KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
Work Logs Found: 67
Category Work Time: 187 Hours
 Date
Hours
Work Log Summary

Details

 01-06-2013
2.00
Backup Battery System Design
Details

 01-09-2012
6.00
Dimmer Circuit Design and PCB
Details
     

 01-08-2012
8.00
Fuel Sensor PCB
Details
     

 12-22-2011
4.00
ADS-B Setup
Details

 12-20-2011
0.50
Hooking up Magnetometers
Details

 12-16-2011
5.50
Debugging ADSB, More Configuration
Details
     

 12-15-2011
1.00
Making GPS Cables
Details

 12-15-2011
2.00
Configuring Avionics
Details

 12-14-2011
4.00
Powering Up and Configuration
Details
     

 12-14-2011
1.00
Installing Radios
Details

 12-13-2011
3.00
More EFIS Details
Details
     

 12-12-2011
5.00
Initial Power Up of EFIS
Details
     

 12-11-2011
4.00
Low Output Day
Details
     

 12-10-2011
1.00
Swap Com1/Com2
Details

 12-10-2011
0.50
Pitot / Static
Details

 12-10-2011
1.00
FastStack
Details

 12-10-2011
0.50
ADS-B Hookup
Details

 12-09-2011
3.00
Repositioning AHRS
Details

 12-08-2011
0.50
Installing ADS-B Cable
Details

 11-06-2011
3.60
Finished Wiring Avionics Basy --- Well Almost
Details

 11-05-2011
8.00
Avionics Wiriing - Continued
Details

 11-04-2011
3.00
Installing Avionics
Details
       

 11-04-2011
3.00
Avionics Wiring - Power
Details

 11-03-2011
2.00
Panel Rived Up
Details
       

 11-03-2011
3.00

Details
     

 11-02-2011
4.00
Adding Lightening Holes, Assembly
Details
       

 10-30-2011
2.00
Building Avionics Shelf
Details
       

 10-29-2011
0.50
Wiring EDM P3
Details

 10-29-2011
3.00
Avionics Bay - Cont
Details
       

 10-29-2011
2.00
Avionics Bay
Details
       

 10-28-2011
5.00
Starting Avionics Bay
Details
       

 10-27-2011
1.00
EDM Hookup
Details
     

 10-23-2011
2.00
Engine Monitor Harness
Details

 10-11-2011
1.00
Laying out
Details

 10-10-2011
3.00
Machining Stack Mounts
Details

 10-06-2011
3.00
Magnetometer Wiring
Details
       

 10-06-2011
2.00
Installing Magentometers
Details
       

 10-05-2011
1.50
Routing the Magnitometer Cables
Details

 10-05-2011
3.50
Magnetometer Tray
Details
       

 10-02-2011
1.00
Terminate EFIS Lines
Details

 09-26-2011
1.00
Laying Out Panel Connectors
Details

 09-23-2011
8.00
3D CAD of the Instrument Panel
Details
     

 09-22-2011
4.00
Mock Up Panel
Details
     

 09-21-2011
2.00
More Wire Pulls
Details
     

 09-21-2011
1.00
Finalized Panel Layout
Details
     

 09-20-2011
1.50
Sub Panel Design
Details
       

 09-20-2011
3.00
Main Panel Layout
Details
       

 09-06-2011
0.50
Vertical Power - Part 2 - Install
Details
       

 09-06-2011
3.00
Vertical Power - Part 1 - Tray
Details
       

 09-05-2011
3.00
Mounting VP-X Pro
Details

 08-21-2011
0.30
Rebuild Missing Bracket
Details
     

 08-21-2011
1.00
Fast Stack distribution block wiring
Details
       

 08-21-2011
3.00
Basic Stack Assembly
Details
       

 08-20-2011
2.00
Head Scratching
Details
     

 08-10-2011
5.00
Avionics Plan
Details

 04-04-2007
2.00
Starting Panel Electronics
Details
     

 09-10-2006
4.00
Antenna Wires
Details

 09-03-2006
2.00
Routing the Headset & Flap Wires
Details
     

 09-01-2006
2.50
Left Wing Wiring
Details

 08-31-2006
4.00
Wiring Left Side of Aircraft
Details
       

 08-30-2006
12.00
Wiring Right Wing and Empennage
Details
       

 08-28-2006
4.00
Mounting Strobe Controller
Details
       

 08-26-2006
3.00
Planning and Pulling Wire to Empennage
Details
     

 08-15-2006
2.00
Wire Plan
Details

 07-16-2006
1.00
Re Fabrication of Bell Crank Mount
Details

 07-09-2006
1.00
Elevator Bellcrank Servo Mount
Details

 07-04-2006
2.00
Servos
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.