Powered By Kitlog Pro v2.0
Johns Web Site
RV-9/9A
Elevators
Work Logs Found:
21
Category Work Time:
90 Hours
Date
Hours
Work Log Summary
Details
02-17-2003
2.00
Elevator Counter Weights
02-16-2003
2.00
Trim Tab
02-15-2003
2.00
Trim Tab
02-10-2003
10.00
Trim Tab
Details
02-03-2003
1.00
Closed Right Elevator
Details
02-03-2003
3.00
Close Left Elevator
Details
02-02-2003
5.00
Assemble Left Elevator
01-25-2003
8.00
Assemble Left Elevator
01-12-2003
1.50
Assemble Right Elevator
01-11-2003
6.00
Assemble Right Elevator
01-05-2003
7.00
Primed R. Elevator & Riveted Stiffeners
Details
01-04-2003
6.00
Dimpled & Primed L. Elevator Parts
Details
12-29-2002
4.00
Dimpled parts for Right Elevator
12-28-2002
1.00
Paint Left Elevator
Details
12-28-2002
7.00
Match drilled Right Elevator Parts
Details
12-27-2002
3.00
Prep Left Elevator for Paint
12-26-2002
3.00
Dimple Left Elevator Parts
12-22-2002
3.00
Prep Left Elevator Parts
12-21-2002
8.00
Prep Left Elevator Parts
12-20-2002
4.00
Lay out Left Elevator
Details
12-14-2002
3.00
Debur & Manufacture Stiffeners (Right)
Details
SITE NAVIGATION
Contact Builder
C182 Home
RV-9/9A Home
Category
# Logs
# Hours
All
79
326
Ailerons
15
63
Documentation
1
1
Elevators
21
90
Empennage
1
2
Flaps
7
34
Horizontal Stabilizer
20
86
Rudder
6
27
Tools
1
4
Vertical Stabilizer
7
19
Copyright © 2001-2025 Matronics. All Rights Reserved.