Powered By Kitlog Pro v2.0
DANIEL'S WEB SITE
Exec 162
Electronics
Work Logs Found:
28
Category Work Time:
78 Hours
Date
Hours
Work Log Summary
Details
03-30-2008
1.50
Installed the overhead panel
Details
02-10-2008
1.00
Antenna cable
Details
11-03-2006
4.00
Trouble shot radio problem
Details
09-23-2006
2.00
Energized Electronics
Details
09-22-2006
3.00
Final Wiring
Details
06-15-2006
2.00
Position lights
Details
06-14-2006
1.50
Position Lights
Details
06-12-2006
2.00
Test install of instrument panel
Details
06-07-2006
3.00
Main airframe wiring continued
Details
06-06-2006
3.00
Airframe Wiring
Details
06-05-2006
2.50
Airframe wiring
Details
06-03-2006
2.50
Airframe wiring
Details
06-02-2006
3.00
Radio and panel wiring
Details
06-01-2006
3.00
Radio Wiring
Details
05-26-2006
3.00
Radio wiring
Details
05-25-2006
3.00
Radio wiring
Details
05-24-2006
4.00
Instrument Panel Wiring
Details
05-22-2006
1.50
Garmin installation
Details
05-20-2006
2.00
Floor pan wiring
Details
05-14-2006
3.00
Switch panel
Details
05-13-2006
4.00
Avionics and Main wiring harness
Details
05-09-2006
4.00
Intercom Wiring harness
Details
05-07-2006
2.50
Radio Wire Harness
Details
05-04-2006
3.00
Wiring diagrams
Details
04-28-2006
5.00
Wiring of panel
Details
04-10-2006
3.00
Switch Panel
Details
09-16-2005
5.00
ECU's and Ignition Modules
Details
08-26-2005
1.50
ECU chassis
Details
SITE NAVIGATION
Contact Builder
Exec 162 Home
Category
# Logs
# Hours
All
319
1114
Airframe and Landing Gear
5
29
Avionics
5
12
Clutch assembly
1
2
Control Systems
27
78
Cooling System
8
20
Electronics
28
78
Empennage
12
44
Engine
8
22
Fuel System
12
33
Fuselage
69
236
Hardware
4
10
Heat Shielding
6
22
Instruments
16
38
Interior
22
57
lower engine mount
1
8
Main Rotor
27
72
Miscellaneous
15
46
None
4
1
Painting
17
171
Power train
10
24
Systems
4
12
Tail Boom
10
35
Tools
3
12
Workshop and Inventory
5
52
Copyright © 2001-2024 Matronics. All Rights Reserved.