Date
|
Hours
|
Work Log Summary
|
Details
|
07-10-2008
|
19.00
|
Interior work
|
Details
|
|
|
06-22-2008
|
19.00
|
Door pins, locks and hinges
|
Details
|
|
|
04-25-2008
|
26.00
|
Rudder trim and preparation for paint
|
Details
|
|
|
04-06-2008
|
3.00
|
Mounted airfilter box
|
Details
|
|
|
04-05-2008
|
7.00
|
Air scoop and filtered airbox
|
Details
|
|
|
03-24-2008
|
10.00
|
Started applying upholstery
|
Details
|
|
|
03-20-2008
|
17.00
|
Switch support brackets for safety
|
Details
|
|
|
03-15-2008
|
89.00
|
Panel wiring and wingtips
|
Details
|
|
|
02-10-2008
|
8.00
|
Closing the center tunnel
|
Details
|
|
|
02-07-2008
|
58.00
|
Wiring, wiring, wiring and more wiring
|
Details
|
|
|
01-15-2008
|
15.00
|
More wiring and filling and sanding elevators
|
Details
|
|
|
01-08-2008
|
16.00
|
Wiring, airbox and filling rudder
|
Details
|
|
|
12-15-2007
|
14.00
|
Firewall foward work
|
Details
|
|
|
12-11-2007
|
9.00
|
Fairings and cowling
|
Details
|
|
|
12-04-2007
|
17.00
|
Baffling and FFW wiring
|
Details
|
|
|
11-12-2007
|
17.00
|
Baffling, wiring and exhaust system
|
Details
|
|
|
11-07-2007
|
7.00
|
Bonded windows
|
Details
|
|
|
11-04-2007
|
7.00
|
Baffling
|
Details
|
|
|
11-02-2007
|
10.00
|
Cowling and baffling
|
Details
|
|
|
10-30-2007
|
17.00
|
Doors, cowling and wingtips
|
Details
|
|
|
10-20-2007
|
16.00
|
Spinner and Cowling, past 1500 hours !!!!
|
Details
|
|
|
10-17-2007
|
13.00
|
Fitted the cowling
|
Details
|
|
|
10-09-2007
|
9.00
|
Spinner and wingtips
|
Details
|
|
|
09-15-2007
|
15.00
|
Filling and sanding layup, doors and windows
|
Details
|
|
|
09-13-2007
|
5.00
|
Bonded left aft window and made front layup
|
Details
|
|
|
09-12-2007
|
28.00
|
Filling, sanding, priming and bonded windscreen in
|
Details
|
|
|
09-01-2007
|
14.00
|
Filling, sanding and priming
|
Details
|
|
|
08-29-2007
|
19.00
|
Various fuselage work
|
Details
|
|
|
07-14-2007
|
3.00
|
Insulated firewall and leaving for Oshkosh
|
Details
|
|
|
07-11-2007
|
1.00
|
Fitted some parts to the firewall
|
Details
|
|
|
07-10-2007
|
9.00
|
Fuel pump inspection hatch
|
Details
|
|
|
07-03-2007
|
15.00
|
Bonding and riveting cabin top to the structure.
|
Details
|
|
|
07-02-2007
|
7.00
|
Filling and sanding cabin top
|
Details
|
|
|
07-01-2007
|
7.00
|
Filling cabin top gaps and made antenne doublers
|
Details
|
|
|
06-30-2007
|
8.00
|
Manufactured doorhinge nuts
|
Details
|
|
|
06-28-2007
|
9.00
|
Fitting doors and sanding cabin top
|
Details
|
|
|
06-25-2007
|
16.00
|
Fitting the doors
|
Details
|
|
|
06-20-2007
|
3.00
|
Primed panel an trimming left door
|
Details
|
|
|
06-19-2007
|
8.00
|
Bonding left door
|
Details
|
|
|
06-13-2007
|
9.00
|
Priming panel and door trimming
|
Details
|
|
|
05-29-2007
|
5.00
|
Shaping front window
|
Details
|
|
|
12-23-2006
|
2.00
|
Match drilling rear seat backs
|
Details
|
|
|
08-12-2006
|
5.00
|
Match drilled rivet backup strip
|
Details
|
|
|
05-30-2006
|
4.00
|
Match drilled cabin cover
|
Details
|
|
|
05-24-2006
|
4.00
|
Fitted cabin cover
|
Details
|
|
|
05-21-2006
|
5.00
|
Trimming cabin cover
|
Details
|
|