Powered By Kitlog Pro v2.0
Ron's Web Site
Bearhawk
Avionics
Work Logs Found:
46
Category Work Time:
359 Hours
Date
Hours
Work Log Summary
Details
02-23-2014
26.00
Autopilot Autotrim
Details
07-23-2011
4.00
Headset Power Supply
Details
07-09-2011
1.50
Transponder Antenna
Details
05-13-2011
50.00
Avionics Working (Finally)
Details
03-10-2011
1.50
Pitch Servo Change
Details
12-05-2010
1.00
Autopilot Pitch Servo
Details
12-04-2010
105.00
Avionics Communication
Details
12-03-2010
2.00
Zaon XRF Install
Details
11-03-2010
5.25
ELT Installation
Details
10-10-2010
0.30
Autopilot Pitch Control Arm
Details
06-14-2010
2.00
Infrared Camera 6
Details
05-30-2010
3.00
Marker Beacon Antenna
Details
05-30-2010
3.70
Magnetometer Installation and Wiring
Details
04-27-2010
0.40
GPS Antenna
Details
02-22-2010
1.00
Magnetometer Mount 2
Details
02-21-2010
3.50
AOA Mounting 1
Details
02-17-2010
6.00
Infrared Camera 5
Details
02-16-2010
4.00
Infrared Camera 4
Details
02-13-2010
6.50
Infrared Camera 3
Details
02-01-2010
6.00
Infrared Camera 2
Details
01-25-2010
6.00
Infrared Camera 1
Details
12-12-2009
5.50
Magnetometer Mount 1
Details
12-06-2009
2.50
Temperature Probe Mounting 1
Details
09-18-2009
1.50
Headset Power Supply Conversion
Details
09-15-2009
0.80
GPS Puck Magnet Removal
Details
09-04-2009
7.00
Roll Servo
Details
06-21-2009
6.50
Avionics and electrical wire dressing.
Details
06-11-2009
1.20
Ethernet Cables
Details
05-30-2009
16.00
Avionics Wiring
Details
05-29-2009
16.00
Sensor Wiring
Details
04-24-2009
5.50
Four Little Boxes
Details
03-02-2009
2.25
Avionics support bracket
Details
02-13-2009
2.00
COM-GPS-XM Antenna Install
Details
02-01-2009
1.00
VOR Antenna Mount
Details
08-17-2008
2.00
Panel 3
Details
04-25-2008
6.50
Panel 2
Details
03-31-2008
3.00
Avionics 1
Details
01-26-2008
6.00
Panel 1
Details
10-28-2006
2.00
Front Avionics Mount Pads
Details
07-16-2006
10.00
Overhead Antenna Doubler
Details
07-08-2006
4.00
VOR Antenna Mount 2
Details
07-04-2006
5.00
VOR Antenna Mount
Details
07-02-2006
7.00
Overhead Antenna Mount Fabrication
Details
06-18-2006
3.00
Aft Avionics Shelf
Details
06-12-2006
1.50
ELT bracket mounting
Details
06-11-2006
3.00
Antenna mounting preparation
Details
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
577
2760
Avionics
46
359
Controls
38
143
Electrical
41
177
Empennage
16
42
Engine
87
371
Fabric
37
260
Flight
4
20
Fuel
76
318
Fuselage
94
494
Instruments
11
26
Kit
1
2
Landing Gear/Brakes
38
124
Miscellaneous
9
56
Paint
6
48
Panel
4
10
Prop
4
8
Seats
9
35
Tools
4
11
Wings
52
256
Copyright © 2001-2024 Matronics. All Rights Reserved.