Work Logs Found: 120
Category Work Time: 96 Hours
 Date
Hours
Work Log Summary

Details

 07-10-2012
0.00
XeVision HID and Balast on Duckworks Mount
Details
     

 01-11-2012
0.50
Trace Whelen Base onto Left Wing Tip
Details
       

 01-11-2012
1.00
Left Wing Tip - Cutout for Whelen Position Light
Details
       

 01-10-2012
0.50
Trace Whelen Base onto Right Wing Tip
Details
       

 01-10-2012
1.00
Right Wing Tip - Cutout for Whelen Position Light
Details
       

 01-10-2012
0.50
Disassemble Whelen Position Light
Details
     

 12-07-2010
0.50
Wire Fuel Flow Sensor
Details
     

 11-15-2010
1.00
Secure More Wires in Engine Compartment
Details
       

 10-24-2010
1.00
Secure #2 & #4 Cyl EGT & CHT Wires
Details
       

 10-24-2010
1.00
Secure #2 & #4 Cyl EGT & CHT Wires
Details
       

 10-24-2010
1.00
Secure #1 & #3 Cyl EGT & CHT Wires
Details
       

 10-24-2010
1.00
Secure #1 & #3 Cyl EGT & CHT Wires
Details
       

 05-12-2009
0.50
Remove Forrest of Ground Tabs - Engine Side
Details
       

 10-25-2007
1.00
Ground Whelen Shields, Route Power/Ground Wires
Details
       

 10-24-2007
0.50
Connect Strobe Wires from Wings to Power Supply
Details
     

 10-21-2007
0.50
Test and Reverse Aileron Trim Wiring
Details
     

 10-21-2007
2.50
Complete Trim Relay and Indicator Wiring
Details
       

 10-17-2007
0.50
Install Male Pins on Trim/Stick Cables
Details
     

 10-15-2007
0.50
Switch GMA-340 Power from E-Buss to Main Buss
Details
     

 10-11-2007
0.50
Reinstall SL40 & Test - Works - Rx & Tx!
Details
     

 10-06-2007
0.50
Straighten #9 Pin on J1 GMA-340 Connector
Details
     

 10-06-2007
1.00
Re-Route Battery Buss Wires
Details
       

 10-06-2007
1.00
Re-Route 2 Wires to Main Buss
Details
       

 10-05-2007
0.50
Found Problem with Audio (Receiving)
Details
     

 10-02-2007
1.50
Install Ray Allen Relays on Sub Panel
Details
       

 09-11-2007
1.00
Join Stick Wires to Cable Running to Sub Panel
Details
       

 09-11-2007
0.50
Install BNC Connector on RG400 to Com Antenna
Details
     

 09-06-2007
0.50
Install Spherical Washers on CoPilot Stick
Details
     

 09-05-2007
1.50
Crimp D Sub Pins onto Stick Wires
Details
       

 09-03-2007
0.50
Route Wing Strobe Wires thru Fuselage Conduit
Details
       

 09-03-2007
1.50
Connect Aileron Trim Wires to Sub-Panel Cable
Details
     

 09-02-2007
1.00
Install Ray Allen G205 Stick Grips
Details
     

 09-01-2007
1.50
Drill 3/8 Holes in Sticks for Wiring; Secure Stick
Details
       

 08-31-2007
0.50
Run Strobe Wires from Power Supply Out to Wings
Details
       

 08-31-2007
1.00
Repeat for Mic, Phones, and Remote Compass
Details
     

 08-31-2007
0.50
Cut / Debur Control Sticks
Details
       

 08-31-2007
0.50
Connect Tail Strobe Wire to Whelen Power Supply
Details
     

 08-31-2007
0.50
Connect Pilot Phones to Harness Pigtail
Details
       

 08-30-2007
2.00
Wire Flap Position Module and Test
Details
     

 08-29-2007
1.00
Route Wire for Tail Strobe and Elevator Trim
