Date
|
Hours
|
Work Log Summary
|
Details
|
01-27-2007
|
10.00
|
Riveting top skins
|
Details
|
|
|
01-20-2007
|
8.00
|
Installed rollbar
|
|
|
|
01-07-2007
|
5.00
|
Prepped top skin for installation
|
Details
|
|
|
01-06-2007
|
6.00
|
Finished fabricating parking brake valve bracket.
|
Details
|
|
|
12-30-2006
|
6.00
|
permanently installed floors
|
|
|
|
12-29-2006
|
4.00
|
Prepped and installed side covers
|
|
|
|
12-28-2006
|
6.00
|
Installed wire tie brackets
|
|
|
|
12-23-2006
|
6.00
|
Installed conduit under floors and in rear fuselag
|
|
|
|
11-27-2006
|
2.00
|
Installed nut plates, riveted in crotch strap moun
|
|
|
|
11-25-2006
|
4.00
|
Deburred, primed, drilled crotch strap mounts
|
|
|
|
11-11-2006
|
6.00
|
Installed ELT and Strobe Power pack
|
|
|
|
10-21-2006
|
5.00
|
Fabricated and Installed aileron trim
|
|
|
|
10-14-2006
|
4.00
|
Installed rudder cables and fairings
|
|
|
|
10-07-2006
|
6.00
|
Static ports and lines installed
|
|
|
|
09-30-2006
|
4.00
|
ELT and Strobe power supply brackets
|
|
|
|
09-19-2006
|
6.00
|
Fabricated elevator pushrod, stick to bellcrank PR
|
|
|
|
09-16-2006
|
8.00
|
Cut holes for landing gear, fit landing gear weldm
|
|
|
|
09-10-2006
|
6.00
|
Primed and installed autopilot pitch servo bracket
|
Details
|
|
|
09-09-2006
|
6.00
|
finished battery box, statrted autopilot installat
|
Details
|
|
|
09-02-2006
|
6.00
|
Worked on firewall items
|
|
|
|
08-13-2006
|
4.00
|
Drilled middle rib to firewall,
|
|
|
|
08-12-2006
|
6.00
|
Fabricated brackets, forward ribs for instrument p
|
|
|
|
08-06-2006
|
4.00
|
Installed rivets in side rails
|
|
|
|
08-04-2006
|
8.00
|
Finished top skin stiffeners, support structure
|
Details
|
|
|
08-03-2006
|
6.00
|
Plate nut installation, stiffener
|
Details
|
|
|
08-02-2006
|
6.00
|
Riveted F-712 and F-712E
|
|
|
|
08-01-2006
|
4.00
|
Added seat back adjusters
|
|
|
|
07-31-2006
|
4.00
|
Fabricated, deburred, primed more interior parts
|
|
|
|
07-22-2006
|
3.00
|
More interior parts
|
|
|
|
07-21-2006
|
4.00
|
Electric flaps, covers and final assemblies
|
|
|
|
07-20-2006
|
6.00
|
Final positioning of flap actuators and bearing bl
|
|
|
|
07-18-2006
|
2.00
|
More interior stuff
|
|
|
|
07-17-2006
|
7.00
|
Tunnel cover, fuel valve mount, Electric flaps
|
Details
|
|
|
07-16-2006
|
3.00
|
Tunnel cover, Tail tie down bracket
|
|
|
|
07-16-2006
|
5.00
|
Riveted seat backs, fabricated tunnel cover,
|
|
|
|
07-15-2006
|
4.00
|
Seat Backs
|
|
|
|
07-15-2006
|
2.00
|
Elevator bellcrank
|
|
|
|
07-14-2006
|
6.00
|
Fabricated seat backs, ready to deburr and prime
|
|
|
|
07-13-2006
|
6.00
|
Seat back adjusters
|
|
|
|
07-12-2006
|
6.00
|
Fit upper top skin, constructed elevator bellcrank
|
|
|
|
07-11-2006
|
5.00
|
installed rudder pedals in fuselage
|
|
|
|
07-09-2006
|
5.00
|
Rudder pedals and toe brakes
|
|
|
|
07-08-2006
|
6.00
|
Completed step installation, started rudder pedals
|
|
|
|
07-07-2006
|
7.00
|
Step installation
|
Details
|
|
|
07-05-2006
|
6.00
|
Finished brake line mount, assembled control colum
|
|
|