Dans RV8
Work Logs Found: 98
Category Work Time: 344 Hours
 Date
Hours
Work Log Summary

Details

 06-23-2019
1.50
New Forward Skin
Details
       

 11-13-2011
2.00
Panel Completion
Details

 11-11-2011
0.50
Wemac
Details
     

 11-10-2011
4.00
Rebuild Avionics Mounting Panel
Details
       

 11-02-2011
1.50
Tech Inspection by EAA
Details

 09-06-2011
3.00
Parking Brake Remount
Details
       

 11-02-2008
4.00
Plumbing Brakes
Details
     

 11-02-2008
8.00
Baffle Fitting
Details
       

 12-10-2007
2.00
Polishing
Details
     

 12-10-2007
6.00
Parking Brake
Details
       

 12-10-2007
7.00
Layout of the Engine Sub-Panel
Details
       

 12-10-2007
3.00
Completion of the Avionics and Lighting Subpanel
Details
     

 12-09-2007
6.00
Side Panel Wiring
Details
       

 12-09-2007
6.00
Mounting Rudder Pedals and Brake Lines
Details
     

 04-23-2007
6.00
Tagging and Planning
Details

 04-22-2007
3.00
Running Tubing
Details

 04-22-2007
6.00
Building Rear Seat Assembly
Details

 04-14-2007
10.00
More painting of fuselage parts
Details
       

 04-13-2007
10.00
Painting Small Fuselage Interior Parts
Details
       

 04-12-2007
14.00
Paint Booth
Details
       

 04-11-2007
6.00
Repainting the Interior
Details
     

 04-02-2007
1.00
Picking up the airplane
Details

 03-26-2007
2.00
The plane goes to the paint shop
Details

 03-23-2007
10.00
Painting for Prep
Details

 01-14-2007
20.00
Joining Wings
Details
       

 09-17-2006
2.00
Right Side Panel
Details

 09-10-2006
4.00
Side Panels
Details

 09-10-2006
2.00
Pilot Seat
Details

 09-04-2006
2.00
Stiffening the Air Ramp
Details
     

 09-04-2006
6.00
Mouting the Landing Gear
Details
       

 08-29-2006
2.00
Side Panels
Details
     

 08-28-2006
1.00
Attaching Brake Cylinders
Details
     

 08-27-2006
3.00
Baggage Skin Prepp
Details

 08-20-2006
4.00
Assembling Seat Backs
Details
     

 08-19-2006
2.00
Prepping Material
Details

 08-19-2006
2.00
Prepping and Painting the Battery Holder
Details

 08-19-2006
2.00
Assembly
Details

 08-18-2006
2.00
Rudder Peddle Adjustment Latch
Details

 08-13-2006
3.00
Rudder Stops
Details
     

 08-13-2006
5.00
Plate Nuts
Details
     

 08-13-2006
3.00
Fabricating Battery Tray
Details
     

 08-12-2006
8.00
Installing Rudder
Details
     

 08-12-2006
12.00
Elevator Controls
Details
     

 08-10-2006
3.00
Riveting and Bolting
Details
     

 08-09-2006
3.00
Setting Incidence
Details

 08-09-2006
3.00
Oxygen Tank Mounts
Details
       

 08-08-2006
6.00
Attaching the Vertical Stabilizer
Details

 08-07-2006
3.00
Setting Incidence
Details

 08-05-2006
2.00
Joining HS to Fuselage
Details

 08-04-2006
2.00
Joining Horizontal Stab
Details

 07-25-2006
2.00
Receiving Finish Kit
Details
       

 07-25-2006
1.00
Installing Rudder Cables
     

 07-20-2006
2.00
Planning
Details

 07-19-2006
1.50
Installed the Servo Elevator Bellcrank
Details
     

 07-19-2006
1.50
Installed the front canopy support
Details
     

 07-19-2006
3.00
Drilling Baggage Skin
Details
       

 07-17-2006
4.00
Preppig and Drilling Skin
Details

 07-17-2006
1.50
Installing Pilot Back Support
Details

 07-09-2006
3.00
Platenuts and Prepping
Details
     

 07-09-2006
2.00
Mounting Rudder Pedals
Details
     

 07-08-2006
2.00
Match Drilled Floors
Details

 07-07-2006
2.00
Mid Cabin Floors
Details

 07-07-2006
3.00
Installing Consoles
Details
       

 07-07-2006
3.00
Drilling and Prepping
Details

 07-06-2006
2.00
Left Console
Details

 07-04-2006
2.00
Riveting and Fabrication
Details
     

 07-04-2006
2.00
Mounting Baggage Floor
Details
     

 07-04-2006
2.00
Left Console
Details
     

 07-03-2006
1.50
Rear Side Panels
Details
     

 07-03-2006
2.00
Platnuts, Platenuts, Platenuts
Details

 07-03-2006
3.00
Platenuts
Details
     

 07-03-2006
0.50
Mounting Brackets
Details

 07-02-2006
1.00
Rear Side Panels
Details

 07-02-2006
5.00
Finish Nutplates
Details

 07-01-2006
5.00
Platenut Rivets
Details

 06-30-2006
1.00
Setting up Control Tube
Details

 06-30-2006
0.50
Ordering Oxygen System
Details
       

 06-30-2006
4.00
Mounting the Flap Motor
Details
     

 06-29-2006
1.00
Prepping Platenuts
Details

 06-29-2006
3.00
Flap Weldament
Details

 06-28-2006
4.00
Fabricating Elevator Bell Crank and Push Rods
Details
     

 06-27-2006
2.50
Riveting Floors
Details
     

 06-27-2006
3.00
Mounting Control Column
Details
       

 06-26-2006
2.00
Prep and Paint
Details

 06-26-2006
1.00
Plate Nuts
Details
     

 06-25-2006
1.50
Prep
Details

 06-21-2006
2.00
Correcting Hinges, Drilling skins for platenuts
Details

 06-19-2006
4.50
Riveting Stiffeners
Details

 06-18-2006
7.50
Prepping Floor Skins
Details

 06-15-2006
1.00
Trimming Floor for Removal
Details

 06-14-2006
3.00
Match Drilling Floors
Details
     

 06-13-2006
2.50
Cleco up the floors
Details

 06-10-2006
3.00
Tall Pilot
Details
     

 04-30-2006
1.00
Cradle Completion
Details
     

 04-29-2006
2.00
Beginnings of the Fuselage Cradle
Details
       

 04-24-2006
1.00
Shop Jigs
Details

 04-24-2006
4.00
Parts Inventory
Details

 04-20-2006
2.00
Unloading
Details