Details
       

 08-29-2007
1.00
Route Flap Power, Ground, Extend, Retract Wires
Details
     

 08-28-2007
1.00
Finish Wiring Dynon Remote Compass / OAT
Details
     

 08-27-2007
0.50
Partially Wire a 9-Pin D-Sub for Dynon Remote Comp
Details
       

 08-27-2007
0.50
Install Headset Jacks and Route Wires
Details
       

 08-27-2007
0.50
Install Dynon OAT - Outside Air Temp Probe
Details
     

 08-27-2007
1.00
Install Click Bond Tie Wrap Mounts
Details
       

 08-27-2007
0.50
Drill Hole in F-705 Bulkhead for Wires
Details
     

 08-20-2007
0.50
Install Fiberglass Sleeve Around RAC Grip Wires
Details
     

 08-18-2007
1.00
Solder Second Ray Allen G205 Stick Grip
Details
       

 08-15-2007
1.00
Solder First Ray Allen G205 Stick Grip
Details
       

 08-05-2007
1.50
Solder Shielded Wire to Headset Jacks
Details
     

 08-05-2007
0.50
Drill Holes for Wires in Sub-Panel/Support Channel
Details
       

 08-04-2007
1.00
Wire Power and Ground Leads for Trutrak ADI
Details
     

 07-31-2007
1.00
Install Trutrak ADI in Panel
Details
     

 07-14-2007
0.50
Rivet Brackets for Headset Jacks to Fuselage
Details
       

 07-14-2007
0.50
Install GMA340 J1 & J2 Harnesses / Backplate
Details
       

 07-14-2007
1.00
Fabricate Brackets for Headset Jacks
Details
       

 07-08-2007
2.00
Rivet ELT & Whelen Power Supply Brackets
Details
       

 07-07-2007
1.00
Drill ELT & Whelen Power Supply Brackets to Fusela
Details
       

 07-05-2007
1.00
Connect J2 Harness to GMA-340 Backplate - Audio
Details
       

 07-04-2007
1.50
Install GTX-327 Transponder Backplate
Details
       

 07-03-2007
1.00
Screw SL40 Backplate to Tray; Install Antenna
Details
       

 07-03-2007
0.50
Install RG400 to GTX-327 Backplate
Details
       

 07-03-2007
0.50
Install Dynon EDC-D10A Remote Compass
Details
     

 07-01-2007
1.00
Install RG400 and Harness to SL40 Backplate
Details
       

 06-30-2007
1.00
Fabricate Bracket for Dynon EDC-D10A - Compass
Details
       

 06-30-2007
1.00
Drill EDC-D10A Bracket to Vertical Baggage Support
Details
       

 06-29-2007
1.00
Wire Falcon Turn Coordinator
Details
       

 06-28-2007
0.50
Install Transponder Antenna
Details
       

 06-28-2007
1.50
Drill Fuselage for Comant Bent Whip Antenna
Details
       

 06-24-2007
0.50
Install 9-Pin D-Sub on EFIS Remote Compass Wires
Details
     

 06-24-2007
0.50
Connect Dynon EMS and EFIS DSAB's Together
Details
       

 06-21-2007
1.00
Wire Dynon EFIS / EMS Together - DSAB
Details
     

 06-19-2007
0.50
Power Up the Dynon EFIS and EMS Units
Details
       

 06-19-2007
1.00
Install and Wire Manifold Pressure Sensor
Details
       

 06-18-2007
0.50
Wire Tach Pick-up's From P-Leads
Details
       

 06-18-2007
0.50
Wire Carb Temp Sensor to Dynon EMS
Details
     

 06-16-2007
1.50
Wire #1/3 EGT and CHT Probes to Dynon EMS
Details
       

 06-13-2007
1.00
Wire #2/4 EGT and CHT Probes to Dynon EMS
Details
       

 06-13-2007
0.50
Connect Fusible Links to Ammeter Shunt
Details
       

