My Lancair -N992BC IVP Garrett
Work Logs Found: 37
Category Work Time: 346 Hours
 Date
Hours
Work Log Summary

Details

 09-14-2006
8.00
finish & fill on rudder, laminates on RH wing to c
Details

 09-07-2006
7.50
fitting & bodywork on rudder, nutplates on passeng
Details
       

 09-06-2006
8.00
sanded rudder for clearance, re-set clearance of r
Details
       

 09-05-2006
7.00
finished tail position/strobe light installation,
Details
       

 09-01-2006
7.50
finished rudder trim tab, started rudder position
Details
       

 08-31-2006
6.50
laminted close out to rudder trim tab, bonded trim
Details
       

 08-30-2006
6.00
closeouts on rudder trim tab, fabricated fairing f
Details
       

 08-29-2006
8.00
fit rudder trim tab actuator arm, formed foam lead
Details
       

 08-28-2006
6.00
continued work on rudder trim tab
Details
       

 08-26-2006
5.50
rudder trim tab fabrication continues
Details
       

 08-25-2006
7.50
began construction of rudder trim tab
Details
       

 08-24-2006
8.00
applied closeout laminates to rudder, finished LH
Details
       

 08-23-2006
5.50
finished rudder closeout gap, fit drill & counters
Details
       

 08-21-2006
8.00
enlarged holes for rudder p/p tubes, fabricated ru
       

 08-19-2006
4.50
removed peel ply from de-icing cuff, laminated LE
Details
       

 08-18-2006
5.50
prep sand & microfill rudder RH half, worked assis
Details

 08-17-2006
5.50
close out rudder LE laminates, bonded RH wing de-i
Details

 08-16-2006
5.50
installed access plates for rudder bull-nose, prep
Details
       

 08-15-2006
8.00
installed LH elevator access panel, bonded LH wing
Details
       

 08-15-2006
5.50
fit check & cleco rudder closeout, bonded TE of LH
Details
     

 08-14-2006
5.50
cut rudder free & trim rudder leading edge closeou
Details
       

 08-12-2006
16.00
trimmed fuel line covers, installed LH vert stabe
Details
       

 07-20-2006
8.00
installed conduit & wiring for tail, sanded area f
Details
       

 07-19-2006
8.00
finished rudder trim servo, installed potential NA
Details
       

 07-18-2006
7.00
final fab of rudder trim servo installation, eleva
Details
       

 07-17-2006
8.00
made carbon pre cured laminate for rudder trim cov
Details
       

 07-14-2006
13.50
located LH elevator insp. cover, laminated for rei
Details
       

 07-13-2006
14.00
installed nutplates for inspection cover, drilled
Details
       

 07-11-2006
10.00
laminated around bulkhead elevator p/p tubes, lami
Details
       

 07-10-2006
12.50
finalized RH vertical stab placement, checked alig
Details
       

 07-07-2006
10.50
marked and trimmed inbd. edge of both elevator hal
Details
       

 07-06-2006
16.00
set up RH vertical fin to proper position, install
Details
       

 07-05-2006
11.00
re-leveled fuselage, marked accurate centerline on
Details
       

 07-03-2006
6.00
prep sanded fuselage for vertical, fabricated & in
Details
       

 06-30-2006
22.00
laminated all areas around horizontal stab to fuse
Details
       

 06-28-2006
10.00
finished horizontal stab incidence & placement, hy
Details
     

 06-26-2006
35.00
fuselage leveled using previous references and wat
Details
       