Powered By Kitlog Pro v2.0
"THE OTHER WOMAN"
RV7A
Electrical
Work Logs Found:
42
Category Work Time:
96 Hours
Date
Hours
Work Log Summary
Details
10-13-2007
3.00
LSE Coil wires
Details
10-09-2007
5.00
Eletrical Wire clean up
Details
09-10-2006
2.00
Wire clean up
Details
09-09-2006
1.00
RG400 Antenna connections Step 1, 2, and 3
Details
09-09-2006
0.10
Building RG400 ends Step 4 and 5
06-14-2006
3.00
Lightspeed coil Bracket
Details
06-10-2006
1.00
Fuel Flow wires
Details
05-28-2006
3.00
More electrical
Details
05-27-2006
3.00
FW forward wire clean up
Details
05-25-2006
3.50
Ignition (Electronic)
Details
05-23-2006
2.00
Manifold pressure
Details
04-28-2006
0.00
More Electrical
04-26-2006
3.00
More Electrical/Engine stand
Details
04-23-2006
4.00
Main Buss power circuit wiring.
Details
04-22-2006
3.00
Main Fuse Buss wiring.
Details
04-15-2006
2.00
Headset Wiring
Details
04-14-2006
3.00
More Forward wiring
Details
04-14-2006
1.00
Headset/Mic cables
Details
04-13-2006
3.00
More Wiring
Details
04-13-2006
1.00
GPS/TruTrak Auto Pilot
Details
04-12-2006
5.00
More grounding and Mic/Headphone jack wires.
Details
04-09-2006
4.00
Terminating ground wires
Details
04-08-2006
4.50
Dimmer circuit boards and wiring
Details
04-04-2006
1.50
Lightspeed ignition module
Details
04-03-2006
2.00
Lightspeed Plasma II mount bracket
Details
04-02-2006
4.00
Manifold pressure sensor and Main Buss Diode
Details
04-01-2006
2.00
Fuse Panel area
Details
03-29-2006
2.00
Radio Stack Wire harnesses
Details
01-02-2006
2.00
Current Limiter and AMP Shunt
Details
09-28-2005
1.00
Fuse Panel #2
Details
09-27-2005
2.50
Fuse Panel
Details
08-11-2005
1.00
Istalled the firewall ground block
Details
08-09-2005
2.00
Wire runs
Details
08-07-2005
1.00
Strobe wires
Details
08-07-2005
2.00
Strobe wires
Details
08-06-2005
1.00
Wire runs for Strobe
Details
08-06-2005
2.00
Details
05-09-2005
1.00
More Strobe power unit install
Details
05-08-2005
2.00
Manufactured Strobe box mounting brackets
Details
05-01-2005
2.00
Electrical Plans
Details
04-28-2005
3.00
Rewired the R/A Flap Switch
Details
04-20-2005
2.00
Studied up on Electrical plans
Details
SITE NAVIGATION
Contact Builder
RV7A Home
Category
# Logs
# Hours
All
824
1335
A/C Hardware & Supplies
5
3
Airshow time
2
Avionics
14
19
Baffles
18
38
Brakes
5
5
Cabin
76
136
Canopy
72
133
Conditional Inspecti
4
8
Cowling
19
47
DAR Inspection
1
4
Electrical
42
96
Elevator
42
67
Empennage
13
21
Engine Run
1
2
Finish Kit
5
6
Firewall Forward
69
97
Flying
2
3
Fuel System
4
9
Fuselage
122
195
Hardware
5
19
Horizontal Stabilizer
46
70
Inspections
4
4
Interior
1
2
Lights
4
6
Miscellaneous
12
8
Oil Cooler
2
3
Panel
40
58
Paperwork
4
4
Prop
4
7
Rudder
43
59
Service Bulletins
1
1
Shipping
2
1
Shop Supplies
11
19
Sub Panel
2
4
Systems
3
6
TC Inspection
3
3
Travels
4
Vertical Stabilizer
21
33
Visit
6
Weight and Balance
1
1
Wheels
13
16
Wings
76
122
Copyright © 2001-2024 Matronics. All Rights Reserved.