|
1.00
|
Dimpled ribs
|
Details
|
|
|
07-28-2006
|
0.50
|
Deburr skins
|
Details
|
|
|
07-27-2006
|
2.50
|
Deburr skins
|
Details
|
|
|
07-25-2006
|
1.25
|
Deburr skins
|
Details
|
|
|
07-25-2006
|
0.75
|
Deburr joint plate for nutplates
|
Details
|
|
|
07-25-2006
|
0.75
|
Deburr and countersink rear spar
|
Details
|
|
|
07-25-2006
|
0.75
|
Countersink main spar for skin
|
Details
|
|
|
07-24-2006
|
1.50
|
Deburr rib holes
|
Details
|
|
|
07-24-2006
|
1.00
|
Countersink main spar for skin
|
Details
|
|
|
07-23-2006
|
2.50
|
Rivet stiffener ring to rib
|
Details
|
|
|
07-23-2006
|
2.00
|
Drill tank plate holes & make anti-rotation bracke
|
Details
|
|
|
07-23-2006
|
0.75
|
Drill holes in filler flange
|
Details
|
|
|
07-23-2006
|
0.25
|
Drill holes for tank drain fitting
|
Details
|
|
|
07-23-2006
|
1.50
|
Disassemble left wing and start to deburr parts
|
Details
|
|
|
07-23-2006
|
2.00
|
Deburr tank parts
|
Details
|
|
|
07-23-2006
|
0.50
|
Cut hole in inboard tank rib
|
Details
|
|
|
07-22-2006
|
0.50
|
Solder wire to BNC connector
|
Details
|
|
|
07-22-2006
|
0.25
|
Modified snap bushings
|
Details
|
|
|
07-22-2006
|
1.00
|
Match drill tank holes
|
|
|
|
07-22-2006
|
0.20
|
Match drill joint plate
|
Details
|
|
|
07-22-2006
|
0.25
|
Install plate 2
|
Details
|
|
|
07-22-2006
|
3.00
|
Fabricate tank brackets
|
Details
|
|
|
07-22-2006
|
0.50
|
Fabricate & drill nose reinforcement plate
|
Details
|
|
|
07-22-2006
|
0.25
|
Drill out screw holes
|
|
|
|
07-22-2006
|
0.40
|
Disassemble tank
|
|
|
|
07-22-2006
|
1.40
|
Countersink baffle holes
|
Details
|
|
|
07-22-2006
|
1.20
|
Capacitive sensors - install plate 1
|
Details
|
|
|
07-22-2006
|
0.50
|
Attach wire to outboard plate
|
Details
|
|
|
07-22-2006
|
0.25
|
Attach nutplates to sensor plates
|
Details
|
|
|
07-10-2006
|
0.50
|
Mount ribs to baffle
|
Details
|
|
|
07-10-2006
|
0.50
|
Fit tank skin to baffle
|
Details
|
|
|
07-10-2006
|
0.50
|
Cleco skins to ribs
|
Details
|
|
|
07-09-2006
|
0.50
|
Match drill leading edge
|
Details
|
|
|
07-09-2006
|
0.50
|
Match drill holes in T-712's to main spar
|
Details
|
|
|
07-09-2006
|
1.50
|
Make tank stiffeners and cleco
|
Details
|
|
|
07-09-2006
|
0.20
|
Drill holddown hole in bottom of leading edge
|
Details
|
|
|
07-09-2006
|
1.00
|
Drill for nutplates
|
Details
|
|
|
07-09-2006
|
0.50
|
Drill center holes in T-712's
|
Details
|
|
|
07-09-2006
|
0.10
|
Draw center lines on T-712's
|
Details
|
|
|
07-09-2006
|
0.20
|
Cleco baffel to main spar
|
Details
|
|
|
07-09-2006
|
0.30
|
Back drill T-712 number 1
|
Details
|
|
|
07-08-2006
|
0.50
|
Remove bottom skins
|
Details
|
|
|
07-08-2006
|
1.00
|
Match drill top skins
|
Details
|
|
|
07-08-2006
|
1.00
|
Match drill bottom skins
|
Details
|
|
|
07-08-2006
|
0.50
|
Insert joint plate into leading edge
|
Details
|
|
|
07-08-2006
|
0.50
|
Cleco outboard leading edge to spar
|
Details
|
|
|
07-08-2006
|
0.50
|
Cleco outboard leading edge
|
Details
|
|
|
07-08-2006
|
0.50
|
Cleco bottom skins
|
Details
|
|
|
07-07-2006
|
1.00
|
Mount wing to frame (left wing)
|
Details
|
|
|
07-07-2006
|
0.50
|
Match Drill main rib holes
|
Details
|
|
|
07-07-2006
|
1.00
|
Drill wing doubler plate
|
Details
|
|
|
07-07-2006
|
0.75
|
Cleco top skins
|
Details
|
|
|
07-06-2006
|
1.00
|
Straighten Main Ribs
|
|
|
|
07-06-2006
|
1.50
|
Drill holes for wiring conduit
|
Details
|
|
|
07-06-2006
|
0.50
|
Cleco main ribs to spars (left wing)
|
Details
|
|
|
07-05-2006
|
1.00
|
Straighten main ribs
|
Details
|
|
|
07-04-2006
|
3.50
|
Straightend leading edge ribs
|
Details
|
|
|
07-04-2006
|
2.75
|
Straighten main ribs
|
Details
|
|
|
07-04-2006
|
2.00
|
Deburred main ribs
|
Details
|
|
|
07-03-2006
|
3.50
|
Deburr leading edge ribs
|
Details
|
|
|
07-02-2006
|
1.20
|
Trimmed ends of rear spar inside doubler plates
|
Details
|
|
|
07-02-2006
|
1.70
|
Prepared doubler plates.
|
Details
|
|
|
07-02-2006
|
1.20
|
Prepared doubler plates for spars
|
Details
|
|
|
07-02-2006
|
0.30
|
Drilled out holds for inside doubler plates
|
Details
|
|
|
07-02-2006
|
0.20
|
Clamped doubler plates to rear spar
|
Details
|
|
|
07-01-2006
|
0.50
|
Spot primed the spar
|
Details
|
|
|
07-01-2006
|
1.25
|
Fabricate the tie-down assembly
|
Details
|
|
|
07-01-2006
|
0.60
|
Drilled holes and countersunk for tie-down rivets
|
Details
|
|
|
07-01-2006
|
2.00
|
Deburred edges of rear spars
|
Details
|
|
|
07-01-2006
|
0.30
|
Countersunk center spar for nutplates
|
Details
|
|
|
07-01-2006
|
1.50
|
Countersinked main spar for access plate platenuts
|
Details
|
|
|
07-01-2006
|
2.00
|
Completed platenut countersinking
|
Details
|
|
|
06-29-2006
|
3.00
|
Continued platenut countersinking
|
Details
|
|
|
06-28-2006
|
1.00
|
Made countersink template
|
Details
|
|
|
06-27-2006
|
0.50
|
Started drilling main spars for plate nuts
|
Details
|
|