 06-13-2007
0.50
Bundle/Route #2&4 EGT, CHT, Carb Temp Wires
Details
       

 06-11-2007
0.50
Wire Oil/Fuel Pressure and Oil Temp Senders
Details
       

 06-11-2007
0.50
Connect Dynon EFIS & EMS Power / Grounds
Details
       

 06-07-2007
0.50
Wire Dynon EFIS Keep-Alive/Ground Leads
Details
       

 06-07-2007
0.50
Install New 1/4" Ring Terminal on Positive Lead
Details
       

 06-07-2007
0.50
Install New 1/4" Ring Terminal on Ground Lead
Details
       

 06-04-2007
0.50
Wire Starter Contactor to Ignition Switch
Details
       

 06-04-2007
0.50
Enlarge J1/J2 Slots in Sub Panel For Audio Cables
Details
       

 06-02-2007
0.50
Wire the Battery Buss - 14 AWG
Details
       

 06-02-2007
1.50
Wire Fusible Link & E-Buss Alternate Feed Switch
Details
       

 06-01-2007
1.00
18AWG from Volt Reg to Breaker to Master
Details
       

 05-31-2007
0.75
Wire Battery Contactor Portion of Master Switch
Details
       

 05-31-2007
0.25
Test Master Switch / Battery Contactor
Details
     

 05-30-2007
0.50
Run 14AWG from Main to Diode to E-Buss
Details
       

 05-30-2007
0.50
Fabricate 6 AWG Power Cable for Main Buss
Details
     

 05-30-2007
0.50
Connect 6AWG from Bat Relay to Main Buss
Details
       

 05-28-2007
0.50
Install P-Lead's / Grounds to Ignition Switch
Details
       

 05-28-2007
0.50
Connect Wires for Low-Voltage Warning Lamp
Details
       

 05-28-2007
0.50
Connect Right P-Lead / Ground to Right Mag
Details
       

 05-28-2007
0.50
Connect Left P-Lead / Ground to Left Mag
Details
       

 05-27-2007
0.50
Install Solder Sleeve's on P-Leads
Details
       

 05-27-2007
0.50
Install 2 awg Battery + Lead to Master Relay
Details
     

 05-27-2007
1.00
Drill Holes in Firewall for Wires; Install Alt Fld
Details
       

 05-26-2007
1.50
Install Shunt and 60amp Current Limiter
Details
       

 05-26-2007
0.50
Install Insulator Boots on Starter and Alternator
Details
       

 05-18-2007
1.00
Install 18awg Alternator Field Wire
Details
       

 05-17-2007
1.00
Install Voltage Regulator - B&C LR3C
Details
     

 05-12-2007
0.50
Secure Alternator B-Lead with Adel Clamps
Details
       

 05-12-2007
1.00
Install Dynon Ammeter Shunt
Details
     

 05-12-2007
0.50
Fabricate 4 AWG Alternator B-Lead
Details
       

 05-12-2007
0.50
Bolt 4 AWG B-Lead to Shunt and Alternator
Details
       

 03-31-2007
0.50
Install Braided Engine Grounding Strap
Details
       

 03-24-2007
0.50
Secure P14 2 AWG Starter Wire with Adel Clamps
Details
       

 03-24-2007
0.50
Secure P14 2 AWG Starter Wire with Adel Clamps
Details
       

 03-23-2007
1.00
Install P14 2 AWG to Starter and Contactor
Details
       

 06-23-2006
0.75
Connect Master/Starter Relays with Copper Bars
Details
       

 06-20-2006
0.25
Install Spike Catching Diodes on Relays
Details
     

 06-13-2006
1.00
Install Battery Tray, Battery, and Relays
Details
     

 05-31-2006
1.00
Drill/Install Ground Tabs
Details
       

 05-31-2006
2.00
Drill/Cleco Busses, Approach Sys Hub, Diode